8 CAR § 60-1004
8 CAR § 60-1004. Application requirements
Length: 381 wordsOfficial source
(a) Application procedures.
(1) Applications for an individual permit for construction and demolition recovery facilities shall conform to the requirements of Administrative Procedures, 8 CAR pt. 11, and this section.
(2) Applicants applying for coverage under a general permit shall comply with the procedures established in the general permit program.
(b) Application contents. An application for a permit for solid waste recovery facilities shall be made on forms provided by the Division of Environmental Quality and shall include, either on the form or supporting documentation, the following:
(1) Owner of the site and proposed entity responsible for actual operation and maintenance of the facility;
(2) A map or aerial photograph indicating land use and zoning within one-half (1/2) mile of the facility which shall be of scale not smaller than one inch equals five hundred feet (1” = 500’) to show all residences, structures, surface waters, public and private water supply sources, access roads, railroads, airports, historic sites, and other existing features of the project;
(3) Maps indicating the existence of any regulated wetlands or floodplains on or near the site;
(4) A site plan map that delineates:
(A) The proposed or existing buildings and improvements including any staging and storage areas for incoming solid waste and recovered materials;
(B) Survey boundary locations, the location of existing and proposed access roads, utilities, and any other site improvements; and
(C) General site topography, existing and proposed drainage characteristics including any run-on and run-off control systems that will be constructed;
(5) A description of the annual Class 4 types of solid waste throughput and the service area population (both present and projected), and the estimated amount of material recovered by type;
(6) Permit plans and specifications clearly indicating the layout and construction that will be undertaken and an engineering narrative describing the facility design;
(7) An operating plan meeting the requirements of this subpart outlining:
(A) The proposed method of operations;
(B) The quantity and source of material to be processed;
(C) The proposed use and distribution of the processed or recovered material;
(D) A plan for the disposal of materials that cannot be used or recovered due to poor quality or changes in market conditions; and
(E) Related details; and
(8) Additional data or information as may be required by the division.