R4-34-701. General

Last amended: 2021Length: 223 wordsOfficial source

Cite as Ariz. Admin. Code § R4-34-701

A. Before construction of an FBB, a manufacturer shall submit to the office: 1. The compliance assurance manual required by R4-34- 702, and 2. The drawings and specifications required by R4-34-703. B. Before performing one of the following, a person shall obtain plan approval: 1. Under R4-34-704(A) for an alteration, 2. Under R4-34-704(B) for a reconstruction, 3. Under R4-34-705 to install an attached accessory structure, and 4. Under R4-34-706 to install an FBB. C. Within 20 business days after receiving a plan submitted under subsection (B), the Department shall perform an administrative review of the plan submittal and if incomplete, require the licensee to provide a complete plan submittal. Within 20 business days after receiving a complete plan submittal, the Department shall approve or disapprove the plan submittal. D. A person that submits a plan under subsection (B) shall ensure the plan conforms to the following standards: 1. Each page is at least 8 1/2 X 11 inches and printed to the scale referenced on the drawing; 2. The font is at least eight point; 3. The cover page includes an index and provides a 3 X 5 inch blank space near the title block; 4. The plan and all details and calculations are sealed by an Arizona registered engineer; and 5. The plan is consistent with all applicable standards referenced at R4-34-102.
R4-34-701: R4-34-701. General | Justis AI