R4-34-704
R4-34-704. Reconstruction Plans
Cite as Ariz. Admin. Code § R4-34-704
A. A manufacturer shall comply with the standards in R4-34-102 when preparing a reconstruction plan. B. A manufacturer preparing a reconstruction plan shall ensure the plan contains the following: 1. A depiction of the configuration before reconstruction; 2. The serial or identification number of the unit; 3. Dimensioned drawings and details identifying all components and specification lists affected by the reconstruction. Electrical, plumbing, gas, and HVAC systems, as applicable, shall be addressed; and 4. Design-analysis calculations for all loads and systems affected by the reconstruction. C. A manufacturer shall include with a reconstruction plan a certification statement regarding existing components, construction, and systems indicating they are structurally sound, functional, and do not pose a life safety threat.