R11-3-704

R11-3-704. Redistribution of Soil

Last amended: 2019Length: 65 wordsOfficial source

Cite as Ariz. Admin. Code § R11-3-704

Before redistributing a stockpile of soil conserved under R11-3- 703, the responsible party shall: 1. Treat the area of disturbance as necessary to reduce potential for slippage of the redistributed soil or to enhance root penetration, and 2. Take steps to redistribute the soil in a manner that: a. Prevents excess compaction, and b. Achieves a thickness consistent with the approved post-aggregate mining land use.
R11-3-704: R11-3-704. Redistribution of Soil | Justis AI