Cal. LAB § 7262

Cal. LAB § 7262

Last amended: 1970Year: 2025Length: 37 wordsOfficial source
When gathering and stacking temporary floor planks from the last panel, the steel erector’s personnel assigned to such work shall be protected by safety belts with life lines attached to a catenary line or other substantial anchorage.
Cal. LAB § 7262 | Justis AI