R.C.S.A. § 25-128-48a

Annular space

SupersededLast amended: 1993Year: 2026Length: 209 wordsOfficial source

Cite as Conn. Agencies Regs. § 25-128-48a

(a) Any annular space between the outside of the casing and the natural materials penetrated by the well shall be filled with suitable material to make this space as impervious to the movement of fluids and competent to support the casing as are the natural materials surrounding the well. The driller may fill the annular space with the natural materials excavated during the drilling of the well to meet the following requirements: (1) the annular space shall be fitted as completely as possible from the bottom of the casing to the land surface without any depressions, voids, holes or channels; (2) the driller shall employ whatever techniques are effective for the existing conditions to achieve maximum density, strength and impermeability of the fill material; and (3) the surface of the fill material shall be sloped away from the casing. (b) In cases where potentially contaminating or corrosive fluids are encountered, or impermeable natural materials cannot be adequately placed and compacted to where geologic conditions or the isolation distance may not be adequate, the annular space shall be grouted for the full length of the casing, or the portion thereof below the frost line or pitless adaptor, so that no fluids may move in the zone needing to be grouted.
R.C.S.A. § 25-128-48a: Annular space | Justis AI