R.C.S.A. § 25-32e-1
Civil penalties
Cite as Conn. Agencies Regs. § 25-32e-1
(a) Applicability. These regulations shall apply to each water company as defined by section 25-32a
of the Connecticut General Statutes. The term "commissioner" means commissioner of
public health or his designated representative.
(b) A water company serving 10,000 or more persons found in violation of one (1) or more
of the following provisions of the Connecticut General Statutes or the Regulations
of Connecticut State Agencies may be subject to a penalty of $5000.00 per day per
violation. A water company serving fewer than 10,000 persons found in violation of
one (1) or more of the following provisions of the Connecticut General Statutes or
the Regulations of Connecticut State Agencies may be subject to the penalties indicated
in subsection (h) of this section.
(1) Monitoring requirements.
(A) Untreated water monitoring.
As used in section 19-13-B102(c) of the Regulations of Connecticut State Agencies.
(B) Water ready for consumption monitoring.
As used in sections 19-13-B102(e)(1) through 19-13-B102(e)(10) of the Regulations
of Connecticut State Agencies.
(C) Source meter reading, reservoir, groundwater source and water use monitoring. As used
in section 19-13-B102(n) of the Regulations of Connecticut State Agencies.
(2) Reporting requirements.
(A) Watershed survey.
As used in section 19-13-B102(b) of the Regulations of Connecticut State Agencies.
(B) Reporting test results.
As used in section 19-13-B102(h) of the Regulations of Connecticut State Agencies.
(C) Reporting reservoir status, groundwater status, and water use.
As used in section 19-13-B102(n) of the Regulations of Connecticut State Agencies.
(D) Cross connection reporting.
As used in section 19-13-B102(f)(2) of the Regulations of Connecticut State Agencies.
(E) Public notification.
As used in section 19-13-B102(i) of the Regulations of Connecticut State Agencies.
(3) Water supply plan requirements.
(A) Submitting water supply plan.
As used in section 25-32d of the Connecticut General Statutes.
(B) Revising water supply plan.
As used in section 25-32d-1a et seq. of the Regulations of Connecticut State Agencies.
(4) Water quality requirements.
(A) Standards for quality of untreated water prior to treatment.
As used in section 19-13-B102 (c) of the Regulations of Connecticut State Agencies.
(B) Water ready for consumption.
As used in sections 19-13-B102(e)(1) through 19-13-B102(e)(6), 19-13-B102(e)(7)(L)
and 19-13-B102(e)(7)(M) of the Regulations of Connecticut State Agencies.
(C) Treatment techniques.
As used in sections 19-13-B102(j) of the Regulations of Connecticut State Agencies.
(5) Operator certification and backflow prevention requirements.
(A) Requirement for certified operators at all community water systems (CWS) and non-transient
non-community (NTNC) treatment plants, as used in section 25-32-9(a) of the Regulations
of Connecticut State Agencies.
(B) Requirement for certified operators at all CWS and NTNC distribution systems that
serve over 1000 persons, as used in section 25-32-11(a) of the Regulations of Connecticut
State Agencies.
(C) Requirement to have devices tested by a person who has met the requirements of section
25-32-11(e) of the Regulations of Connecticut State Agencies, as used in sections
19-13-B38a(f)(6) and 19-13-B38a(f)(7) of the Regulations of Connecticut State Agencies.
(D) Requirement to have consumer premises inspected by a person who has met the requirements
of section 25-32-11(h) of the Regulations of Connecticut State Agencies, as used in
section 19-13-B102(f)(3) of the Regulations of Connecticut State Agencies.
(6) Permits and approval requirements.
(A) Application for a permit as used in section 25-37d-1 of the Regulations of Connecticut
State Agencies.
(B) Submission of plans and specifications for approval of water system improvements as
used in sections 19-13-B80 and 19-13-B102(d)(2) of the Regulations of Connecticut
State Agencies.
(7) Water supply capacity and sufficiency.
Requirement to meet the water supply capacity and sufficiency as used in sections
19-13-B102(o) and 19-13-B102(p) of the Regulations of Connecticut State Agencies.
(c) Notice of violation.
When the commissioner determines that a violation of any provision of the Connecticut
General Statutes or regulations referenced in subsection (b) or (h) of this subsection
has occurred or is occurring, the commissioner may so notify the violator and may
impose a civil penalty in accordance with section 25-32e of the Connecticut General
Statutes and section 25-32e-1 of the Regulations of Connecticut State Agencies, if
compliance is not achieved by the date specified in the notice of violation.
(d) Establishment of civil penalty.
In setting a civil penalty in a particular case, the commissioner shall consider all
factors which he deems relevant, including, but not limited to those listed in section
25-32e of the Connecticut General Statutes.
(e) Total penalty assessment calculation.
(1) The amount of the total penalty assessment may be calculated by adding all the applicable
penalties specified in subsection (b) or (h) of this section for every violation.
(2) Each day the violation continues may constitute a separate violation, and the total
penalty assessment may be calculated as the product of the number of days the water
company is in violation and the amount calculated under subsection (b) or (h) of this
section.
(3) In setting a civil penalty for a violation, the commissioner shall consider relevant
factors, including but not limited to those indicated in subsection (d) of this section
and may as a result of considering these factors, adjust the total civil penalty calculated
pursuant to subsections (e) (1) and (2) of this section.
(4) The commissioner shall not levy a civil penalty under this section if the owner or
operator proves to the commissioner's satisfaction that the violation was caused by
strikes or lockouts; riots, wars, or other acts of violence; floods, hurricanes or
other Acts of God; or other equally severe, unforeseeable accidents the results of
which were unavoidable and uncorrectable, where such acts or events were occasioned
directly upon the owner or operator.
(f) Appeals.
(1) A water company in receipt of a notice of violation issued pursuant to section 25-32e
of the Connecticut General Statutes may petition the commissioner for a hearing to
contest the determination that a violation occurred, the determination a violation
has not been corrected, the initial date of the imposition of the penalty, and the
imposition of a penalty within twenty days after such notice is sent by the commissioner,
pursuant to section 25-32e of the Connecticut General Statutes.
(2) Any water company aggrieved by an adverse determination in a final order of the commissioner
may appeal as set forth in section 25-32e of the Connecticut General Statutes.
(g) Record of adjustment.
The commissioner shall maintain a record of each instance he adjusts a civil penalty
pursuant to subsection (f) of this section. The record shall include the name and
address of the violator, the amount of the penalty before and after adjustment, and
the reasons for adjustment.
(h) Schedules of penalties.
The following schedules of maximum penalties shall be used by the department to calculate
penalties.
(1) Monitoring requirements
Any water company serving fewer than 10,000 persons which fails to fulfill a monitoring
requirement on or before the established compliance date or fails to provide results
from an appropriately certified laboratory or certified operator as required may be
found by the commissioner to be in violation of one or more of the provisions of the
Regulations of Connecticut State Agencies. Each individual monitoring requirement
that is not satisfied at the frequency required for such water company shall be considered
a separate violation and may be subject to the applicable penalties per day, per violation
indicated below:
(A) Testing for bacteria
$ 100
(B) Testing for all physical parameters
60
(C) Testing for a single physical parameter
30
(D) Testing for all inorganic chemicals
1,000
(E) Testing for a single inorganic chemical parameter
100
(F) Testing for all pesticides, herbicides and PCBs
5,000
(G) Testing for a single pesticide, herbicide or PCB
1,000
(H) Testing for all organic chemicals
2,000
(I) Testing for a single organic chemical parameter
500
(J) Testing for all radiological parameters
1,000
(K) Testing for a single radiological parameter
500
(L) Testing for free chlorine residual
30
(M) Testing for corrosion control chemicals
70
(N) Reading source meter
50
(O) Monitoring reservoir
75
(P) Monitoring ground water source
75
(Q) Monitoring water use
75
(2) Reporting requirements
Any water company serving fewer than 10,000 persons which fails to fulfill a reporting
requirement on or before the established compliance date may be found by the commissioner
to be in violation of one or more of the provisions of the Regulations of Connecticut
State Agencies. Each individual reporting requirement that is not satisfied at the
frequency required for such reporting requirement shall be considered a separate violation
and may be subject to the applicable penalties per day, per violation indicated below:
(A) Submitting watershed survey
$ 5000
(B) Submitting test results
100
(C) Submitting reservoir status report
50
(D) Submitting ground water status report
50
(E) Submitting water use report
25
(F) Submitting cross-connection report
5000
(G) Making public notice
1000
(3) Water supply plan requirements
Any water company serving fewer than 10,000 persons which fails to submit or revise
a water supply plan on or before the established compliance date, may be found by
the commissioner to be in violation of one or more of the provisions of the Regulations
of Connecticut State Agencies and may be subject to the applicable penalties per day,
per violation indicated below:
(A) Submitting water supply plan
$ 5000
(B) Revising water supply plan
1000
(4) Water quality requirements
Any water company serving fewer than 10,000 persons which is found by the commissioner
to be in violation of one (1) or more of the provisions of sections 19-13-B102(c),
19-13-B102(e)(1) through 19-13-B102(e)(6), 19-13-B102(e)(7)(L), 19-13-B102(e)(7)(M)
and 19-13-B102(j) of the Regulations of Connecticut State Agencies may be subject
to a maximum penalty of $5,000.00 per day per violation.
(5) Certified operator requirements
(A) Any water company serving 3,300 or more persons, and fewer than 10,000 persons which
is found by the commissioner to be in violation of one (1) or more of the provisions
of section 25-32-9(a) and 25-32-11(a) of the Regulations of Connecticut State Agencies,
may be subject to a maximum penalty of $2500.00 per day per violation.
(B) Any water company serving 1,000 or more persons, and fewer than 3,300 persons which
is found by the commissioner to be in violation of one (1) or more of the provisions
of sections 25-32-9(a) and 25-32-11(a) of the Regulations of Connecticut State Agencies,
may be subject to a maximum penalty of $1000.00 per day per violation.
(C) Any water company serving 25 or more persons, and fewer than 1,000 persons which is
found by the commissioner to be in violation of one (1) or more of the provisions
of sections 25-32-9(a) and 25-32-11(a) of the Regulations of Connecticut State Agencies,
may be subject to a maximum penalty of $500.00 per day per violation.
(6) Backflow prevention requirements.
Any water company serving fewer than 10,000 persons which is found by the commissioner
to be in violation of one (1) or more of the provisions of sections 25-32-9(a), 25-32-11(a),
25-32-11(e), 25-32-11(h), 25-32-12(a), 19-13-B38a(f)(6), 19-13-B38a(f)(7) and 19-13-B102(f)(3)
of the Regulations of Connecticut State Agencies may be subject to a maximum penalty
of $5,000.00 per day per violation.
(7) Permits and approval requirements.
Any water company serving fewer than 10,000 persons which is found by the commissioner
to be in violation of one (1) or more of the provisions of sections 19-13-B80, 19-13-B102(d)(2)
and 25-37d-1 of the Regulations of Connecticut State Agencies may be subject to a
maximum penalty of $5,000.00 per day per violation.
(8) Water supply capacity and sufficiency.
Any water company serving fewer than 10,000 persons which is found by the commissioner
to be in violation of one (1) or more of the provisions of sections 19-13-B102(o)
and 19-13-B102(p) of the Regulations of Connecticut State Agencies may be subject
to a maximum penalty of $5,000.00 per day per violation.