R.C.S.A. § 29-223-25a
Operating near electric power lines
Cite as Conn. Agencies Regs. § 29-223-25a
(a) Hoisting equipment shall be operated so that no part of the hoisting equipment or
load enters into the danger zone identified in the "Required Clearance for Normal Voltage in Operation Near High Voltage Power Lines
and Operation in Transit with No Load and Boom or Mast Lowered" table contained within ANSI B30.5-2004, Mobile and Locomotive Cranes, hereafter "the ANSI table." ANSI standards may be obtained by contacting ANSI at
ansi.org.
(b) Exceptions to subsection (a) of this section include those instances where the electrical
distribution and transmission lines have been de-energized and visibly grounded at
the point of work, or insulating barriers that are not a part of nor an attachment
to the hoisting equipment have been erected to prevent physical contact with the lines.
In the case of a line that has been de-energized, the operator shall obtain written
verification from the property owner or electric utility before work begins.
(c) The minimum clearance for lines rated 50 kV or below shall be 10 feet.
(d) Caution shall be exercised when working near overhead lines because they can move
horizontally or vertically due to wind.
(e) A qualified signal person shall be assigned to observe the clearance when the hoisting
equipment moves to within a boom's length of the limits specified in the ANSI table.
(f) The requirements of this section shall be met notwithstanding the use of such safety
features as cage-type boom guards, insulating links or proximity warning devices.
When used, operators shall understand the limitations of such devices and shall test
them in such manner and with such frequency as the manufacturer may prescribe.
(g) Durable signs shall be installed at the operator's station and on the outside of the
hoisting equipment warning of the possibility of death or serious bodily injury if
appropriate clearances are not maintained.