R.C.S.A. § 29-232-5

Notification of inspection

Last amended: 1987Year: 2026Length: 44 wordsOfficial source

Cite as Conn. Agencies Regs. § 29-232-5

The owner or user shall prepare each boiler for internal inspection and shall prepare for and apply a hydrostatic pressure test when required on the date specified by an inspector, which date shall be not less than seven days after the date of notification.
R.C.S.A. § 29-232-5: Notification of inspection | Justis AI