Conn. Gen. Stat. § 29-276a
Moratorium on “lift-slab” construction. Regulations.
(b) The State Building Inspector and the Codes and Standards Committee shall adopt regulations in accordance with the provisions of chapter 54 specifying stringent safety requirements relative to the use of the “lift-slab” method of construction.