19 DCMR 4350

4350. NEGOTIATIONS OF ARCHITECT-ENGINEER CONTRACTS

Last amended: 2008Length: 197 wordsOfficial source

Cite as D.C. Mun. Regs. tit. 19, § 4350

4350 NEGOTIATIONS OF ARCHITECT-ENGINEER CONTRACTS 4350.1 The CCO shall first attempt to negotiate a contract with the highest rated qualified firm for the required services at a price which the CCO determines in writing to be fair and reasonable to the Library. 4350.2 The CCO shall inform the firm that no construction contract may be awarded to the firm that designed the project, except as provided in Section 4339 4350.3 The CCO shall ensure that the firm has a clear understanding of the scope of work, specifically, the essential requirements involved in providing the required services, and shall determine whether the firm will make available the necessary personnel and facilities to perform the services within the required time. 4350.4 The CCO shall limit the firm's subcontracting to firms agreed upon during negotiations or through a formal contract modification. 4350.5 If a mutually satisfactory contract cannot be negotiated, the CCO shall notify the firm in writing that negotiations are terminated. The CCO shall then initiate negotiations with the next rated qualified firm on the list. This procedure shall continue until a mutually satisfactory contract has been negotiated. SOURCE: Final Rulemaking published at 55 DCR 493 (January 18, 2008).
19 DCMR 4350: 4350. NEGOTIATIONS OF ARCHITECT-ENGINEER CONTRACTS | Justis AI