11-K DCMR 315

315. ZONING COMMISSION REVIEW โ€“ GENERAL (USN)

Last amended: 2016Length: 187 wordsOfficial source

Cite as D.C. Mun. Regs. tit. 11-K, ยง 315

ZONING COMMISSION REVIEW โ€“ GENERAL (USN) Due to the unique nature of the USN zone, all proposed buildings, structures, or any proposed exterior renovation to any existing buildings or structures that would result in an alteration of the exterior design, as well as any associated open spaces such as parks or plazas, shall be subject to review and approval by the Zoning Commission in accordance with the following provisions. No review or approval by the Zoning Commission is required for construction of foundation systems within the USN zone. Subtitle K ยงยง 316 and 317 describe the following types of Zoning Commission reviews: Master plan; Stage 1; Stage 2; and Consolidated. Any application must be signed by the owner of the subject air rights lot, but need not be signed by the owner of the subjacent lots, even if a portion of the platform extends into the air space below the level of the air rights lot. SOURCE: Final Rulemaking published at 63 DCR 2447, 3176 (March 4, 2016 โ€“ Part 2). District of Columbia Municipal Regulations Zoning Regulations of 2016: Special Purpose Zones 11-K DCMR ยง 315
11-K DCMR 315: 315. ZONING COMMISSION REVIEW โ€“ GENERAL (USN) | Justis AI