12-K DCMR A101
A101. GENERAL
Cite as D.C. Mun. Regs. tit. 12-K, ยง A101
A101 GENERAL
Strike Section A101.1 in Appendix A of the International Green Construction in its entirety and insert new Section A101.1 in Appendix A of the Green Construction Code in its place to read as follows:
A101.1 Scope. Appendix A shall only apply to projects within the scope of the Green Construction Code as set forth in Section 101.4.9.3 of the Building Code that are either new construction, Level 2 alterations, Level 3 alterations, or core-and-shell projects (where less than 60 percent) of the interior occupiable area is completed with permanent lighting, wall partitions, HVAC equipment, and plumbing systems).
SOURCE: Final Rulemaking published at 67 DCR 6509 (May 29, 2020 โ Part 2).
The District of Columbia Green Construction Code (2017), referred to as the โGreen Construction Code,โ consists of the 2012 edition of the International Green Construction Code (International Green Construction Code), published by the International Code Council (ICC), as amended by the District of Columbia Green Construction Code Supplement of 2017 (12-K DCMR). The International Green Construction Code is copyrighted by the ICC and therefore is not republished here. However, a copy of the text may be obtained at:
https://codes.iccsafe.org/public/document/toc/548/.
District of Columbia Municipal Regulations
Green Construction Code Supplement of 2017
12-K DCMR ยง A101