346 NLRB 425
West Penn Power Co.
WEST PENN POWER CO.
346 NLRB No. 42
425
West Penn Power Company and the Potomac Edison
Company d/b/a Allegheny Power and Allegheny
Energy Supply Company, LLC, A Single Em-
ployer, and their agent Allegheny Energy Ser-
vice Corporation and Utility Workers Union of
America System Local 102, AFL–CIO. Cases 6–
CA–31003, 6–CA–31204, 6–CA–31400–2, and 6–
CA–31623
January 31, 2006
SUPPLEMENTAL DECISION AND ORDER
BY CHAIRMAN BATTISTA AND MEMBERS SCHAUMBER
AND WALSH
On July 11, 2003, the National Labor Relations Board
issued its Decision and Order in this proceeding,1 in
which it found, inter alia, that the Respondent had vio-
lated Section 8(a)(5) and (1) of the Act by refusing to
provide the Union with requested “non-financial” infor-
mation pertaining to subcontracting, such as contractors’
names, project locations, dates of work, and number of
workers, as well as “financial information” on the costs
of the subcontracting. Subsequently, the Respondent
petitioned the Fourth Circuit for review of the Board’s
Order, and the General Counsel cross-petitioned for en-
forcement of the Order. On January 12, 2005, the Fourth
Circuit granted enforcement in part, denied enforcement
in part, and remanded the case to the Board.2 The Fourth
Circuit enforced the Board’s Order to the extent that it
required the Respondent to provide the requested “non-
financial” information, but refused to enforce the part of
the Board’s Order requiring the Respondent to furnish
the requested “financial” information. The court found
the financial information relevant, but it concluded that
the Board had erred in not expressly determining that the
Union had demonstrated a “specific need” for the cost
data.3 The court remanded the case to the Board for a
determination of whether the Union had shown such a
need.
On July 27, 2005, the Board notified the parties to this
proceeding that it had decided to accept the remand from
the Fourth Circuit, and invited the parties to file state-
ments of position with respect to the issues raised by the
remand. The General Counsel, the Union, and the Re-
spondent each filed a statement of position.
The National Labor Relations Board has delegated its
authority in this proceeding to a three-member panel.
We accept the court’s remand as the law of the case.
Applying the standard set forth by the court, we find, for
the reasons set forth below, that the Union demonstrated
1 339 NLRB 585.
2 West Penn Power Co. v. NLRB, 394 F.3d 233 (4th Cir. 2005).
3 394 F.3d at 245.
that the subcontracting cost data it requested was needed
to enable it to determine, both for contract administration
and negotiation purposes, the volume of subcontracting
engaged in by the Respondent. Accordingly, we con-
clude that the Respondent violated Section 8(a)(5) and
(1) of the Act by refusing to provide the requested cost
data.
Facts
The Respondent is a public utility company that gener-
ates and distributes electricity. The Union represents a
unit of about 1200 employees working at 29 locations in
four States. The parties’ collective-bargaining agreement
permits the Respondent to use “outside contractors” to
perform some bargaining unit work.4 The contract con-
tains a “Contract Work” provision, set forth in section
27.1 of the agreement, which permits subcontracting if
the Respondent maintains a work force of “sufficient size
to take care of the expected regular work of the Com-
pany.” Section 39, the “Resource Sharing” provision,
allows the Respondent to temporarily reassign unit em-
ployees to perform nonemergency work at any company
location in the four-state service area, provided that the
Respondent gives first preference to employees whose
permanent job locations were closest to the work, and
uses contractors only as a last resort. Section 40 states
that the “intent of Resource Sharing is to reduce costs
and reduce the need for contracting out work.” The
agreement also contains a reopener provision, which
provides that, upon notice, the parties would meet to ne-
gotiate any issue that may arise.
A 1977 side agreement obligated the Respondent to
supply the Union with quarterly contractor reports identi-
fying all outside contractors performing ordinary mainte-
nance and repair work, with a description of the work
and its location. Before 1998, the Respondent provided
the specified information, as well as the start and finish
dates of the work and the number of man hours used to
perform the work.
The information dispute before us had its origins in the
Respondent’s 1998 decision to switch to a new contrac-
tor report format. Although the new report form had
spaces for listing the name of the contractor, the type of
work, its location, and the number of workers, the Re-
spondent listed only a broad description of the type of
work and wrote “as needed” in the column calling for the
number of workers. In addition, the new form had no
space for reporting a project’s start and end dates.
4 The contract, negotiated in 1996, was effective from May 1, 1996,
to May 1, 1999. In October 1997, the parties extended the agreement
through April 30, 2001.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
426
As the court found, the Union regarded the new reports
as “deplorably inadequate.”5
The Union made several
unsuccessful oral requests for the missing data. Subse-
quently, between September 1999 and January 2001, the
Union made seven written requests to the Respondent,
stating that the information on subcontracting was in-
complete, inadequate, untimely, or missing altogether.
In a letter dated September 22, 1999 (GC Exh. 28), the
Union complained that the contractor reports continued
to be incomplete, stating that it needed specific informa-
tion in order for the Union to “protect the interests” of its
members. By letter dated November 1, 1999 (GC Exh.
29), the Union again requested a complete set of contrac-
tor reports for the first three quarters of 1999.6 Finally,
on January 17, 2000, the Respondent provided contractor
reports for the third quarter of 1999, showing contract
work at a few locations. (GC Exh. 30.)
However, on March 7, 2000, the Union noted that
there were no third quarter reports for some 17 locations.
The Union asked the Respondent to clarify whether the
failure to supply a contactor report for a particular loca-
tion meant that there was no contract work being per-
formed there. (GC Exh. 31.)
The court found that on March 24 and May 1, 2000,
the Respondent “continued to provide the Union with
contractor information in the same incomplete fashion.”7
(GC Exhs. 32 and 33.) The Respondent did not answer
the Union’s question whether the absence of reports for
specific locations meant that there was no contracting.
By letter of May 24, 2000, the Union linked the con-
tractor information deficiencies to the Union’s ability to
determine whether the Respondent was complying with
the resource sharing provision of the contract and
whether it was abiding by the staffing levels required by
the collective-bargaining agreement. (GC Exh. 68.)
Thus, the Union wrote that it had filed grievances over
“multiple situations where the Company has utilized Re-
source Sharing (“RS”) rights without abiding by the
staffing levels that were promised in return.” The Union
also noted that the “Company promised to reduce outside
contracting at RS locations” and that “[i]mportant infor-
mation about subcontracting has continually been with-
held from [the Union].” The Union further stated that
the “information violations obviously make it harder for
us to investigate the problems or to respond to constant
5 394 F.3d at 238.
6 Meanwhile, the number of unit employees was decreasing: in
Pennsylvania alone, the unit had decreased from 1022 to 896. 394 F.3d
at 243. Given the Company’s continuing use of contractors to perform
unit work, the Union had concerns that the shrinkage was contradicting
the Company’s contractual guarantee to maintain a unit “of sufficient
size to take care of the expected regular work of the Company.”
7 394 F.3d at 239.
questions from members. Failures to reduce subcontract-
ing are additional elements of the Resource Sharing vio-
lation.” (GC Exh. 68.)
By letter dated July 6, 2000, the Union stated that it
continued to “reserve the Union’s contract and informa-
tion rights” and noted that “[s]upplying the Union with
information allows the contractual process to get started.
The Union then has the right to investigate whether jobs
or work tasks are being diverted.” The Union requested
“data on actual outside contractor usage,” stating that
“past failures to compile this information on a monthly
basis may make it much more difficult for all parties to
reconstruct the data after-the-fact, and they will make it
harder for the Union to focus additional requests on the
trends in contractor hours or contractor expenditures.
Gaps in responses also leave questions about the poten-
tial importance of the missing data.” (GC Exh. 34.)
By letter dated July 24, 2000, the Respondent replied,
denying any contract violations with respect to Resource
Sharing and stating that “no reduction in jobs or posi-
tions has occurred as a result of Resource Sharing.” The
Respondent further stated that it had provided “readily
available contractor information on a quarterly basis.”
(GC Exh. 35.) On August 7, 2000, the Respondent pro-
vided certain contractor reports for the second quarter of
2000, but reports on more than 20 locations were not
included. (GC Exh. 36.)
We now turn to the specific information request that is
the subject of the court’s remand. In a letter dated Au-
gust 18, 2000 (GC Exh. 19), the Union complained again
about the “huge gaps” in contractor information for many
“locations and months.” The Union stated that the “as
needed” language routinely inserted in the number of
workers column of the contractor reports was so general
as to be meaningless. For the first time, the Union
sought data processing information on contractor costs
incurred by the Respondent, explaining its request as
follows:
Because the subcontracting data has been so incom-
plete in the forms we requested, and because the com-
plete information will be harder to piece together as
time goes on, we now request as well data processing
information for the time periods beginning 1/1/94 (and
continuing) to show the trends before and after contract
commitments were made. The information would
show the amounts of contracting, both by dollar expen-
ditures and by numbers of work units, including but not
limited to accounts payable data. We request that the
figures be broken out by accounting period (including
WEST PENN POWER CO.
427
months and years, if available), by operational area, by
location, by vendor, and by type of work, to the extent
available. [Emphasis omitted.]
The letter further mentioned the Union’s concern about
“more and more diversions of work to contractors” and
the Union’s need for the information in order for an arbi-
trator to “resolve the disputes” concerning the meaning
of the contract work and resource sharing provisions.
The Respondent continued to send the Union some
quarterly contractor reports, but, as the court stated, the
“problems with gaps, abridged information, and tardiness
remained.”8 In a January 24, 2001 letter (GC Exh. 38),
Union President Sterner reiterated the request for “data-
processing [information] showing the trends and amounts
paid to outside contractors and the work units performed
by them.” The Union explained the importance of the
data processing information, stating that it “would help
the Union investigate, first, whether any particular sub-
contracting episodes were unfair—in light of resource
sharing, or past grievance settlements . . .—and, second,
whether full patterns of contracting have created across-
the-board unfairness. These are issues the Union can
investigate either for potential grievances or for upcom-
ing negotiations. Both are important to us.” The Union
noted that “the size of the bargaining unit has fallen sig-
nificantly” since the contract was signed and that
“[c]omplete information remains relevant to our looking
at how the size of the Company’s regular workforce
compares to the amount of the Company’s regular work,
as well as how subcontracting has varied after the Con-
tract made promises about Resource Sharing.” The Un-
ion went on to discuss why the data processing informa-
tion was necessary. It stated that the information pro-
vided by the Respondent was incomplete, noting that
“[g]aps remain for most locations for most calendar quar-
ters” and that the “combination of documents and e-mails
. . . do not make clear which contractors are doing what
jobs on what particular dates. The e-mail pages contra-
dict and confuse the other pages.” The Union then stated
that “[i]t is impossible to fit together the different pieces
of these responses” and cited a number of examples of
discrepancies in the information provided by the Re-
spondent.
Analysis of the Issue Remanded by the Court
A. The Union Demonstrated that It Needed the Contrac-
tor Cost Data for Contract Administration Purposes
As discussed above, two contract provisions lie at the
heart of the instant dispute: the contract work provision
and the resource sharing provision. The contract work
8 394 F.3d at 240.
provision permitted subcontracting if the Respondent
maintained a work force “of sufficient size to take care of
the expected regular work of the Company.” This provi-
sion protected bargaining unit members from the diver-
sion of bargaining unit work to subcontractors. The re-
source sharing provision granted the Respondent the
right to move unit employees temporarily to where they
were needed most, but the Respondent was required to
follow an order of preference specified in the contract
and contractors were to be used only as a last resort. The
resource sharing provision specifically committed the
Respondent to “reduce the use of contractors.” In order
to police the Respondent’s compliance with these provi-
sions, the Union needed to know how much subcontract-
ing was actually occurring.
Initially, the Union attempted to ascertain the extent of
subcontracting by requesting that the Respondent provide
the nonfinancial information missing from the quarterly
reports, such as contractors’ names, project locations,
description and dates of work, and number of workers
involved. However, as detailed above, the Respondent
repeatedly failed to provide the Union with nonfinancial
subcontracting information sufficient to meet the Union’s
legitimate needs. Consequently, the court agreed with
the Board that the Respondent violated Section 8(a)(5)
by refusing to provide the Union with the requested non-
financial information pertaining to subcontracting. The
court summarized the Respondent’s failure to satisfy the
Union’s information requests as follows:
•
First, the contractor report forms did not ade-
quately describe the type of work performed
or indicate the start and end dates for contract
jobs. Although the form had a column for
providing the number of workers used on a
particular job, the Company usually inserted
“as needed” rather than a number. And the
Company did not respond to the Union’s ob-
jection that this practice was not informative.
. . .
•
Second, some of the contractor information
was provided as much as two years late.
•
Third, for a majority of locations (over
twenty) no information was provided at all for
many calendar quarters, and the Union was
never told whether the failure to provide in-
formation for a particular location meant that
no contractors were being used.
394 F.3d at 240. As a result, the Union was unable to de-
termine the extent of subcontracting and accordingly could
not adequately police the contract.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
428
We find that the Union articulated specific reasons for
needing the financial information at the time the informa-
tion was requested in its letter dated August 18, 2000,
and it reiterated and amplified those reasons in its Janu-
ary 24, 2001 letter. For example, in its August 18, 2000
letter, the Union stated that it needed the data processing
information “[b]ecause the subcontracting data has been
so incomplete in the forms we requested, and because the
complete information will be harder to piece together as
time goes on.” Hence, the Union emphasized that it was
requesting the information “to show the trends before
and after contract commitments were made.” The Union
reiterated its need for the data processing information in
its January 24, 2001 letter, stating that it “would help the
Union investigate, first, whether any particular subcon-
tracting episodes were unfair . . . and, second, whether
full patterns of contracting have created across-the-board
unfairness.” The Union observed that “[g]aps remain for
most locations for most calendar quarters,” that the
“combination of documents and e-mails . . . do not make
clear which contractors are doing what jobs on what par-
ticular dates,” and that “[i]t is impossible to fit together
the different pieces of these responses.” We find that in
those letters the Union demonstrated a “specific need”
for the cost data.
We find the Respondent’s unlawful conduct of provid-
ing untimely, incomplete, and inadequate information put
the Union in the position of needing the subcontracting
cost data in order to assess the volume of contracting that
was occurring. Because of the Respondent’s ongoing
refusal to provide timely, complete, and accurate non-
financial information, the Union had to resort to financial
information in order to determine whether the Respon-
dent was meeting its contractual commitments. As the
Union succinctly explains in its brief, having “hit a vir-
tual brick wall” in its efforts to obtain non-financial in-
formation showing the volume of subcontracting, the
Union needed the subcontracting cost data as a “useful
proxy.”
The Respondent asserts that the Union has not estab-
lished a need for the cost information because the Re-
spondent is not claiming that its decision to subcontract
was related to costs. Southwestern Bell Telephone Co.,
173 NLRB 172 (1968), relied on by the Respondent, is
distinguishable. In that case the union requested infor-
mation concerning the cost of subcontracting and what
the cost would have been had the work been performed
by the respondent’s own employees. The employer
maintained that the information was irrelevant, stating
that the work had been subcontracted because the em-
ployer’s own employees were too busy to perform it and
not on the basis of cost. Under such circumstances the
Board agreed that the financial information was not rele-
vant, finding that the union had failed to explain how
cost was relevant where none of the contract provisions
relied on by the union in support of its grievances re-
ferred to cost, and cost was not asserted as a reason for
subcontracting. Similarly, in Southwestern Bell Tele-
phone Co., 262 NLRB 928, 933 (1982), the Board
adopted the judge’s finding that the “probable relevance”
of the requested financial information about subcontract-
ing was not demonstrated because the respondent never
asserted an economic defense for its actions and it was
“clear” that the subcontracting occurred for noneconomic
reasons.
In contrast, in the instant case, the court has already
found that the cost information is relevant because it
“could show the extent of the Company’s use of outside
contractors.” 394 F.3d at 244. Thus, relevance of the
requested financial information is not at issue here.
Rather, the issue here is whether the Union has demon-
strated a specific need for the information. In light of the
Union’s repeated assertions of its inability to derive the
“extent of the Company’s use of outside contractors”
from the untimely, incomplete, and inadequate non-
financial information provided by the Respondent, the
Union has demonstrated a specific need for the financial
information. See Quarto Mining Co., 282 NLRB 696,
700 (1987), in which the Board adopted the judge’s deci-
sion requiring production of subcontracting cost data in
order to give “guidance to the Union as to the magnitude
of the work done by the subcontractors.”
B. The Union Demonstrated That It Needed the Contrac-
tor Cost Data for Contract Negotiation Purposes
By its terms, the parties’ collective-bargaining agree-
ment was scheduled to expire on April 30, 2001. In or-
der to determine whether to attempt to renegotiate issues
relating to subcontracting, the Union needed to ascertain
the extent and pattern of subcontracting that was occur-
ring. As set forth above, because the nonfinancial infor-
mation provided by the Respondent concerning the
amount of subcontracting was untimely, incomplete, and
inadequate, the Union needed the cost data to get a clear
picture of the volume of subcontracting. Unlike in Gen-
eral Electric v. NLRB, 916 F.2d 1163 (7th Cir. 1990),
relied on by the Respondent, the Union’s request for fi-
nancial information for purposes of preparation for nego-
tiations was not premature. At the time of the Union’s
August 2000 request for financial information, the con-
tract expiration was 8 months away and at the time of the
January 2001 renewal of its request, the contract was due
to expire in less than 4 months. By contrast, in General
Electric, the contract was not due to expire for 16 months
and the earliest date negotiations could commence was
WEST PENN POWER CO.
429
13 months after the union’s request. Furthermore, the
contract in the instant case contained a reopener that the
Union might have been able to invoke to renegotiate the
provisions dealing with subcontracting if the information
it requested showed a necessity to do so. In General
Electric there was no evidence of a reopener. We find,
therefore, that the Union has shown that it needed the
requested information for negotiation purposes.
C. Conclusion
In sum, applying the standard set forth by the court, we
find, for the reasons set forth above, that the Union dem-
onstrated that the subcontracting cost data it requested
was needed to enable it to determine, both for contract
administration and negotiation purposes, the volume of
subcontracting engaged in by the Respondent. Accord-
ingly, we find that the Respondent violated Section
8(a)(5) and (1) of the Act by refusing to provide the re-
quested subcontracting cost data.9
REMEDY
Having found that the Respondent violated Section
8(a)(5) and (1) by refusing to provide the Union with the
subcontracting cost information it first requested by letter
dated August 18, 2000, we shall order the Respondent to
furnish the Union with the requested information.10
The Respondent argues that the Union is not entitled to
any cost information because the nonfinancial informa-
tion that the Board, with court approval, has already or-
dered the Respondent to produce “is more than sufficient
to show the trends in contractor usage over the broad
period of time for which it was requested.” We disagree.
“The right of the Union to the information requested
must be determined by the situation which existed at the
time the request was made, not at the time the Board or
the courts get around to vindicating that right.” Mary
Thompson Hospital, 296 NLRB 1245, 1250 (1989), enfd.
943 F.2d 741 (7th Cir. 1991). See also Borgess Medical
Center, 342 NLRB 1105, 1107 (2004) (acknowledging
that “the issue of whether there is a violation is to be de-
termined by the facts as they existed at the time of the
union’s request”). Although the remedy for an informa-
tion violation “must take into account the facts as they
exist at the time of the Board’s order,” the Respondent
has the burden of showing that the “stated need for the
information is no longer present.” Borgess, 342 NLRB
at 1107.
9 In so finding, we are not holding that a union will always be enti-
tled to receive requested subcontracting cost data from an employer.
Rather, we are finding only that the Union is entitled to this information
under the specific facts of this case.
10 Inasmuch as the court has already enforced the cease-and-desist
provisions of our previous Order, we shall not repeat them here.
Here, the Respondent has not met its burden of show-
ing that the information is no longer needed. As the
court recognized, in its August 18, 2000 letter, the Union
expressed its “legitimate concern” that “[b]ecause of the
passage of time,” the complete “information would be
hard to piece together in the field. This led the Union to
conclude that central data processing information show-
ing longer-term trends in contracting might be the only
means to evaluate the Company’s 1996 commitment to
reduce its reliance on outside contractors.” 394 F.3d at
248. The Respondent has not shown that providing the
nonfinancial information at this late date, many years
after it was requested, will enable the Union to “piece
[the subcontracting picture] together” and evaluate the
Respondent’s compliance with its contractual obliga-
tions. So far as the record shows, the Union still needs to
know how much the subcontracting cost the Respondent
in order to reconstruct the amount of subcontracting that
had taken place over the relevant period. Accordingly,
we shall order the Respondent to provide the Union with
the requested subcontracting cost data.11
ORDER
The National Labor Relations Board orders that the
Respondent, West Penn Power Company and the Poto-
mac Edison Company d/b/a Allegheny Power and Alle-
gheny Energy Supply Company, LLC, a single employer,
and their agent Allegheny Energy Service Corporation,
Greensburg, Pennsylvania, its officers, agents, succes-
sors, and assigns, shall
Take the following affirmative action necessary to ef-
fectuate the policies of the Act.
(a) Provide the Union with the subcontracting cost data
information it requested on August 18, 2000 (reiterated
on January 24, 2001).
11 Cf. SBC Midwest, 346 NLRB62, 65–66 (2005), in which the
Board found that the employer violated Sec. 8(a)(5) by failing to pro-
vide the union with information concerning the amount of unit work
being subcontracted, but was not obligated to provide pricing informa-
tion. The Board recognized that if the union had the pricing informa-
tion, it might be able to calculate how much work was being subcon-
tracted. However, because the Board’s remedial order would have
required the employer to provide the union with specific information
concerning the amount of work being subcontracted, the Board con-
cluded that “the Union will not need to calculate for itself the amount
of such work.” In SBC, the Board found in essence that the union
would be able to ascertain the amount of subcontracting from the non-
financial information the employer was being ordered to provide. Here,
the Respondent has not shown that the Union will be able to reconstruct
the volume of subcontracting over an extended period of time from the
nonfinancial information that it originally requested. As set forth
above, that nonfinancial information is no longer adequate to enable the
Union to quantify the amount of subcontracting that occurred long
before.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
430
(b) Within 14 days after service by the Region, post at
its facilities in Pennsylvania, West Virginia, Maryland,
and Virginia copies of the attached notice marked “Ap-
pendix.”12 Copies of the notice, on forms provided by the
Regional Director for Region 6, after being signed by the
Respondent’s authorized representative, shall be posted
by the Respondent and maintained for 60 consecutive
days in conspicuous places including all places where
notices to employees are customarily posted. Reasonable
steps shall be taken by the Respondent to ensure that the
notices are not altered, defaced, or covered by any other
material. In the event that, during the pendency of these
proceedings, the Respondent has gone out of business or
closed the facility involved in these proceedings, the Re-
spondent shall duplicate and mail, at its own expense, a
copy of the notice to all current employees and former
employees employed by the Respondent at any time
since August 18, 2000.
(c) Within 21 days after service by the Region, file
with the Regional Director a sworn certification of a re-
sponsible official on a form provided by the Region at-
testing to the steps that the Respondent has taken to
comply.
12 If this Order is enforced by a judgment of a United States court of
appeals, the words in the notice reading “Posted by Order of the Na-
tional Labor Relations Board” shall read “Posted Pursuant to a Judg-
ment of the United States Court of Appeals Enforcing an Order of the
National Labor Relations Board.”
APPENDIX
NOTICE TO EMPLOYEES
POSTED BY ORDER OF THE
NATIONAL LABOR RELATIONS BOARD
An Agency of the United States Government
The National Labor Relations Board has found that we vio-
lated Federal labor law and has ordered us to post and obey
this notice.
FEDERAL LAW GIVES YOU THE RIGHT TO
Form, join, or assist a union
Choose representatives to bargain with us on
your behalf
Act together with other employees for your bene-
fit and protection
Choose not to engage in any of these protected
activities.
WE WILL provide the Union with the subcontracting
cost data information it requested on August 18, 2000
(reiterated on January 24, 2001).
WEST PENN POWER COMPANY AND THE
POTOMAC EDISON COMPANY D/B/A ALLEGHENY
POWER AND ALLEGHENY ENERGY SUPPLY
COMPANY, LLC, A SINGLE EMPLOYER AND
THEIR AGENT ALLEGHENY ENERGY SERVICE
CORPORATION