329 NLRB 529
Charles E. Jarrell Contracting Co.
PLUMBERS LOCAL 562 (CHARLES E. JARRELL CONTRACTING)
529
United Association of Journeymen and Apprentices of
the Plumbing and Pipefitting Industry of the
United States and Canada, Local Union No. 562,
AFL–CIO and Charles E. Jarrell Contracting
Company, Inc. and Sheet Metal Workers’ In-
ternational Association, Local Union No. 36,
AFL–CIO, Party in Interest. Case 14–CD–938
September 30, 1999
DECISION AND DETERMINATION OF DISPUTES
BY CHAIRMAN TRUESDALE AND MEMBERS HURTGEN
AND BRAME
The charge in this Section 10(k) proceeding was filed
on September 18, 1996,1 and amended on September 20,
by Charles E. Jarrell Contracting Company, Inc. (Em-
ployer), alleging that the Respondent, Pipefitters Local
Union No. 562 (Pipefitters), violated Section 8(b)(4)(D)
of the National Labor Relations Act by engaging in pro-
scribed activity with an object of forcing the Employer to
assign certain work to employees it represents rather than
to employees represented by Sheet Metal Workers, Local
Union No. 36 (Sheet Metal Workers). The hearing was
held on October 4 before Hearing Officer Donald F. Jue-
neman.2
The National Labor Relations Board has delegated its
authority in this proceeding to a three-member panel.
The Board affirms the hearing officer’s rulings, find-
ing them free from prejudicial error. On the entire re-
cord, the Board makes the following findings.
I. JURISDICTION
The Employer, a Missouri corporation with its princi-
pal office in Earth City, Missouri, is engaged in the me-
chanical design and installation of heating and air condi-
tioning systems, and annually purchases and receives at
its St. Louis, Missouri jobsites, directly from points lo-
cated outside the State of Missouri, goods valued in ex-
cess of $50,000. The parties stipulate, and we find, that
the Employer is engaged in commerce within the mean-
ing of Section 2(6) and (7) of the Act and that Pipefitters
and Sheet Metal Workers are labor organizations within
the meaning of Section 2(5) of the Act.
II. THE DISPUTES
A. Background and Facts of the Disputes
The Employer employs employees represented by Pipe-
fitters and Sheet Metal Workers, and has contractual rela-
tionships with each of the competing labor organizations
through its membership in and assignment of its bargain-
ing rights to separate multiemployer associations. The
collective-bargaining agreement between the Mechanical
Contractors Association of St. Louis, Missouri, Inc.
(MCA) and Pipefitters is effective from January 1, 1996,
through May 31, 2000. At the time of the hearing in this
proceeding, the Sheet Metal and Air Conditioning Con-
tractors
National
Association,
St.
Louis
Chapter
(SMACNA) and Sheet Metal Workers had agreed to con-
tract terms for a new collective-bargaining agreement ef-
fective May 1, 1996, through August 31, 2001, as a suc-
cessor to the contract that expired April 30, 1996. The
new contract was being prepared for printing and final
signatures, but, on instructions from SMACNA, the Em-
ployer had already implemented the wage provisions.
1 All dates are 1996, unless stated otherwise.
2 On October 18, 1996, the Board issued an order consolidating this
case for briefing with Cases 14–CD–935, 14–CD–936, and 14–CD–
937.
1. Home Depot Project
The Employer is a mechanical and heating and air
conditioning subcontractor to S.M. Wilson at a project in
Brentwood, Missouri, for the construction of a Home
Depot store. The subcontract required, in part, the instal-
lation of six Co-Ray-Vac3 type infrared heating systems
used to radiate and reflect heat to the ground near large
door openings.
In August, the Employer began installation of the Co-
Ray-Vac type systems, assigning the entire work to the
Pipefitters. On September 6, the Sheet Metal Workers
filed a grievance with the Local Joint Adjustment Board
for the Sheet Metal Industry (LJAB), contending that its
contract had been violated by the assignment of the Co-
Ray-Vac work to employees represented by Pipefitters.4
Only one of the Co-Ray-Vac units remained to be installed
at the time the Employer received the grievance. The Em-
ployer’s treasurer, Prentiss Thomas Owens, testified that
during a telephone conversation on September 16, Sheet
Metal Workers’ business representative, John Lorson,
claimed 50 percent of the hangers installation (used to
hang the unit from the ceiling) and all of the reflecting
shield installation. Lorson denied ever discussing the Co-
Ray-Vac work at the Home Depot jobsite during a tele-
phone conversation with Owens. While the Board does
not make credibility findings in a Section 10(k) proceed-
ing, “[a] conflict in testimony does not prevent the Board
from proceeding with a determination of the dispute under
Section 10(k).”5 In this regard, “[t]he Board is not charged
with finding that a [Section 8(b)(4)(D) violation] did in
fact occur, but only that reasonable cause exists for finding
such a violation.”6 In any event, we note that the record
reflects that the Sheet Metal Workers filed a grievance
with the LJAB relating to the Co-Ray-Vac work at the
Home Depot jobsite, as noted above. The Employer made
no change in its assignment of the Co-Ray-Vac work to
the Pipefitters.
3 Co-Ray-Vac is a trade name that has become synonymous with a
specific type of heating system regardless of the manufacturer of the
system. In the instant case, Re-Verber-Ray brand units were to be
installed.
4 The grievance was pending at the time of the hearing.
5 Laborers Local 334 (C.H. Heist Corp.), 175 NLRB 608, 609
(1969).
6 Id.
329 NLRB No. 54
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
530
On September 17, the Employer received, by fax (and
subsequently by mail), a letter from Pipefitters’ business
manager, Jim O’Mara, advising the Employer that any
reassignment of the Co-Ray-Vac work would constitute a
contract repudiation and would be met with a strike. On
or about September 17, Pipefitters’ business manager,
Jim O’Mara, reportedly informed the Employer’s owner
that any reassignment of the disputed work would be met
with a possible strike or picketing.
2. Bunzl-USA project
The Employer contracted to install a small, ceiling
mounted, self-contained, factory assembled, nonducted
air conditioning unit for Bunzl-USA at its St. Louis
County, Missouri facility. Although the Employer has
performed previous work for Bunzl, the contract at issue
is for only one unit. The Ceilair brand unit (often re-
ferred to as a “Liebert” type of unit), is nonducted. Air
drawn into the unit is expelled directly from the unit
through baffles into the room below. The Employer an-
ticipated that the work would start during the week after
the hearing.
During a telephone conversation occurring on or about
September 18, the Employer’s treasurer, Owens, told
Sheet Metal Workers’ business representative, Lorson,
about the scheduled work at the Bunzl site and informed
him that the Employer had assigned the work to its Pipe-
fitter employees. During this telephone conversation,
Lorson claimed one-half of the installation as part of a
50/50 composite crew. On September 26, Sheet Metal
Workers filed a grievance with the LJAB, asserting that
its contract had been violated by the assignment of the
work to employees represented by Pipefitters. The Em-
ployer continued to assign the work to employees repre-
sented by Pipefitters.
On September 17, the Employer received, by fax (and
subsequently by mail), a letter from Pipefitter’s business
manager, Jim O’Mara, advising the Employer that any
reassignment of the work to employees represented by
Sheet Metal Workers would constitute a contract repu-
diation and would be met with a strike. On or about Sep-
tember 17, Pipefitters’ business manager, Jim O’Mara,
reportedly informed the Employer’s owner that any reas-
signment of the disputed work would be met with a pos-
sible strike or picketing.
3. Fern Ridge office project
At the Fern Ridge office project in Creve Coeur, Mis-
souri, the Employer was awarded a contract for, inter
alia, the installation of a small, floor mounted, self-
contained, factory assembled, nonducted cooling unit in
a computer room. The unit consists of a refrigerant
compressor with coils, fan, and filter, and a box which is
placed on the raised floor to discharge cool air directly
into the area below the floor in order to pressurize that
area and cool the computer room. The work was in pro-
gress at the time of the hearing and was expected to be
completed shortly thereafter.
On or about September 18, Sheet Metal Workers’
business representative, Lorson, informed the Em-
ployer’s treasurer, Owens, that Sheet Metal Workers
claimed one-half of the installation as part of a 50/50
composite crew. On September 26, Sheet Metal Workers
filed a grievance with the LJAB asserting that its contract
had been violated by the assignment of the work to em-
ployees represented by Pipefitters. The Employer con-
tinued to assign the work to employees represented by
Pipefitters.
On September 17, the Employer received by fax (and
subsequently by mail), a letter from Pipefitters’ business
manager, Jim O’Mara, advising the Employer that any
reassignment of the work to employees represented by
Sheet Metal Workers would constitute a contract repu-
diation and would be met with a strike. On or about Sep-
tember 17, Pipefitters’ business manager, Jim O’Mara,
reportedly informed the Employer’s owner that any reas-
signment of the disputed work would be met with a pos-
sible strike or picketing.
B. Work in Dispute
The work in dispute involves the installation of reflec-
tor shields and hangers of a Co-Ray-Vac type heating
system at the Home Depot store in Brentwood, Mis-
souri;7 the installation of a small, ceiling mounted, self-
contained, factory assembled, nonducted air-conditioning
unit at the Bunzl-USA project in St. Louis County, Mis-
souri; and the installation of a small, floor mounted, self-
contained, factory assembled, nonducted air conditioning
unit at the Fern Ridge office project in Creve Coeur,
Missouri.
C. Contentions of the Parties
The Employer contends that there is reasonable cause
to believe that Pipefitters violated Section 8(b)(4)(D) of
the Act and therefore the Board must make a determina-
tion of the merits of the disputes. The Employer con-
tends that the disputed work should be awarded to em-
ployees represented by Pipefitters based on the factors of
employer preference and past practice, area and industry
practice, relative skills, and economy and efficency of
operations. The Employer also refers to Pipefitters’ ar-
gument that Pipefitters’ collective-bargaining agreement
includes all of the disputed work. Relying on the fact
that a similar dispute was at issue in Pipefitters Local
562 (Systemaire), 320 NLRB 124 (1995), the Employer
7 At the hearing, the parties stipulated that the work assignment at
the Home Depot jobsite concerns a Co-Ray-Vac type heating system
rather than a backing system as described in the notice of hearing.
Further, although the notice of hearing referred to the assignment of
installing exhaust pipes to the Co-Ray-Vac type system at the Home
Depot jobsite, the exhaust flue installations were assigned, without
dispute, to the Sheet Metal Worker-represented employees. Thus, the
disputed work at the Home Depot jobsite includes only the installation
of reflector shields and hangers of a Co-Ray-Vac type heating system.
PLUMBERS LOCAL 562 (CHARLES E. JARRELL CONTRACTING)
531
additionally contends that the Board should issue a broad
order with respect to the Co-Ray-Vac type heating sys-
tem.
Pipefitters contends that the work in dispute was prop-
erly assigned to employees represented by Pipefitters
and, relying on Systemaire, supra, contends that the
Board should issue a broad order with respect to the Co-
Ray-Vac type heating system.
Sheet Metal Workers contends that the notice of hear-
ing should be quashed, alleging that Pipefitters’ threats
are a sham to invoke the Board’s authority and obtain a
determination favoring the current assignment of the
disputed work to employees represented by Pipefitters.
Sheet Metal Workers further contends that the Em-
ployer’s failure to request Section 10(l) relief against
possible threats by Pipefitters indicates that the threats
were hollow and were not intended to be implemented.
Sheet Metal Workers thus asserts that there is therefore
no reasonable cause to believe that Section 8(b)(4)(D)
has been violated.
Sheet Metal Workers alternatively contends that, if the
Board finds the statute applicable and determines the
disputes, the work should be awarded to employees it
represents based on the factors of collective-bargaining
agreement language, a 1956 jurisdictional agreement
between the two Unions, and a 1995 Sheet Metal Indus-
try National Joint Adjustment Board (NJAB) decision
involving another employer. Sheet Metal Workers addi-
tionally contends that the Board should issue a broad
award with respect to all of the disputed work to employ-
ees represented by Sheet Metal Workers.8
D. Applicability of the Statute
Before the Board may proceed with a determination of
the disputes pursuant to Section 10(k) of the Act, it must
be satisfied that there is reasonable cause to believe that
Section 8(b)(4)(D) of the Act has been violated and that
the parties have not agreed on a method for voluntary
adjustment of the dispute. “This reasonable cause stan-
dard is substantially lower than that required to establish
that the statute has in fact been violated. In addition, the
Board’s Section 10(k) procedure, unlike the unfair labor
practice procedure, does not call for assessments of the
credibility of witnesses.” Plumbers Local 562 (C & R
Heating & Service Co.), 328 NLRB No. 176, slip op. at 1
(1999).
8 Sheet Metal Workers filed a motion for oral argument. This mo-
tion for oral argument is denied, as the record and briefs adequately
present the issues and positions of the parties.
Sheet Metal Workers also moved the Board to reopen the record in
this case for inclusion of the Regional Director’s letter of October 4
denying Sheet Metal Workers’ request that Region 14 institute Sec.
10(l) injunction proceedings against Pipefitters; in the alternative, Sheet
Metal Workers moved the Board to take official notice of the Regional
Director’s letter. We deny Sheet Metal Workers’ motion to reopen the
record, but take official notice of the Regional Director’s letter of Oc-
tober 4. We find that it does not effect the outcome of this Decision
and Determination of Disputes.
Pipefitters threatened in writing that if the work at the
Home Depot, Bunzl-USA, or Fern Ridge office jobsites
were reassigned, “[a]ny such reassignment would be
considered a violation of the collective bargaining
agreement going to the very heart of the agreement and,
thus, would constitute a repudiation. Any repudiation of
the collective bargaining agreement would be met with a
strike.” Additionally, Owens testified that the Em-
ployer’s owner, Mike Jarrell, told him that Pipefitters’
business manager, O’Mara, informed Jarrell that, if the
work at the Home Depot, Bunzl-USA, or Fern Ridge
office jobsites were reassigned, the Pipefitters would
possibly strike or picket.
Sheet Metal Workers contends Pipefitters’ threats were
shams. As detailed above, however, the statements made
by a representative of Pipefitters clearly constitute threats
of economic action, and the Employer’s vice president
testified that the Employer took the threats seriously.
Apart from its assertions, Sheet Metal Workers has
brought forth no evidence establishing that Pipefitters’
threats were not genuine or were made in collusion with
the Employer. See Plumbers Local 562 (C & R Heating
& Service Co.), supra, slip op. at 1–2, and cases cited
therein.
In light of the above, we find reasonable cause to be-
lieve that a violation of Section 8(b)(4)(D) has occurred
and that, as stipulated by the parties, there exists no
agreed upon method for voluntary adjustment of the dis-
pute within the meaning of Section 10(k) of the Act.
Accordingly, we find that the dispute is properly before
the Board for determination.
E. Merits of the Disputes
Section 10(k) requires the Board to make an affirma-
tive award of disputed work after considering various
factors. NLRB v. Electrical Workers IBEW Local 1212
(Columbia Broadcasting), 364 U.S 573 (1961). The
Board has held that its determination in a jurisdictional
dispute is an act of judgment based on common sense
and experience, reached by balancing the factors in-
volved in a particular case. Machinists Lodge 1743 (J.A.
Jones Construction), 135 NLRB 1402 (1962).
The following factors are relevant in making the de-
termination of this dispute.
1. Certifications and collective-bargaining agreements
Neither Pipefitters nor Sheet Metal Workers has been
certified by the Board as the collective-bargaining repre-
sentative of the employees performing the disputed work.
Accordingly, this factor is not helpful in determining
these jurisdictional disputes.
As noted above, the Employer is signatory to a mul-
tiemployer collective-bargaining agreement with Pipefit-
ters, which is effective from January 1, 1996, through
May 31, 2000. As further noted above, at the time of the
hearing in this proceeding, SMACNA and Sheet Metal
Workers had agreed to contract terms for a new collec-
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
532
tive-bargaining agreement effective May 1, 1996,
through August 31, 2001. The new contract was being
prepared for printing and final signatures, but the wage
provisions had already been implemented.
Pipefitters’ agreement states that its terms apply to
work by the signatory employers within the jurisdiction
of Pipefitters, which is described in the contract to in-
clude, inter alia,
All piping, setting and hanging of all units and fixtures
for air-conditioning, cooling, heating, roof cooling, re-
frigerating, ice making, humidifying, dehumidifying,
dehydrating, by any method, and the charging and test-
ing, servicing of all work after completion.
Article 5, section 4 of Pipefitters’ agreement reserves
to Pipefitters all “work . . . relating to new installation,
reconditioning, or remodeling of heating, air condition-
ing . . . and like systems, includ[ing] all phases of the
work.” Article 5, section 7, reserves to Pipefitters “the
fabrication and erection of all pipe-work for all mechani-
cal, residential, commercial, manufacturing, and mining
purposes.”
The expired agreement with Sheet Metal Workers
states that its terms apply to employees engaged in, inter
alia,
the manufacture, fabrication, assembling, handling,
erection, installation, dismantling, conditioning, ad-
justment, alteration, repairing and servicing of all fer-
rous or nonferrous metal work and all other materials
used in lieu thereof and all air-veyor systems and air-
handling systems regardless of material used including
the setting of all equipment and reinforcements in con-
nection therewith.
Among the types of sheet metal work specified as within
Sheet Metal Workers’ jurisdiction is the following:
Any and all types of sheet metal work specified for use
in connection with or incidental to direct, indirect or
other types of heating, ventilating, air conditioning and
cooling systems.
Sheet Metal Workers’ agreed-upon successor agree-
ment includes an addendum referring to the installation
of “all other types of heating systems including “Co-Ray-
Vac” and like radiation systems.” The successor agree-
ment also includes an addendum referring to “air condi-
tioning units, including raised floor computer room units
regardless if duct connected or not.”
In view of the above-quoted provisions of its collec-
tive-bargaining agreement with the Employer, we find
that Pipefitters’ current collective-bargaining agreement
arguably covers the disputed work at the three sites. In
view of the above-quoted provisions of its expired
collective-bargaining agreement with the Employer and
the addenda contained in its agreed-upon successor
agreement, we find that Sheet Metal Workers’ agreement
arguably covers the work in dispute at the three sites.
guably covers the work in dispute at the three sites. Be-
cause both the Pipefitters’ and the Sheet Metal Workers’
collective-bargaining agreements reasonably can be read
as covering the disputed work at the Home Depot jobsite,
the Bunzl-USA jobsite, and the Fern Ridge Office pro-
ject jobsite, we find that the factor of collective-
bargaining agreements favors neither group of employ-
ees.9
2. Employer preference and past practice
a. Home Depot project
A witness for the Employer stated that the Employer’s
preference is to have the disputed work relating to the
Co-Ray-Vac type heating system awarded to employees
represented by Pipefitters.
The record reflects that where the connecting natural
gas pipes to fuel the burners are installed by employees
represented by Pipefitters, the Employer’s past practice
has been to use employees represented by Pipefitters to
connect the reflecting shields and hang the units. Ac-
cordingly, employer preference and past practice favor
an award of the disputed work to employees represented
by Pipefitters.
b. Bunzl-USA project
A witness for the Employer stated that the Employer’s
preference is to have the disputed work awarded to em-
ployees represented by Pipefitters.
The record reflects that the Employer has installed
similar air conditioning units in the past and where there
is no duct work attached to the unit, as is the case at the
Bunzl-USA project, the Employer’s past practice has
been to assign that work to employees represented by
Pipefitters. Accordingly, employer preference and past
practice favor an award of the disputed work to employ-
ees represented by Pipefitters.
c. Fern Ridge Office project
A witness for the Employer stated that the Employer’s
preference is to have the disputed work awarded to em-
ployees represented by Pipefitters.
The record reflects that the Employer’s past practice
has been to assign the installation of nonducted cooling
units to employees represented by Pipefitters. Accord-
ingly, employer preference and past practice favor an
award of the disputed work to employees represented by
Pipefitters.
9 In finding that the factor of collective-bargaining agreements does
not favor an award of the disputed work to employees represented by
either the Pipefitters or Sheet Metal Workers, Member Brame considers
only the Pipefitters’ current collective-bargaining agreement and the
Sheet Metal Workers’ agreed-upon successor agreement. See Laborers
Local 210 (Concrete Cutting & Breaking), 328 NLRB No. 182, slip.
op. at 2 (1999).
PLUMBERS LOCAL 562 (CHARLES E. JARRELL CONTRACTING)
533
3. Area and industry practice
a. Home Depot project
The Employer presented evidence, through witness
testimony, that both area and industry practice is to as-
sign the installation of a Co-Ray-Vac type system, in-
cluding the work in dispute, to employees represented by
Pipefitters. Accordingly, we find that the factor of area
and industry practice favors an award of the disputed
work to employees represented by Pipefitters.
b. Bunzl-USA project
The Employer presented evidence, through witness
testimony, that both area and industry practice is to as-
sign the installation of nonducted air conditioning units
to employees represented by Pipefitters. Accordingly,
we find that the factor of area and industry practice fa-
vors an award of the disputed work to employees repre-
sented by Pipefitters.
c. Fern Ridge Office project
The Employer presented evidence, through witness
testimony, that both the area and industry practice is to
assign the installation of nonducted cooling units to em-
ployees represented by Pipefitters. Accordingly, we find
that the factor of area and industry practice favors an
award of the disputed work to employees represented by
Pipefitters.
4. Relative skills
With respect to each jobsite, the record shows that
both employees represented by Pipefitters and employees
represented by Sheet Metal Workers possess the neces-
sary skills to perform the work in dispute. Accordingly,
this factor does not favor an award of the work to either
group of employees.
5. Economy and efficiency of operations
a. Home Depot project
The Employer presented evidence that it is more eco-
nomical and efficient to assign the disputed work to em-
ployees represented by Pipefitters. A witness for the
Employer testified that, when employees represented by
Pipefitters install and connect the natural gas pipes with
seals, they may also position the units to benefit the pipe
location, thereby improving economy and efficiency.
Accordingly, we find that the factor of economy and
efficiency of operations favors an award of the disputed
work to the employees represented by Pipefitters.
b. Bunzl-USA project
The Employer presented evidence that it is more eco-
nomical and efficient to assign the disputed work to em-
ployees represented by Pipefitters. A witness for the
Employer testified that it is more efficient to use em-
ployees represented by Pipefitters because condensate
lines attached to the unit are installed by employees rep-
resented by Pipefitters; employees represented by Pipe-
fitters check the operation of the unit at start up; and,
therefore, only one crew would be required.
Accordingly, we find that the factor of economy and
efficiency of operations favors an award of the disputed
work to employees represented by Pipefitters.
c. Fern Ridge office project
The Employer presented evidence, through witness tes-
timony, that it is more economical and efficient to assign
the disputed work to the employees represented by Pipefit-
ters because employees represented by Pipefitters install
condensate lines attached to the unit; employees repre-
sented by Pipefitters check the operation of the unit at start
up; and, therefore, only one crew would be required.
Accordingly, we find that that the factors of economy
and efficiency of operations favors an award of the dis-
puted work to the employees represented by Pipefitters.
6. Interunion agreements
The record includes a 1956 agreement between the
United Association of Journeymen and Apprentices of
the Plumbing and Pipefitting Industry and the Sheet
Metal Workers’ International Association. The record
also includes an April 5, 1966 addendum to the 1956
interunion agreement.
Article 1, Section 2 of the 1956 interunion agreement
states:
The installation of completed and/or knock down pack-
age type heating and cooling units consisting of fans,
filters, refrigeration condensing units, and dampers,
with heating coils and/or cooling coils assembled
therein, whether or not in connection with a duct sys-
tem, shall be unloaded and installed by a composite
crew consisting of an equal number of [employees rep-
resented by Sheet Metal Workers and employees repre-
sented by Pipefitters], with the understanding that the
[employees represented by Sheet Metal Workers] shall
install any duct work in connection with the unit and
[employees represented by Pipefitters] shall install all
piping in connection with the units.
There is no conclusive evidence as to whether the 1956
interunion agreement covers the disputed work at the Home
Depot jobsite, the Bunzl-USA jobsite, or the Fern Ridge
office project jobsite. In addition, the record does not show
that the Employer has agreed to be bound by the agreement
between the Unions, or that the area and industry practice in
fact conforms to the terms of the agreement. Accordingly,
the 1956 interunion agreement between Sheet Metal Work-
ers and Pipefitters does not favor an award of the disputed
work at any of the jobsites to either group of employees.10
10 The 1995 National Joint Adjustment Board (NJAB) decision also
referred to by Sheet Metal Workers involved a different employer and a
different dispute from the disputes in the instant case. Further, there is
no evidence that Pipefitters agreed to be bound by that NJAB decision.
Accordingly, the 1995 NJAB award in an unrelated dispute involving a
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
534
Conclusions
After considering all of the relevant factors, we con-
clude that employees represented by Pipefitters are enti-
tled to perform the work in dispute. We reach this con-
clusion relying on the factors of employer preference and
past practice, area and industry practice, and economy
and efficiency of operations.
In making this determination, we are awarding the
work to employees represented by Pipefitters, not to that
Union or its members.
Scope of the Award
The Employer contends that, based on the actions of
Sheet Metal Workers and the Board’s decision in Pipefit-
ters Local 562 (Systemaire), supra, a broad order with
respect to the installation of Co-Ray-Vac type units is
necessary to avoid similar jurisdictional disputes in the
future. Pipefitters contends that, based on the actions of
Sheet Metal Workers and the Board’s decision in Syste-
maire, supra, the Board should issue a broad order with
respect to the disputed work, particularly the Co-Ray-
Vac installation to avoid similar jurisdictional disputes in
the future.
The Board customarily declines to grant an areawide
award in cases in which the charged party represents the
employees to whom the work is awarded and to whom
the employer contemplates continuing to assign the
work. See, e.g., Laborers Local 243 (A. Amorello &
Sons), 314 NLRB 501, 503 (1994); Laborers (Paul H.
Schwendener, Inc.), 304 NLRB 623, 625–626 (1991).
different employer does not favor an award of the disputed work to
either group of employees.
Accordingly, we shall limit the present determination to
the particular controversies that gave rise to these pro-
ceedings.
DETERMINATION OF DISPUTES
The National Labor Relations Board makes the follow-
ing Determination of Disputes:
Employees of Charles E. Jarrell Contracting Company,
Inc. represented by United Association of Journeymen
and Apprentices of the Plumbing and Pipefitting Industry
of the United States and Canada, Local Union No. 562,
AFL–CIO, are entitled to perform the work of installing
reflector shields and hangers of the Co-Ray-Vac type
heating system at the Home Depot project in Brentwood,
Missouri.
Employees of Charles E. Jarrell Contracting Company,
Inc. represented by United Association of Journeymen
and Apprentices of the Plumbing and Pipefitting Industry
of the United States and Canada, Local Union No. 562,
AFL–CIO are entitled to perform the installation of a
small, ceiling mounted, self-contained, factory assem-
bled, nonducted air conditioning unit at the Bunzl-USA
project in St. Louis County, Missouri.
Employees of Charles E. Jarrell Contracting Company,
Inc. represented by United Association of Journeymen
and Apprentices of the Plumbing and Pipefitting Industry
of the United States and Canada, Local Union No. 562,
AFL–CIO, are entitled to perform the installation of a
small, floor mounted, self-contained, factory assembled,
nonducted air conditioning unit at the Fern Ridge Office
project in Creve Coeur, Missouri.