330 NLRB 144
Catalina Pacific Concrete Co.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
144
California Portland Cement Co. d/b/a Catalina Pa-
cific Concrete Co. and International Union of
Operating Engineers, Local 12, AFL–CIO.
Cases 21–CA–31978 and 21–CA–32027
November 26, 1999
DECISION AND ORDER
BY CHAIRMAN TRUESDALE AND MEMBERS FOX AND
HURTGEN
On August 17, 1998, Administrative Law Judge Mi-
chael D. Stevenson issued the attached decision. The
Respondent filed exceptions and a supporting brief. The
General Counsel and the Union filed answering briefs.
The Respondent filed a reply brief.
The National Labor Relations Board has delegated its
authority in this proceeding to a three-member panel.
The Board has considered the decision and the record
in light of the exceptions and briefs and has decided to
affirm the judge’s rulings, findings, and conclusions and
to adopt the recommended Order as modified.1
1. We affirm the judge’s conclusion that the Respon-
dent’s April 1996 unilateral changes in the terms and
conditions of employment of its batch plant operators
and its contemporaneous removal of these employees
from the bargaining unit represented by the Union vio-
lated Section 8(a)(5) and (1) of the Act.2 We agree with
the judge that Section 10(b) does not bar litigation of the
April 1997 charges alleging that the Respondent’s 1996
conduct was unlawful. The judge found that the Re-
spondent failed to prove its 10(b) defense that the Union
received notice of the Respondent’s unilateral changes
outside the 6-month limitations period preceding the fil-
ing of the charges. In so finding, the judge articulated
several reasons for rejecting the Respondent’s claim that
the Union gained actual or constructive knowledge of the
unilateral changes through batch operator John Davis in
April 1996. We rely only on those reasons, and support-
ing evidence, establishing that the Respondent had no
reasonable basis for believing that Davis, who had been
the Union’s steward since 1991, had the authority to act
as the Union’s agent with respect to the receipt of notice
of proposed unilateral changes.3 In this regard, the judge
correctly found that there was no contractual basis for
attributing such authority to Davis, nor did the Union
hold him out as possessing such authority. In addition,
we note that the Respondent’s senior vice president and
general manager Robert West testified that he considered
Davis to be a statutory supervisor “sometime after Au-
gust 1995” and possibly before April 1996. Regardless
of Davis’ nominal status as a steward, the Respondent
could hardly have reasonably believed that notice of uni-
lateral changes to someone it was claiming as one of its
supervisor was an acceptable method of communicating
with the Union about those changes. We therefore find
that the Respondent has failed to meet its burden of prov-
ing that the Union received actual or constructive notice
of the unilateral changes through Davis.
1 We shall modify the judge’s recommended Order to conform with
our decision in Indian Hills Care Center, 321 NLRB 144 (1997).
The judge inadvertently failed to include language in the notice stat-
ing affirmatively that the Respondent will bargain with the Union. We
shall modify the notice to reflect this correction.
2 We do not, however, rely on the reasons given by the judge for his
failure to consider the Respondent’s contention that the batch operators
became supervisors in 1992 and, consequently, that its duty to bargain
about them expired when the parties’ 1991–1994 contract expired. We
find instead that the Respondent has failed to meet its burden of show-
ing that any of the additional duties assigned to these employees in-
volved the use of independent judgment in the exercise of any of the
indicia of supervisory authority enumerated in Sec. 2(11).
2. We also affirm the judge’s conclusion that the Re-
spondent violated Section 8(a)(5) when it refused to bar-
gain and withdrew recognition from the Union in April
1997. We agree with the judge that the Respondent
could not in good faith rely on evidence allegedly sup-
porting a claimed doubt of the Union’s continuing major-
ity status because the claim was not raised in a context
free of employer unfair labor practices. We specifically
find that there is a sufficient causal relationship between
the Respondent’s unfair labor practices and the Union’s
alleged loss of support. The Board has recognized that
the unilateral implementation of substantial changes in
terms and conditions of employment has the tendency to
undermine employees’ confidence in the effectiveness of
their
selected
collective-bargaining
representative.
Pirelli Cable Corp., 323 NLRB 1009, 1010 fn. 11
(1997), enf. denied on other grounds 141 F.3d 503 (4th
Cir. 1998); Powell Electrical Mfg. Co., 287 NLRB 969
(1987), enfd. as modified on other grounds 906 F.2d
1007 (5th Cir. 1990). In this case, we have found that
the Respondent implemented significant changes in the
terms and conditions of employment of batch plant op-
erators, who comprise approximately three-fourths of the
bargaining unit, and removed them from the unit without
notice to or bargaining with the Union. In these circum-
stances, it is reasonable to infer that the Respondent’s
unfair labor practices contributed to the alleged employee
disaffection with the Union. Accordingly, we agree with
the judge that it is unnecessary to reach the issue of
whether the manifestations of antiunion sentiment ad-
duced by the Respondent constitute sufficient objective
considerations to warrant a good-faith doubt of the Un-
ion’s continued majority status.
3 We therefore do not rely on those reasons cited by the judge in
support of his view that there was an adversity of interests between
Davis and the Union. Further, we reject the notion that notice to Davis
was untimely for 10(b) purposes because it was untimely for purposes
of bargaining in advance of the proposed changes.
330 NLRB No. 27
CATALINA PACIFIC CONCRETE CO.
145
ORDER
The National Labor Relations Board adopts the rec-
ommended Order of the administrative law judge as
modified below and orders that the Respondent, Califor-
nia Portland Cement Co. d/b/a Catalina Pacific Concrete
Co., Glendora, California, its officers, agents, successors,
and assigns, shall take the action set forth in the Order as
modified.
1. Substitute the following for paragraphs 2(c)–(e).
“(c) Preserve and, within 14 days of a request, make
available to the Board or its agents for examination and
copying, all payroll records, social security payment re-
cords, timecards, personnel records and reports, and all
other records necessary to analyze the amount of back-
pay due under the terms of this Order.
“(d) Within 14 days after service by the Region, post at
all of its Los Angeles and Orange County facilities cop-
ies of the attached notice marked ‘Appendix.’9 Copies of
the notice, on forms provided by the Regional Director
for Region 21, after being signed by the Respondent’s
authorized representative, shall be posted by the Respon-
dent and maintained for 60 consecutive days in con-
spicuous places including all places where notices to
employees are customarily posted. Reasonable steps
shall be taken by the Respondent to ensure that the no-
tices are not altered, defaced, or covered by any other
material. In the event that, during the pendency of these
proceedings, the Respondent has gone out of business or
closed the facility involved in these proceedings, the Re-
spondent shall duplicate and mail, at its own expense, a
copy of the notice to all current employees and former
employees employed by the Respondent at any time
since April 6, 1996.
“(e) Within 21 days after service by the Region, file
with the Regional Director a sworn certification of a re-
sponsible official on a form provided by the Region at-
testing to the steps the Respondent has taken to comply.”
2. Substitute the attached notice for that of the admin-
istrative law judge.
APPENDIX
NOTICE TO EMPLOYEES
POSTED BY ORDER OF THE
NATIONAL LABOR RELATIONS BOARD
An Agency of the United States Government
The National Labor Relations Board has found that we vio-
lated the National Labor Relations Act and has ordered us to
post and abide by this notice.
Section 7 of the Act gives employees these rights.
To organize
To form, join, or assist any union
To bargain collectively through representatives
of their own choice
To act together for other mutual aid or protection
To choose not to engage in any of these protected
concerted activities.
WE WILL NOT refuse to recognize and bargain in good
faith with the Union regarding terms and conditions of
employment of the employees in the unit set forth below
by withdrawing recognition from the Union.
WE WILL NOT refuse to recognize and bargain in good
faith with the Union regarding terms and conditions of
employment of the employees in the unit set forth below
by unilaterally changing the terms and conditions of em-
ployment of its employees without notifying the Union
and affording it an opportunity to bargain.
WE WILL NOT refuse to recognize and bargain in good
faith with the Union regarding terms and conditions of
employment of the employees in the unit set forth below
by unilaterally removing batch plant operators from the
bargaining unit without notifying the Union and afford-
ing it an opportunity to bargain.
WE WILL NOT in any like or related manner interfere
with, restrain, or coerce you in the exercise of the rights
guaranteed you by Section 7 of the Act.
WE WILL recognize and bargain with International Un-
ion of Operating Engineers, Local 12, AFL–CIO as the
exclusive bargaining representative of our employees in
the unit set forth below. The appropriate unit is:
All employees in the Employer’s operations in Los
Angeles, Orange, Ventura, Santa Barbara, San Bernar-
dino, and Riverside Counties as listed in the various
classifications in Appendix “A” of the Agreement be-
tween the Employer and the Union, which was effec-
tive by its terms from September 15, 1991, through
September 15, 1994; excluding all other employees,
executives, superintendents, and other supervisory em-
ployees as defined in Section 2(11) of the National La-
bor Relations Act.
WE WILL, on request of the Union, rescind the unilat-
eral changes in the unit employees’ terms and conditions
of employment implemented since April 1996.
WE WILL restore the status quo ante including the re-
turn of the batch plant operators to the bargaining unit.
CALIFORNIA PORTLAND CEMENT CO. D/B/A
CATALINA PACIFIC CONCRETE CO.
Jean C. Libby, Esq., for the General Counsel.
Gary F. Overstreet and Michael R. Goldstein, Esqs. (Musick,
Peeler & Garrett, L.L.P.) and (Elaine M. Smith, on the
brief), of Los Angeles, California, for the Respondent.
John R. Renninger, Esq., of Glendora, California, and General
Counsel for the Respondent.
David P. Koppelman, Esq. (International Union of Operating
Engineers, Local 12), of Pasadena, California, for the
Charging Party.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
146
DECISION
STATEMENT OF THE CASE
MICHAEL D. STEVENSON, Administrative Law Judge. This
case was tried before me at Los Angeles, California, on Febru-
ary 11, 1998,1 pursuant to a consolidated complaint issued by
the Regional Director for Region 21 of the National Labor Re-
lations Board on July 25, 1997, and which is based on charges
filed by International Union of Operating Engineers, Local 12,
AFL–CIO (the Union) on April 2, 1997 (Case 21–CA–31978),
on July 16, 1997 (amended charge) and on April 29, 1997
(Case 21–CA–32027). The complaint alleges that California
Portland Cement Co. d/b/a Catalina Pacific Concrete Co. (Re-
spondent or Employer) has engaged in certain violations of
Section 8(a)(1) and (5) of the National Labor Relations Act
(the Act).
Issues
I. Whether Respondent violated the Act by making certain
unilateral changes in the duties and responsibilities of bargain-
ing unit employees (batch plant operators), by dealing directly
with the bargaining unit employees, bypassing the Union in the
process, and by purporting to remove the bargaining unit em-
ployees from the unit.
II. Whether Respondent also violated the Act by unlawfully
withdrawing recognition from the Union as the exclusive col-
lective-bargaining representative of the unit and subsequently
refusing to bargain.
All parties were given full opportunity to participate, to in-
troduce relevant evidence, to examine and cross-examine wit-
nesses, to argue orally, and to file briefs. Briefs, which have
been carefully considered, were filed on behalf of the General
Counsel, Charging Party Union, and Respondent.
On the entire record of the case, and from my observation of
the witnesses and their demeanor, I make the following
FINDINGS OF FACT
I. RESPONDENT’S BUSINESS
Respondent admits that it is a corporation engaged in the
processing and sale of rock, sand, gravel, and related products
and having an office located in Glendora, California. Respon-
dent further admits that during the 12-month period ending
May 30, 1997, in the course and conduct of its business, it has
purchased and received at its California facilities goods and
materials valued in excess of $50,000 directly from points out-
side the State of California. Accordingly it admits, and I find,
that it is an employer engaged in commerce and in a business
affecting commerce within the meaning of Section 2(2), (6),
and (7) of the Act.
II. THE LABOR ORGANIZATION INVOLVED
Respondent admits, and I find, that International Union of
Operating Engineers, Local12, AFL–CIO is a labor organiza-
tion within the meaning of Section 2(5) of the Act.
III. THE ALLEGED UNFAIR LABOR PRACTICES
A. The Facts
Beginning in September 1991, or before, the Union and Re-
spondent have maintained a collective-bargaining relationship
1 All dates herein refer to 1996 unless otherwise indicated.
for a bargaining unit described as “all employees in the Em-
ployer’s operations in Los Angeles, Orange, Ventura, Santa
Barbara, San Bernardino and Riverside Counties as listed in the
various classifications in Appendix ‘A’ of [the collective-
bargaining agreement] but excluding executives, superinten-
dents, other supervisory employees, as defined in Sec. 2(11) of
the National Labor Relations Act, and all other employees not
covered by this agreement.” (G.C. Exh. 2, art. II.) Included in
Appendix “A” are the classifications which concern us in the
instant case: batch plant operators and to a lesser extent, plant
repairman.
Respondent owns and operates eight batch plants in Los An-
geles and Orange Counties. The batch plants are part of the
rock, sand and gravel industry that is led by industry giant, Cal-
Mat. More specifically, the batch plant operators, as a core
duty, mix ready-mix concrete product which, when ready, is
loaded onto trucks and transported to customers in the southern
California area. The plant repairmen maintain the equipment
used in this process in good repair.
Robert West joined Respondent in 1992 and is currently sen-
ior vice president and general manager of Respondent’s Redi-
Mix Division. Before his employment with Respondent, West
worked both for Cal Mat and Con/Rock, each for several years
in the same general industry. West testified both as a witness
for the General Counsel and for Respondent.
A collective-bargaining agreement between the parties, ef-
fective between September 15, 1991, and September 15, 1994,
is in the record. (G.C. Exh. 2.) On September 6, 1994, union
and employer officials gathered to begin negotiations for a new
agreement. The union team included Darryl Clark, business
agent for the Union and General Counsel witness at hearing.
The employer team was led by John Gresock, Respondent’s
vice president for human resources. During the meeting the
parties exchanged proposals and engaged in a general discus-
sion of negotiations then occurring in the industry. The Union
agreed to work day-to-day under the soon to expire existing
contract, pending developments in industry negotiations. The
Union also agreed that no work action would be taken until the
next meeting or until after appropriate notice to the employer.
As matters turned out, the parties did not meet again until
July 8, 1995, when both sides gathered at a Pasadena, Califor-
nia hotel. There, the employer tendered its last, best, and final
offer (G.C. Exh. 12) and announced to the Union that at the end
of 30 days, it intended to implement a 12-percent wage reduc-
tion and a $400 cap on health and welfare. As the Union re-
viewed the Employer’s last, best, and final offer, it noted that
article II had been omitted. As noted above, in the expired
agreement, article II contained both section 1, having to do with
union recognition and section 2, which reads as follows:
Supervisor’s Work. Employees excluded from this
Agreement as supervisory employees should not perform
work customarily performed by employees covered by this
Agreement except when life or property is in imminent
danger or in case of critical emergency breakdown. (G.C.
Exh. 2 p. 1.)
According to Clark, the meeting was short and did not in-
volve discussion of the missing article II. Clark explained that
the Union was waiting for developments in outside negotiations
involving the so-called “Big 4,” the major producers in the
industry which included Cal Mat.
CATALINA PACIFIC CONCRETE CO.
147
Apparently the lack of progress in the instant case mirrored
the lack of progress in the industry because on or about July 26,
1995, the Union began an industrywide strike of producers,
including Respondent. Sometime prior to August 5, 1997, the
Union reached agreement with one or more of the “Big 4” pro-
ducers (not including Cal Mat). This agreement led, on August
5, 1997, to an unconditional offer by the Union to return to
work at Respondent. (G.C. Exh. 6.)
During the almost 2-year strike a series of developments oc-
curred, some of which appear to be of only marginal relevance
to this case. For example, a batch plant operator named Pollard
resigned from the Union, crossed the picket line, and filed a
decertification petition with the Board. No action was immedi-
ately taken on this petition pending investigation of certain
union unfair labor practice charges also filed with the Board.
These charges were found to be lacking in merit and in Febru-
ary 1997, they were dismissed. (G.C. Exhs. 9, 10, and 11.)2
Shortly after this Pollard, who did not testify, withdrew his
decertification petition.
Pollard was not the only batch plant operator to cross the
picket line. In fact, most of the 15 in the bargaining unit
crossed before the Union’s offer to return to work. Unlike
Pollard, however, the others did not resign from the Union.
None of the five plant repairmen crossed the line. After the
first 2 months of the strike, there was no significant picketing
of any of Respondent’s facilities.
Sometime during the strike, the Union learned from an
NLRB agent that Respondent was contending that its batch
plant operators were no longer bargaining unit employees, but
had become statutory supervisors. This information led to a
letter of April 9, 1997, from William Waggoner, the Union’s
business manager, to Respondent, alluding to the recent with-
drawal of the decertification petition and requesting Respon-
dent to resume negotiations. More specifically, Waggoner
wrote,
[P]lease let me know if you are prepared to negotiate for an
agreement to cover all classifications covered by the most re-
cent agreement, or if you are contending that some of these
classifications (particularly Batch Plant Operators) are no
longer part of the bargaining unit. [G.C. Exh. 3.]
The Union’s letter was answered on April 9, 1997:
William C. Waggoner
Business Manager, I.U.O.E. Local
Union No. 12 and General Vice President
International Union of Operating Engineers
150 East Corson Street
P.O. Box 7100
Pasadena, California 91109
Re: Response to Request for Negotiations
Dear Mr. Waggoner:
I am writing in response to your letter dated April 9,
1997, to John Clemente.
The employer has a good faith doubt that your organi-
zation enjoys majority support of a bargaining unit of
batch operators and repairmen, or a bargaining unit of
2 There are no issues in this case involving Employer’s bad-faith
bargaining, implementation of proposals before impasse, nor refusal to
reinstate unfair labor practice strikers.
batch operators only, or a bargaining unit of repairmen
only, and therefore rejects your request for negotiations.
Additionally, the employer rejects your request for ne-
gotiations regarding batch operators because the batch op-
erators are supervisors.
If you have any questions, please call.
Very truly yours,
/s/ Gary F. Overstreet
for Musick, Peeler & Garrett LLP
[G.C. Exh. 4.]
This letter in turn was followed by a Union letter of April 28,
1997:
Via FAX & U.S. Mail
Gary F. Overstreet, Esq.
Music [sic], Peeler & Garrett
One Wilshire Boulevard
Los Angeles, CA 90017-3383
Re: California Portland Cement d/b/a Catalina
Pacific Concrete
Dear Mr. Overstreet:
Receipt is acknowledged of your letter dated April 18,
1997 (received April 25) addressed to William C. Wag-
goner.
The Batch Plant Operator position has been considered
a bargaining unit position in successive collective bargain-
ing agreements between Local 12 and California Portland
Cement d/b/a Catalina Pacific Concrete. The Union does
not consent to its removal from the bargaining unit. Con-
sequently, it is demanded that the Company withdraw its
insistence on removing this position from the bargaining
unit.
Further, although your letter does not so state explic-
itly, I am assuming that your client is unilaterally with-
drawing recognition from I.U.O.E., Local 12 as exclusive
bargaining representative of its employees in whatever
unit is deemed appropriate for bargaining, based on a pur-
ported good faith doubt of majority status. Please advise
immediately if this is incorrect in any respect.
Very truly yours,
/s/ David P. Koppelman, Counsel
I.U.O.E. Local Union No. 12
[G.C. Exh. 5.]
To better explain the pending issues, I look back to 1992
when, apparently without notice to or bargaining with the Un-
ion, the batch plant operators were assigned additional duties as
dispatchers. According to West, testifying as a respondent
witness, dispatcher duties involved decisions by the batch plant
operators on a daily basis, as to how many trucks were needed
and at what times in order to meet production requirements. In
addition, batch plant operators could and did talk to customers
on the telephone, quoting prices for product and arranging driv-
ers’ schedules for delivery. West explained that this change in
job duties was merely a change back to what the batch plant
operators had been doing years before. Sometime prior to
1992, Respondent reassigned the dispatcher duties to salaried
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
148
persons who did only dispatcher work. This reassignment too
was done without notice to or bargaining with the Union.
Moving now to April 4, I note a respondent interoffice
memorandum of that date directed to “Record” from Bill
Klawitter (respondent official) re “Additional Batchman Du-
ties.” The memo recited that on April 3 and 4, a series of meet-
ings had been held to discuss the attached list of additional
batchman duties. The memo goes on, “It was recognized by all
in attendance that most of these duties have been performed by
the batchmen in the past and that while not all batchmen will
perform all of the duties mentioned, there will be a shared re-
sponsibility to perform them.” [G.C. Exh. 13.] Appended to
the memo was a second page entitled “Additional Batchman
Duties.” These duties are:
1. Interviews and approves mixer driver hires.
2. Participates in driver disciplinary process:
(x) Authority to initiate driver discipline.
(x) Signs all driver disciplinary documentation.
3. Takes and schedules concrete orders as required.
4. Dispatches drivers to jobsites as required.
5. Provides input into daily mixer truck driver manpower
Requirements and starting times.
6. Determines daily driver ending times.
7. Clocks out drivers at the end of the workday.
8. Orders and schedules the receipt of aggregates.
9. Orders and schedules the receipt of cement.
Most of these duties were new, or substantially new, or a con-
tinuation of the batch plant operator’s prior dispatch duties,
with some embellishment.
West testified that additional new duties were assigned to
batch plant operators at or about the same time:
1. Assignment to accident review boards as manage-
ment representatives. Respondent’s practice had been to
review vehicle accidents for cause and future prevention
by assigning three management and two bargaining unit
representatives to each panel. Before the change, batch
plant operators sat as bargaining-unit representatives.
2. Increased involvement in evaluation of capital pro-
jects and of proposed modifications of plant equipment.
3. In Orange County, assumption of duties from opera-
tions manager of selecting driver of the year.
4. In Orange County, attendance at annual retreat for
management employees and at both Orange County and
Los Angeles County, attendance at management training
seminars.
All batch plant operators, including a batch plant operator
named John Davis, who, since September 25, 1991, had been a
shop steward for the bargaining unit in question pursuant to a
letter of that date from the Union to the Employer, were noti-
fied of these changes.3 The duties of a job steward are set forth
in the expired collective-bargaining agreement. (G.C. Exh. 2,
article XIV, Grievance Procedure, sec. 6, p. 26) and which
reads as follows:
Section 6. Steward. The job Steward shall be a work-
ing employee selected by the Union. A Steward shall not
3 After the strike began and perhaps before April 1996, Davis was
unilaterally assigned additional duties to hire, discipline, and evaluate
plant repairmen. If it unclear how much, if any of his former batch
plant operator duties he still performed.
be discriminated against by the Employer or his Agent be-
cause of, or on account of, his activities in presenting any
adjustment or grievances or disputes. The Steward shall
work with the Employer’s designated Representative in an
attempt to resolve disputes prior to the application of the
grievance procedure. It is recognized by the Employer
that it is desirable that the person appointed Steward shall
remain in employment at his job location as long as there
is work in the particular craft or trade of the Steward, so
long as he performs his duties as an employee to the satis-
faction of the Employer. The Steward shall be given a
reasonable length of time during working hours to perform
his activities as a Steward when such activities cannot be
conducted on non-working time. The Steward shall be on
the Safety Committee at the plant to which he is assigned.
Davis did not testify in this hearing, but was one of those
who crossed the picket line to return to work without first re-
signing from the Union.4 Davis, also on January 21, 1996,
submitted a signed, written request “to terminate and cease
deduction of supplemental union dues from my payroll check
effective immediately.” (G.C. Exh. 14.)
It is undisputed that except for such notice as went to the
batch plant operators themselves, and to Davis in his role as
shop steward, no other notice of the changes in batch plant
operators’ duties and responsibilities was given to the Union,
prior to the effective date of such changes and the Union was
afforded no opportunity to bargain over them. On direct ex-
amination West explained Respondent’s thinking on this sub-
ject:
A. I don’t know that we felt it was pertinent, and num-
ber two, at that point, we really weren’t thinking so much
about the Union . . . nobody in our company had really
heard from the Union for a year and a half or two years at
that point, . . . and they really weren’t uppermost in our
thoughts, I guess. [Tr. 117.]
Based on the new duties and responsibilities unilaterally as-
signed to the batch plant operators, Respondent contends that
they have become statutory supervisors under the Act and are
no longer members of the bargaining unit. To give additional
context to this claim, I note that as of April, when the new du-
ties were assigned, the batch plant operators received no change
in their pay or benefits. In January 1997, they received a pay
increase of 25 cents per hour. Also, sometime after April, the
batch plant operators were switched from union-sponsored
health insurance to a company plan. In October 1997, Respon-
dent unilaterally changed the titles of batch plant operators to
plant supervisor I, II, or III. Then, just 2 or 3 months prior to
this hearing, Respondent unilaterally converted a few of the
now-titled “plant supervisors” to salaried status.
Finally, I note the chain of command for Respondent’s or-
ganization. For Orange County, a vice president and general
manager named Bill Klawitter is in charge and assisted by an
operations manager. For Los Angeles County, Mike Parker is
vice president and general manager and he is assisted by two
operations managers. All of the former batch plant operators
4 Attorney Koppelman, testifying as a General Counsel rebuttal wit-
ness, explained that pursuant to union policy, no member who crosses a
picket line and returns to work is subject to union discipline until after
the labor dispute has ended and the person is afforded an opportunity to
justify or mitigate his cross-over status.
CATALINA PACIFIC CONCRETE CO.
149
who supposedly are now plant supervisors report to the plant
operations managers; the same persons to whom they reported
when they were admitted to be in the bargaining unit. So far as
I can tell, the only former batch plant operator who has any
subordinates to supervise is John Davis, who, according to
West, “takes the lead role in the repair of the batch plants.”
(Tr. 137.)
B. Analysis and Conclusions
1. No adverse inference
At page 6 of its brief, Respondent contends that it notified
Union Steward John Davis in April of the change in duties of
the batch plant operators. Davis was supposed to be a witness
in the hearing but refused to appear after someone apparently
threatened him if he testified. Respondent’s attorney so repre-
sented to me and the General Counsel acknowledged that some
sort of threat was made to Davis. (Tr. 163.) In light of this, I
need not determine whether an adverse inference could be
drawn and weighed against Respondent. Assuming I could
draw such inference, in my discretion, I elect not to consider
the matter further. See Underwriters Laboratories v. NLRB,
147 F.3d 1048 (9th Cir. 1998).
2. Batch plant operators’ supervisory status as of 1992
Respondent argues in its brief, that the batch plant operators
have been supervisors since 1992, because “employees who
dispatch trucks are statutory supervisors.” (Br. 7.) The short
answer to this rather extravagant assertion may be found in the
case of NLRB v. Joy Recovery Technology Corp., 134 F.3d
1307, 1313 (7th Cir. 1998), where the court explained that the
distinction between supervisors and employees “is not always
an easy distinction to draw, and a position as a dispatcher is one
which falls on the line. Ultimately, the court affirmed the
Board’s finding that the dispatcher position in that case was not
proven to be that of a statutory supervisor. See also Carry Cos.
of Illinois, 311 NLRB 1058, 1060 fn. 12, 1064 (1993).
Little additional time need be spent on Respondent’s claim.
First, it is not supported by the strict notice requirements to the
Union which the Board demands and which will be recited
below. As I will further explain below, because Respondent
failed to prove it met the notice requirements in 1992, any
claim that the batch plant operators were converted to statutory
supervisors must fail. Based on that legal bar, I decline to dis-
cuss the law of supervisory status and dispatchers.
However, even if it could be proven that the Union had
proper prior notice in 1992 of the additional dispatching duties
and, thereafter, the Union waived its right to demand bargain-
ing, I find that such failure would have no effect on the April
changes, which are the subject of this case. See Owens-
Corning Fiberglass, 282 NLRB 609 (1987) (union’s acquies-
cence in prior unilateral changes does not operate as a waiver of
its right to bargain over such changes for all time). See also
Rockwell International Corp., 260 NLRB 1346 fn. 6 (1992).
Finally, even if Respondent could overcome the hurdles de-
scribed above—an impossible job in my view—it ends up
marching in place. In Gratiot Community Hospital, 312 NLRB
1075 fn. 1 (1993), the Board assumed for the sake of argument
that certain employees were statutory supervisors, and con-
cluded that the unilateral changes regarding them would never-
theless be unlawful. The Board explained that when parties to
a collective-bargaining relationship voluntarily agree to include
supervisors in a unit (as is true under Respondent’s theory
here), the Board will order that application of the terms of the
collective-bargaining agreement to those supervisors. (Cita-
tions omitted.) In sum, even if the batch plant operators were
supervisors, to remove them from an agreed-on unit, Respon-
dent would have had to give proper notice to and bargained
with the Union.
3. Batch plant operators’ supervisory status as of April 1996
I begin here with some basic law. An employer violates Sec-
tion 8(a)(5) and (1) of the Act if it makes a unilateral change to
an existing term or condition of employment without bargain-
ing with the union to impasse. Litton Financial Printing v.
NLRB, 501 U.S. 190, 198 (1991). Of course, the union could
waive its right to bargain,5 so the law requires that notice be
given in a meaningful manner and at a meaningful time. Met-
ropolitan Teletronics, 279 NLRB 957 (1986), enfd. 127 LRRM
2048 (2d Cir. 1987). See also Fountain Valley Regional Hospi-
tal, 297 NLRB 549, 551 (1990). Where this has not occurred,
the question of union waiver of its rights is not implicated.
Mercy Hospital of Buffalo, 311 NLRB 869, 873 (1993); S & I
Transportation, 311 NLRB 1388, 1390 (1993.
In this case, it is undisputed that Respondent gave no formal
notice to the Union when it purported to change the batch plant
operators’ duties and responsibilities. Instead, it merely an-
nounced a fait accomplis on April 6 to the batch plant opera-
tors, including the union steward, Davis. As the Union points
out in its brief, page 11, the “notice” Respondent supplied was
deficient for two reasons: First, the Company is required to
notify the Union itself, not just the bargaining unit employees,
and second, [such notice] must be “sufficiently in advance of
actual implementation of the decision to allow reasonable scope
for bargaining.” NLRB v. Walker Construction Co., 928 F.2d
695, 696–697 (5th Cir. 1991).
Respondent contends that one of the affected employees
given notice was the shop steward, Davis. It is not necessary to
determine whether proper notice to a shop steward could ever
satisfy an employer’s obligation under the Act.6 In this case it
did not. First, the notice was not timely. Second, Davis had
crossed the picket line and was working while the strike con-
tinued. Third, by letter of January 21, Davis revoked his dues-
authorization checkoff. Fourth, the collective-bargaining
agreement defining the duties of the shop steward makes no
mention of any intention by the parties to allow the shop stew-
ard to receive notice of any unilateral changes and fifth, there
was no holding out of Davis by the Union as possessing appar-
ent authority to become a general agent for it. For example,
Davis did not attend either of the two bargaining sessions. I
agree completely with the General Counsel, brief, page 19, that
Davis’ interests and the Union’s were not only adverse, but
were antagonistic to each other. There simply is no way that
any notice to Davis or to any other employee satisfied Respon-
dent’s obligation.
4. Respondent’s affirmative defenses
Respondent’s asserted defenses are uniformly without merit.
It first claims that the 6-month statute of limitations bars the
instant case. To support this argument, Respondent inconsis-
5 Any such waiver must be shown by clear and unmistakable evi-
dence. Taylor Warehouse Corp. v. NLRB, 98 F.3d 892, 902 (6th Cir.
1996).
6 See Aztec Bus Lines, 289 NLRB 1021 1038 (1988). Cf. Yellow
Freight Systems, 307 NLRB 1024 1028 (1992).
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
150
tently skips over its contention that the batch plant operators
allegedly were supervisors since 1992 and, instead, bases its
entire argument on the claim that the Union must be charted
with whatever knowledge Davis had as of April.
The 10(b) period commences only when a party has clear
and unequivocal notice that the Act has been violated, Carrier
Corp., 319 NLRB 184, 190 (1995; Leach Corp., 312 NLRB
990, 991 (1993); or where a party in the exercise of reasonable
diligence should have been aware that there has been a viola-
tion of the Act, (i.e., constructive notice); Carrier, supra; Mine
Workers District 12, 315 NLRB 1052 (1994); The burden of
showing such clear and unequivocal notice or lack of diligence
is on the party raising the affirmative defense of Section 10(b);
Carrier, supra; and Leach, supra. Based on my discussion of
Davis and his questionable status as shop steward above, I find
that no reasonable claim can be made that the Union is charged
either with actual or constructive knowledge of whatever Davis
knew as of April. See Nursing Center at Vineland, 318 NLRB
337, 338–339 (1995); Randolph Children’s Home, 309 NLRB
341, 344 (1992). I find Respondent has failed to carry its bur-
den to prove the 10(b) defense.
Respondent next argues (Br. 8) that the “common law of the
shop” permitted Respondent to make the unilateral change at
issue. Thus, argument is based on Respondent’s apparent as-
signment of dispatching duties to the batch plant operators
without notice to or bargaining with the Union in 1992. Since
there was no proper notice to the Union, the Union never
waived its right to bargain and clearly the Union never waived
its right to bargain over future unlawful acts of a similar type.
In any event, whatever happened in 1992 regarding assignment
of dispatching duties can hardly be sufficient to establish a
“past practice.” See Dow Jones & Co., 318 NLRB 574, 576
(1995).
Next, Respondent states (Br. 8) that the Union abandoned the
bargaining unit. This theory is as untenable and unsupported
by the evidence as Respondent’s other defense. During the
time between the last bargaining session in July 1995 and the
almost 2-year industry strike, the Union was not in a state of
repose. Rather, as the record shows, it was busy attempting to
reach settlements with larger producers in the industry, and
filing unfair labor practice charges against Respondent. That
some of these charges lacked merit is beside the point. The
Union’s failure to bring charges against its members who
crossed the picket line is an internal union matter of no concern
to Respondent. Moreover, the Union’s attorney, Koppelman,
adequately explained in his testimony the Union’s policy re-
garding picket line crossers and the underlying rationale for this
policy. See Albany Steel, 309 NLRB 442 448–449 (1992).
Finally, Respondent contends that it has a good-faith doubt
of the Union’s majority support and directs my attention to the
recent Supreme Court decision in Allentown Mack Sales &
Service v. NLRB, 522 U.S. 359 (1998). Allentown Mack did not
make new law but merely restated and clarified the law on
good-faith doubt which had existed for some time. I begin with
a statement of applicable law from I. P. Hardin, The Developing
Labor Law 571 (3d ed. 1992):
An employer may withdraw recognition from an incumbent
union at any time when such withdrawal is not precluded by
law if it can affirmatively establish either (1) that the union no
longer enjoyed majority status when recognition was with-
drawn, or (2) that the withdrawal was predicated on a rea-
sonably grounded doubt as to the union’s continued majority
status, which doubt was asserted in good faith, based upon ob-
jective considerations, and raised in a context free of em-
ployer unfair labor practices. Furthermore, the employer must
be aware of the objective facts upon which its doubt is based
at the time it withdraws recognition. [Citations omitted.]
For two reasons, I decline to review the evidence presented by
Respondent on this matter. First, it is not raised in a context
free of unfair labor practices. See Lee Lumber & Building Ma-
terial Corp., 322 NLRB 175 (1996), affd. in part 117 F.3d 1454
(D.C. Cir. 1997).7 More importantly, Respondent never
claimed at the relevant time to have taken unilateral action nor
to have withdrawn recognition based on a good-faith doubt.
Instead, it gave a host of other reasons which have been consid-
ered in this decision. The good-faith doubt defense has been
dredged up after the fact. In sum, I do not find that Respon-
dent’s alleged doubt was based on good faith and I do not find,
for the reasons stated, that Respondent’s claim needs to be con-
sidered on its merits.
5. Concluding findings
I find that the unilateral change in duties and responsibilities
for batch plant operators were material, substantial, and signifi-
cant changes in terms and conditions of employment, which are
mandatory subjects of bargaining. Rangeaire Co., 309 NLRB
1043 1045–1046 (1992). Compare, Pittsburgh Metal Process-
ing Co., 286 NLRB 734 fn. 2 (1987), where the Board ex-
plained that promotion of two bargaining unit employees to
supervisory positions did not have a “substantial impact” on the
bargaining unit and that the General Counsel failed to prove
that the promotions resulted in the elimination of any unit clas-
sifications. Here, by contrast, approximately three-fourths of
the bargaining unit was eliminated, as was the entire classifica-
tion of batch plant operators. See Kendall College, 228 NLRB
1083, 1088 (1972).
I further find that Respondent also purported to change the
scope of the unit which attempt was a permissive subject of
bargaining in that it did not involve wages, hours, or other
terms or conditions of employment. Antelope Valley Press, 311
NLRB 459, 460 (1993). See also Taylor Warehouse Corp., 98
F.3d 892, 902 (6th Cir. 1996). Since the batch plant operators
were not supervisors, Respondent’s attempt to remove them
from the unit violated Section. 8(a)(5) of the Act. Spenton-
bush/Red Star Cos., 319 NLRB 988, 989 (1995), enf. denied
106 F.3d, 484 (2d Cir. 1997).
Finally, at pp. 10 and 11 of her brief, the General Counsel in-
troduces portions of her arguments by referring to Respon-
dent’s alleged direct dealing with employees. Nowhere in the
text of the relevant arguments is this contention developed.
This omission is peculiar since the alleged violation is not self-
evident. In Allied-Signal, Inc., 307 NLRB 752, 753–754
(1992), in the context of unilateral changes, the Board dis-
cussed direct dealing with employees leading to erosion of the
Union’s position as exclusive representative. In Allied-Signal,
supra at. 754, the Board stated that “Direct dealing with em-
7 As to the nexus between the unremedied unfair labor practices and
the alleged employee dissatisfaction, the question is simply whether the
(employer’s) actions could have contributed to employee dissatisfac-
tion. Direct evidence of causation is not required. NLRB v. Hi-Tech
Cable Corp., 128 F.3d 271 (5th Cir. 1997). I find the necessary nexus
present here.
CATALINA PACIFIC CONCRETE CO.
151
ployees goes beyond mere unilateral employer action.” In light
of General Counsel’s failure to discuss this allegation in her
brief, and my inability to find the elements of this allegation in
the proof presented, I will recommend that it be dismissed.
Based on the above discussion, with the single exception re-
lating to the direct dealing, I find that Respondent violated Sec-
tion 8(a)(1) and (5) of the Act as alleged.
CONCLUSIONS OF LAW
1. Respondent is an employee engaged in commerce and in
a business affecting commerce within the meaning of Section
(6) and (7) of the Act.
2. The Union is a labor organization within the meaning of
Section 2(5) of the Act.
3. Respondent’s assorted affirmative defenses have not been
proven and are without merit.
4. Respondent has violated Section 8(a)(1) and (5) of the
Act by unilaterally changing the terms and conditions of bar-
gaining-unit employees and by unilaterally removing batch
plant operators from the bargaining unit.
5. Under the facts and circumstances of this case, Respon-
dent may not assert a good-faith doubt of the Union’s majority
status.
6. The appropriate unit is described as all employees in the
Employer’s operations:
In Los Angeles, Orange, Ventura, Santa Barbara, San Bernar-
dino, and Riverside Counties as listed in the various classifi-
cations in Appendix “A” of the Agreement [G.C. Exh. 2] but
excluding executives, superintendents, other supervisory em-
ployees, as defined in Section 2 (11) of the National Labor
Relations Act and all other employees not covered by this
agreement.
THE REMEDY
Having found that California Portland Cement Co. d/b/a
Catalina Pacific Concrete Co. engaged in certain unfair labor
practices, I shall recommend that it be ordered to take certain
affirmative action to effectuate the policies of the Act, includ-
ing restoration of the status quo ante, except in such cases
where the Respondent’s unilateral changes involve the granting
of a benefit to employees, in which case benefits should be
rescinded only on the Union’s demand
On these findings of fact and conclusions of law and on the
entire record, I issue the following recommended8
ORDER
The Respondent, California Portland Cement Co. d/b/a Cata-
lina Pacific Concrete Co., Glendora, California, its officers,
agents, successors, and assigns, shall
1. Cease and desist from
(a) Refusing to recognize and bargain in good faith with the
Union regarding terms and conditions of employment of the
employees in the unit set forth below by withdrawing recogni-
tion from the Union.
(b) Refusing to recognize and bargain in good faith with the
Union regarding terms and conditions of employment of the
8 If no exceptions are filed as provided by Sec. 102.46 of the Board’s
Rules and Regulations, the findings, conclusions, and recommended
Order shall, as provided in Sec. 102.48 of the Rules, be adopted by the
Board and all objections to them shall be deemed waived for all pur-
poses.
employees in the unit set forth below by unilaterally changing
the terms and conditions of employment of its employees with-
out notifying the Union and affording it an opportunity to bar-
gain.
(c) Refusing to recognize and bargain in good faith with the
Union regarding terms and conditions of employment of the
employees in the unit set forth below by unilaterally removing
batch plant operators from the bargaining unit without notifying
the Union and affording it an opportunity to bargain. The ap-
propriate unit is:
All employees in Respondent’s operations in Los Angeles,
Orange, Ventura, Santa Barbara, San Bernardino, and River-
side Counties as listed in the various classifications in Appen-
dix “A” of the agreement between Respondent and the Union,
which was effective by its terms from September 15, 1991,
through September 15, 1994; excluding all other employees,
executives, superintendents, and other supervisory employees
as defined in Section 2(11) of the National Labor Relations
Act.
(d) In any like or related manner interfering with, restrain-
ing, or coercing employees in the exercise of the rights guaran-
teed them in Section 7 of the Act.
2. Take the following affirmative action necessary to effec-
tuate the policies of the Act.
(a) On request, bargain with the Unions as the exclusive col-
lective-bargaining representatives of the employees in the ap-
propriate unit described above concerning wages, hours, work-
ing conditions and other terms and conditions of employment
and, if an understanding is reached, embody the understanding
in a signed agreement.
(b) On request of the Union, rescind the unilateral changes
in the unit employees’ terms and conditions of employment
implemented since April 1966.
(c) Restore the status quo ante including the return of the
batch plant operators to the bargaining unit.
(d) Preserve and, on request, make available to the Board or
its agents for examination and copying, all payroll records,
social security payment records, timecards, personnel records
and reports, and all other records necessary to analyze the
amount of backpay due under the terms of this Order.
(e) Post at all of its Orange County and Los Angeles County
facilities copies of the attached notice marked “Appendix.”9
Copies of the notice, on forms provided by the Regional Direc-
tor for Region 21, after being signed by the Respondent’s au-
thorized representative, shall be posted by the Respondent im-
mediately upon receipt and maintained for 60 consecutive days
in conspicuous places including all places where notices to
employees are customarily posted. Reasonable steps shall be
taken by the Respondent to ensure that the notices are not al-
tered, defaced, or covered by any other material. In the event
that, during the pendency of these proceedings, Respondent has
gone out of business or closed its facilities involved in these
proceedings, Respondent shall duplicate and mail, at its own
expense, a copy of the notice to all current employees and for-
9 If this Order is enforced by a judgment of a United States court of
appeals, the words in the notice reading “Posted by Order of the Na-
tional Labor Relations Board” shall read “Posted Pursuant to a Judg-
ment of the United States Court of Appeals Enforcing an Order of the
National Labor Relations Board.”
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
152
mer employees employed by Respondent at any time since
April 6, 1996.
(f) Notify the Regional Director in writing within 20 days
from the date of this Order what steps the Respondent has taken
to comply.