332 NLRB 527
Electrical Workers Local 98 (Honeywell)
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
526
International Brotherhood of Electrical Workers,
Local Union No. 98 and Honeywell Inc., Home &
Building Control. Case 4–CD–991
September 29, 2000
DECISION AND DETERMINATION OF DISPUTE
BY MEMBERS FOX, LIEBMAN, AND HURTGEN
The charge in this Section 10(k) proceeding was filed on
October 16, 1998, by Honeywell Inc., Home & Building
Control, alleging that the Respondent, the International
Brotherhood of Electrical Workers, Local Union No. 98
(Local 98), violated Section 8(b)(4)(D) of the National
Labor Relations Act by engaging in proscribed activity
with an object of forcing the Employer (Honeywell) to
assign certain work to electricians it represents who are
employed by various contractors rather than to installers it
represents who are employed by Honeywell. The hearing
was held on November 24 and December 3, 1998, before
Hearing Officer Allene McNair-Johnson.
The National Labor Relations Board has delegated its
authority in this proceeding to a three-member panel.
The Board affirms the hearing officer’s rulings, finding
them free from prejudicial error. On the entire record, the
Board makes the following findings.1
I. JURISDICTION
Honeywell is a Delaware corporation engaged in the
business of installing and servicing commercial and home
security systems. It has approximately 40 security offices
in the United States, including a facility in Philadelphia,
Pennsylvania. During the 12-month period prior to the
hearing, Honeywell purchased and received goods and
materials valued in excess of $50,000 at its Philadelphia,
Pennsylvania facility directly from points located outside
the Commonwealth of Pennsylvania. The parties stipulate,
and we find, that the Employer is engaged in commerce
within the meaning of Section 2(6) and (7) of the Act and
that Local 98 is a labor organization within the meaning of
Section 2(5) of the Act.
II. THE DISPUTE
A. Background and Facts of Dispute
Dranoff Properties is the owner of the Locust on the
Park apartment complex in Philadelphia, Pennsylvania, a
major construction project. In August 1998,2 Honeywell
entered into a contract with Dranoff to install a security
system at Locust on the Park. The installation was to be-
gin in October, and take 6 to 10 weeks. The security sys-
tem included a telephone entry system, emergency phone
access control/alarm monitoring, and closed circuit televi-
sion. Installation of the security system involved pulling
or running low-voltage wires through walls and/or ceil-
ings, mounting the security devices, connecting wires to
the security devices and to the control panel, programming
the control panel to perform particular functions and make
the system operational, and testing the system.
1 We grant the Employer’s unopposed motion to correct the tran-
script.
2 All subsequent dates are in 1998.
Honeywell assigned the security system installation
work at Locust on the Park to its installer employees.
These Honeywell installers are represented by Local 98.
At all times material, Local 98 and Honeywell have had a
current collective-bargaining agreement covering Honey-
well’s installers. Local 98 also represents electricians who
work for over 100 other contractors. Honeywell has no
contract with Local 98 covering electricians.
On October 8, Honeywell Installer Edward Klak re-
ported to the jobsite at Locust on the Park to begin the first
step in installing the security system, running the wires for
the system. Klak told Local 98 Business Agent John Der-
shimer that he was there to do some alarm, camera, and
card access work. Klak testified that Dershimer told him
that “it was a building trades job and that [Honeywell in-
stallers] would not be running the wire.” Klak left the
jobsite without beginning the installation work.
Klak returned to the jobsite on October 13 with Honey-
well Installer Ronald Kinter. They were directed to talk to
Dershimer at the union hall. Klak and Kinter went to the
union hall and asked Dershimer what the problem was.
According to Klak, Dershimer said, “[W]hen the job is bid
that it’s bid to be done at the A rate . . . then Honeywell
comes in and underbids that . . . if Honeywell wants to bid
it at the A rate and have an A rate contract they could do
the work, otherwise it was a building trades job[.]” Der-
shimer acknowledges telling Klak and Kinter at the union
hall that “it was a building trades job to be done by build-
ing trades personnel.” The Honeywell installers did not go
back to the jobsite on October 13.
On October 16, Honeywell Installer Kinter reported to
the jobsite with Honeywell Service Manager Matt Slusar-
ski to start pulling the wires for the security system. Bill
Carrazzo introduced himself as the Local 98 business
agent.3 Kinter told Carrazzo that they were there to pull
lines for the job. According to Kinter’s unrefuted testi-
mony, Carrazzo asked them, “Weren’t you down at the
union hall and you were told that you cannot pull lines in
here, it’s an A card job.” Carrazzo further said, “If you
pull lines, it’s going to—if you attempt to pull any lines,
it’s going to be a job stoppage.” Kinter asked Carrazzo
what he meant by job stoppage and Carrazzo replied, “[I]f
you pull any lines it’s going to be a job stoppage and we’re
3 Dershimer testified that Carrazzo is a Local 98 organizer.
332 NLRB No. 51
ELECTRICAL WORKERS LOCAL 98 (HONEYWELL, INC.)
527
going to throw a picket line up.” Slusarski clarified with
Carrazzo by asking, “[I]f we pull lines that you’re going to
have a job stoppage and also you’re going to picket the
place?”
Honeywell Business Unit Leader Anthony Pagnotti tes-
tified that because Honeywell installers were not allowed
to proceed with the work, Honeywell fell behind on the
job. He further stated that Honeywell was in jeopardy of
losing the contract and being sued for non-performance.
As a result, Honeywell assigned the work of pulling the
wires to Sunshine Electric, the on-site electrical contractor
whose employees were represented by Local 98.
B. Work in Dispute
As set forth in the notice of hearing, the disputed work
involves the installation of security systems, devices and
equipment, including control panels, card access systems
and closed circuit television security devices, the pro-
gramming of the panels, and the running of low-voltage
wiring related to the installation or operation of security
and fire alarm systems and camera and card access sys-
tems at the new construction project at Locust on the Park
at 232–254 South 24th Street, Philadelphia, Pennsylvania.
C. Contentions of the Parties
Honeywell contends that there are competing claims for
the installation work and reasonable cause exists to believe
that Local 98 has violated Section 8(b)(4)(D) of the Act. It
further argues that the work in dispute should be awarded
to its installers based on the factors of certification and
collective-bargaining agreement, employer preference and
past practice, area and industry practice, relative skills, and
economy and efficiency of operations.
Local 98 contends that the Board should quash the no-
tice of hearing because there are no competing claims for
the work and no reasonable cause to believe that Section
8(b)(4)(D) of the Act was violated. Local 98 also argues
that the arbitration provision of the collective-bargaining
agreement between Honeywell and Local 98, asserted to
be the only parties in this case, provides a voluntary
method of resolving the instant dispute. If the Board de-
cides to issue an award of work, Local 98 argues that the
work should be awarded to its electricians based on the
factors of relative skills and area and industry practice.
D. Applicability of the Statute
Before the Board may proceed with a determination of
dispute under Section 10(k) of the Act, it must be satisfied
that: (1) there are competing claims for the work; (2) there
is reasonable cause to believe that Section 8(b)(4)(D) has
been violated;4 and (3) the parties have not agreed on a
method for the voluntary adjustment of the dispute.
We find that there are competing claims for the work by
two different groups of employees, despite the fact that
both groups of employees are represented by Local 98.5
That the work has been claimed on behalf of Local 98-
represented installers employed by Honeywell is evi-
denced by the fact that Honeywell initially assigned the
security installation work to its installers who, on several
occasions, tried to perform the work but were turned away
by Local 98 representatives. As to the rival claim, Local
98, through its statements, claimed the work on behalf of
non-Honeywell electricians whom it represents, and those
electricians ultimately performed the work. Longshore-
men ILWU Local 8 (Collier Carbon & Chemical Corp.),
231 NLRB 179, 180 (1977) (employees’ performance of
the work indicated that they claim the work in dispute).
We further find reasonable cause to believe that Section
8(b)(4)(D) has been violated based on the uncontradicted
testimony that Local 98 agent Carrazzo threatened that
there would be a job stoppage and a picket line if the Hon-
eywell installers performed the work in dispute.
Finally, there is also no agreed-upon method for volun-
tary adjustment of the dispute within the meaning of Sec-
tion 10(k) of the Act. The arbitration provision relied on
by Local 98 does not specifically encompass jurisdictional
disputes and, in any event, the collective-bargaining
agreement between Honeywell and Local 98 (covering
Honeywell installers) does not apply to, and would have
no binding effect on, the Local 98 electricians. Painters
Local 479 (Giltspur Exhibits/Pittsburgh), 278 NLRB
1021, 1023–1024 (1986).
Accordingly, we find that the dispute is properly before
the Board for determination. Therefore, we reject Local
98’s argument that the notice of hearing should be
quashed.
E. Merits of the Dispute
Section 10(k) requires the Board to make an affirmative
award of disputed work after considering various factors.
NLRB v. Electrical Workers IBEW Local 1212 (Columbia
Broadcasting), 364 U.S. 573 (1961). The Board has held
that its determination in a jurisdictional dispute is an act of
judgment based on common sense and experience, reached
by balancing the factors involved in a particular case.
44 We note that “[t]his reasonable cause standard is substantially
lower than that required to establish that the statute has in fact been
violated.” Plumbers Local 562 (C & R Heating & Service Co.), 328
NLRB 1235 (1999).
5 See Bricklayers Local 1 of Tennessee (Shelby Marble & Tile), 188
NLRB 148 (1971).
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
528
Machinists Lodge 1743 (J. A. Jones Construction), 135
NLRB 1402 (1962).
The following factors are relevant in making the deter-
mination of this dispute.
1. Certification and collective-bargaining agreement
The record does not establish that Local 98 has been
certified by the Board as the collective-bargaining repre-
sentative for the Honeywell installers or for the electri-
cians.6 Nor is there evidence indicating that a Board certi-
fication covers the work in dispute. Accordingly, this fac-
tor favors neither group of employees in determining the
dispute.
Honeywell and Local 98 have an existing collective-
bargaining agreement which expressly covers the classifi-
cation of installers but does not specify what work is cov-
ered. The record contains no collective-bargaining agree-
ments between Local 98 and any of the employers of the
electricians. Therefore, the factor of “collective-
bargaining agreement” slightly favors an award of the
work in dispute to the Honeywell installers.
2. Employer past practice
Honeywell presented evidence, through witness testi-
mony, that for over 20 years, it has consistently assigned
security installation work to its installers. The record es-
tablishes, and Local 98 concedes, that this factor favors an
award of the work in dispute to the Honeywell installers.
3. Employer preference
Honeywell presented evidence that it has historically
performed security installation work using its installers
and that it attempted to do so on the Locust on the Park
project on three occasions. As stated in its brief, and as
inferred from Unit Leader Pagnotti’s testimony, Honey-
well expressed its preference in assigning the disputed
work to its installers. This factor favors an award of the
work in dispute to the Honeywell installers.7
4. Area and industry practice
The record indicates that both Honeywell installers and
electricians represented by Local 98 have performed secu-
rity installation work similar to the work in dispute at vari-
ous jobsites in the Philadelphia area. Accordingly, this
6 Although the Honeywell-Local 98 agreement, which covers the in-
stallers, states that Local 98 is “certified,” it does not define that term.
Further, as argued by Local 98, the record contains no evidence of prior
Board certifications.
7 At the hearing, Honeywell did not expressly address the factor of
employer preference in its case in chief and was precluded from doing
so on rebuttal by the hearing officer. Nevertheless, the record evidence
shows that this factor clearly favors an award of the work in dispute to
the Honeywell installers.
factor does not favor an award of the work in dispute to
either group of employees.8
5. Relative skills
Honeywell witnesses Pagnotti and Klak testified that the
Employer’s installers are trained and experienced in per-
forming all aspects of the security installation work: run-
ning the wiring, mounting the security devices, connecting
wires to the security devices and to the control panel, and
using Honeywell proprietary software to program the con-
trol panel. They further testified that Honeywell installers
also are skilled at modifying placement of wires and de-
vices from locations set forth in blueprints. Although Lo-
cal 98 Business Agent Dershimer testified that Local 98
electricians are skilled at blueprint reading, setting up and
pulling wiring, and terminating devices, Pagnotti stated
that the Local 98 electricians are not skilled at program-
ming the control panel using Honeywell software and,
therefore, they cannot make the security system opera-
tional. This factor favors an award of the work in dispute
to the Honeywell installers.9
6. Economy and efficiency of operations
Pagnotti and Klak testified that Honeywell installers can
install and make operational the entire security system.
Pagnotti further testified that it is most efficient for the
installer to troubleshoot any problems with the security
system in the first 30 days as the installer is most familiar
with how the wire was pulled, the design of the system,
where the devices were placed, and how the system was
programmed. According to Pagnotti, it would take more
time and on-site supervision for Local 98 electricians to
install a Honeywell security system and they would be
unable to complete the process because they cannot make
the system operational. Also, as part of its contract for the
Locust on the Park job, Honeywell performs a final con-
nect test to check out the system for defects. Pagnotti tes-
tified that if defects are found in the first 30 days, Honey-
well installers would normally correct them. However, if
Honeywell used Local 98 electricians to install the system,
Honeywell would then have to supervise the Local 98
electricians while they corrected any defects. Thus, Pag-
notti explained, assigning the work to Local 98 electricians
not only would increase the time it takes to complete the
work but also would increase costs and thereby impose an
economic hardship on Honeywell. The record shows, and
8 In view of this determination, it is unnecessary to rule on the Em-
ployer’s exception to the hearing officer’s ruling limiting testimony
relating to this factor.
9 To the extent that Local 98 argues that the installation work must
be performed by electricians who are licensed to perform the work, the
record is insufficient to establish that the Philadelphia Electrical Code
imposes such a requirement. See generally Electrical Workers Local
581 (National Telephone & Signal Corp.), 223 NLRB 538, 540 (1976).
ELECTRICAL WORKERS LOCAL 98 (HONEYWELL, INC.)
529
Local 98 concedes, that this factor favors an award of the
work in dispute to the Honeywell installers.
CONCLUSIONS
After considering all the relevant factors, we conclude
that Honeywell installers represented by Local 98 are enti-
tled to perform the work in dispute. We reach this conclu-
sion relying on the collective-bargaining agreement, em-
ployer past practice, employer preference, relative skills,
and economy and efficiency of operations.
In making this determination, we are awarding the work
to the Honeywell installers represented by Local 98, not to
that Union or its members. The determination is limited to
the controversy that gave rise to this proceeding.
DETERMINATION OF DISPUTE
The National Labor Relations Board makes the follow-
ing Determination of Dispute.
1. Employee installers of Honeywell Inc., Home &
Building Control represented by the International Brother-
hood of Electrical Workers, Local Union No. 98 are enti-
tled to perform work installing the security system at Lo-
cust on the Park at 232–254 South 24th Street, Philadel-
phia, Pennsylvania.
2. International Brotherhood of Electrical Workers, Lo-
cal Union No. 98 is not entitled by means proscribed by
Section 8(b)(4)(D) of the Act to force Honeywell Inc.,
Home & Building Control to assign the disputed work to
electricians represented by International Brotherhood of
Electrical Workers, Local Union No. 98.
3. Within 14 days from this date, International Brother-
hood of Electrical Workers, Local Union No. 98 shall no-
tify the Regional Director for Region 4 in writing whether
it will refrain from forcing Honeywell Inc., Home &
Building Control, by means proscribed by Section
8(b)(4)(D), to assign the disputed work in a manner incon-
sistent with this determination.