332 NLRB 630
Kohler Mix Specialties
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
630
Kohler Mix Specialties, Inc. and Milk Drivers and
Dairy Employees Local 471, affiliated with the In-
ternational Brotherhood of Teamsters, AFL–
CIO. Case 18–CA–13040
September 29, 2000
ORDER DENYING MOTION FOR SUMMARY
JUDGMENT
BY CHAIRMAN TRUESDALE AND MEMBERS
LIEBMAN
AND HURTGEN
Upon a charge filed by the Milk Drivers and Dairy Em-
ployees Local 471 (the Union), the General Counsel of the
National Labor Relations Board issued a complaint against
Kohler Mix Specialties, the Respondent, alleging that it
had violated Section 8(a)(5) and (1) of the Act. Subse-
quently, the Respondent filed an answer admitting in part
and denying in part the complaint allegations and request-
ing that the complaint be dismissed.
On January 22, 1998, the Respondent filed with the
Board a Motion for Summary Judgment, arguing that the
Board should defer to an arbitrator’s decision in this case
and dismiss the complaint. On January 29, 1998, the
Board issued an order transferring proceedings to the
Board and Notice to Show Cause why the motion should
not be granted. The General Counsel filed an opposition
and brief in opposition to the Respondent’s motion. The
Respondent thereafter filed a reply brief.
The National Labor Relations Board has delegated its
authority in this proceeding to a three-member panel.
Having duly considered the matter, the Board issues the
following
Ruling on Motion for Summary Judgment
The facts drawn from undisputed statements in the
pleadings and briefs are as follows: The Respondent, a
manufacturer of ice cream and ice cream mixes, has rec-
ognized the Union as the exclusive collective-bargaining
representative of its production and delivery employees
since approximately 1950. On November 17, 1993, the
Respondent notified the Union that it intended to discon-
tinue its over-the-road delivery operations on December 3,
1993, and to subcontract that portion of its business. The
Union thereafter filed a grievance and, on March 14, 1994,
filed an unfair labor practice charge alleging that the Re-
spondent had violated Section 8(a)(5) and (1) of the Act by
failing and refusing to bargain over the decision, and the
effects of the decision, to discontinue its over-the-road
operations and to terminate its over-the-road drivers.
On April 20, 1994, the Regional Director administra-
tively deferred proceeding on the charge pending resolu-
tion of voluntary grievance arbitration, in accord with
Dubo Mfg. Corp., 142 NLRB 431 (1963). A hearing was
held before Arbitrator Herbert Fishgold on August 20 and
21 and December 21, 1996. The Union contended before
the arbitrator that the Respondent had violated several
provisions of the parties’ collective-bargaining agreement
that allegedly limited the Respondent’s right to subcon-
tract bargaining unit work. It also contended that the Re-
spondent failed to give notice of rights and obligations
existing under the contract and under the Act. The Re-
spondent countered that the arbitrator’s authority was lim-
ited to interpreting the terms of the collective-bargaining
agreement, and he was therefore not authorized to consider
the merits of the unfair labor practice charge. The Re-
spondent argued further that its actions did not violate any
provision of the agreement and that the grievance must
therefore be denied.
In an award dated April 14, 1997, the arbitrator specifi-
cally declined to resolve any disputes arising under the
Act. He found that these matters must be left to the Board
and that his authority was limited to interpreting the terms
of the collective-bargaining agreement. In doing so, the
arbitrator found that the parties’ collective-bargaining
agreement did not prohibit the Respondent from subcon-
tracting its over-the-road delivery operations. He further
found that the Respondent subcontracted for legitimate
business reasons, did not seek to avoid contractual obliga-
tions, and did not act out of any union animus. Finally, the
arbitrator found that the contract did not impose any obli-
gation on the Respondent to bargain over its decision to
subcontract or to bargain over the effects of its decision.
As a factual matter, however, the arbitrator noted that the
Respondent showed a willingness to engage in effects
bargaining at a meeting with the Union on December 1,
1993, and further, that the Respondent did engage in at
least some aspects of effects bargaining after it discontin-
ued its over-the-road operations.
In Olin Corp., 268 NLRB 573, 574 (1984), the Board
set forth the standards under which it would defer to an
arbitrator’s award consistent with the post arbitral deferral
doctrine of Spielberg Mfg. Co., 112 NLRB 1080 (1955).
The Board held that it would defer where the proceedings
are fair and regular, all parties have agreed to be bound,
the decision of the arbitrator is not clearly repugnant to the
Act, and the arbitrator has adequately considered the un-
fair labor practice issue. The Board stated in Olin that it
would find that an arbitrator has adequately considered the
unfair labor practice issue if (1) the contractual issue is
factually parallel to the unfair labor practice issue and (2)
the arbitrator was presented generally with the facts rele-
vant to resolving the unfair labor practice issue. Having
duly considered the matter, we find that deferral is not
appropriate here because the arbitrator did not adequately
consider the unfair labor practice issue.
332 NLRB No. 61
KOHLER MIX SPECIALTIES
631
The issue before the Board is whether the Respondent,
by failing and refusing to bargain with the Union about its
decision, and the effects of its decision, violated its statu-
tory obligation to bargain set forth in Section 8(d) and
enforceable through Section 8(a)(5). Resolution of this
issue requires a determination of whether the decision is a
mandatory subject of bargaining, whether the Union has
waived a statutory right to bargain about the decision or its
effects, and whether the Respondent has already satisfied
its obligation, if any, to bargain. The issue decided by the
arbitrator, however, was only whether any provision of the
parties’ contract affirmatively prohibited the Respondent’s
unilateral decision to subcontract its over-the-road-
delivery operation. Finding no such prohibition, the arbi-
trator concluded that there had been no breach of contract.
In these circumstances, we agree with the General
Counsel that Armour & Co., 280 NLRB 824 fn. 2 (1986),
is dispositive of the deferral issue. As in this case, the
arbitrator in Armour found that the parties’ contract did
not prohibit a challenged unilateral change by the em-
ployer, but the arbitrator did not consider whether the re-
spondent had fulfilled, or the union had agreed to waive,
any statutory duty to bargain. In declining to defer, the
Board noted that the absence of a “contractual prohibition”
of the employer’s action was “neither conclusive of the
statutory issue . . . nor inconsistent with a finding that the
Respondent had breached its statutory duty to bargain.”
Id. See also Haddon Craftsmen, Inc., 300 NLRB 789, 790
fn. 5 (1990).
Further, we find distinguishable such cases as Southern
California Edison Co., 310 NLRB 1229 (1993), relied on
by the Respondent. In that case, the arbitrator found that
certain contractual provisions affirmatively permitted, i.e.,
specifically afforded management the discretion to imple-
ment, the unilateral change at issue. No party contended
that the arbitrator had not adequately considered the unfair
labor practice issue, and the only issue before the Board
was whether the arbitrator’s decision was “clearly repug-
nant.” See also Dennison National Co., 296 NLRB 169,
170 fn. 6 (1989), where the Board distinguished Armour &
Co. and found that the arbitrator had adequately consid-
ered the unfair labor practice issue inasmuch as he did not
limit himself to the issue of whether the respondent’s uni-
lateral action violated the collective-bargaining agreement,
but also found that the management-rights clause of the
contract granted the respondent the right to act unilaterally.
This cited precedent makes clear that an arbitral deter-
mination that a contract does not prohibit an employer
action is not tantamount to a finding that the parties have
contractually agreed to permit that action. As the Board
noted in Dennison, supra at 170 fn. 6, “an employer can
violate its statutory obligation to bargain without also vio-
lating its collective-bargaining agreement.”
Our dissenting colleague does not expressly quarrel with
this precedent, but argues that, here, certain factual find-
ings by the arbitrator effectively resolved the statutory
issue by implicitly finding that the Respondent’s decision
was not a mandatory subject of bargaining. We disagree.
Although the Board may conclude that an arbitrator has
effectively resolved an unfair labor practice issue even
when the arbitrator has expressly declined to address that
issue,1 this case does not present circumstances in which
the arbitrator may fairly be found to have done so. The
factual findings referred to in the dissent were made by the
arbitrator in addressing the Union’s contention that a com-
bination of contractual provisions implicitly prohibited the
Respondent’s subcontracting action. In addressing this
contention, the arbitrator followed “the general arbitration
rule . . . that management has the right to contract out
work as long as the action is performed in good faith, it
represents a reasonable business decision, it does not result
in a subversion of the labor agreement, and it does not
have the effect of seriously weakening the bargaining unit
or important parts of it.” Arb. Dec. at 11. He found that
the Respondent based its decision to subcontract solely on
legitimate business reasons because the over-the-road
driver operations “did not fit in with the Company’s stra-
tegic goals, the personalized service of the OTR drivers
was no longer necessary and the legal risks, and associated
costs were too high to continue the OTR operations.” Id.
at 12.
In his analysis, the arbitrator did not have to find, nor
did he implicitly find, that the Respondent’s decision did
not involve labor costs, direct or indirect, or any other mat-
ter that was amenable to the bargaining process. See gen-
erally Overnite Transportation, 330 NLRB No. 184
(2000); and Eby-Brown Co., 328 NLRB 514 (1999). In
fact, the testimony of the Respondents’ witnesses clearly
shows that the “associated costs” mentioned by the arbitra-
tor included the labor cost of workmen’s compensation
claims.2 The Board has held that workmen’s compensa-
tion programs are mandatory subjects of bargaining.3 Fur-
thermore, this same testimony manifests a concern for
1 See Dennison, supra at 170, and cases cited there in fn. 4.
2 The excerpted transcript submitted by the Respondent in support of
its Motion for Summary Judgment does not show that it would have
been less expensive in terms of labor costs for the Respondent to con-
tinue its over-the-road operations instead of subcontracting them. The
arbitration record shows that the Respondent conducted a survey indi-
cating that in April 1993, several months before the subcontracting
decision was made, the overall costs of a subcontracting operation
would have been more expensive than the overall costs of continuing
the existing over-the-road program.
3 Jones Dairy Farm, 295 NLRB 113 (1989).
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
632
employee safety, which is undisputedly a subject for man-
datory bargaining.4
On the basis of the evidence presented in support of the
Respondent’s motion, therefore, this case is distinguish-
able from Oklahoma Fixture Co., 314 NLRB 958 (1994),
cited by the dissent. In that case, the sole reason for the
respondent employer’s subcontracting decision was the
need to immunize it from legal liability to customers and
third parties. Thus, the Board found that:
This case presents the unusual situation . . . be-
cause the credited testimony establishes that the deci-
sion to subcontract was based on core entrepreneurial
concerns outside the scope of mandatory bargaining. .
. . “Labor costs,” even in the broad sense of the term
employed by the Board, were not a factor in the deci-
sion. Accepting as we do the credited reasons for the
Respondent’s decision, we find that it involved con-
siderations of corporate strategy fundamental to pres-
ervation of the enterprise. [Id. at 960.]
Here, in contrast, contrary to our dissenting colleague
we cannot conclude based on the available arbitration re-
cord that the arbitrator’s findings are tantamount to a find-
ing that this is also an “unusual situation” where labor
costs were not a factor in the Respondent’s decision or that
the decision was not amenable to collective bargaining.5
Accordingly, we deny the Respondent’s Motion for
Summary Judgment.
ORDER
The Respondent’s Motion for Summary Judgment is
denied, and the proceeding is remanded to the Regional
Director for Region 18 for further appropriate action.
MEMBER HURTGEN, dissenting.
For the reasons set forth below, I conclude that it is ap-
propriate to defer to the arbitrator’s award in accordance
with Olin Corp.1 and Spielberg Mfg. Co.2 Accordingly,
4 E.g., Boland Marine & Mfg. Co., 225 NLRB 824 (1976).
5 With respect to whether the Respondent met its obligation to bar-
gain over the effects of the decision to subcontract, we find that the
arbitrator also did not adequately consider that issue. Although he did
note certain evidence on the issue, he made no dispositive findings on
the issue in light of his conclusion that the contract imposed no effects
bargaining obligation. Under these circumstances, we do not need to
pass on whether a dispositive arbitral finding that the Respondent had
made an effective bargaining offer would be repugnant to the Act. We
likewise do not address our dissenting colleague's view, based in part
on his own prior dissenting opinions, that it would not be repugnant to
the Act to find that the management decision at issue here was not a
mandatory subject of bargaining under the Act. The statutory issues
remain to be resolved in an unfair labor practice hearing before an
administrative law judge.
1 268 NLRB 573 (1984).
2 112 NLRB 1080 (1955).
contrary to my colleagues, I would grant the Respondent’s
Motion for Summary Judgment and dismiss the complaint.
It is well settled that the Board will defer to an arbitra-
tion award where the proceedings appear to have been fair
and regular, all parties have agreed to be bound, the deci-
sion of the arbitrator is not clearly repugnant to the pur-
poses and policies of the Act,3 and the arbitrator has con-
sidered the unfair labor practice issue presented to the
Board. Raytheon Co., 140 NLRB 883, 884–885 (1963).
The Board finds that the last requirement is met where (1)
the contractual issue is factually parallel to the unfair labor
practice issue, and (2) the arbitrator was presented gener-
ally with the facts relevant to resolving the unfair labor
practice. Olin Corp., supra at 574. With respect to the
“repugnancy” standard, the Board has stated: “Differ-
ences, if any, between the contractual and statutory stan-
dards of review are weighed by the Board as part of its
determination under Spielberg standards of whether an
award is clearly repugnant to the Act.” Dennison National
Co., 296 NLRB 169, 170 (1989). Further, it is well estab-
lished that the Board places the burden on the party oppos-
ing deferral to show that these standards have not been
met.
In the instant case, I find that the General Counsel has
failed to meet his burden. In this regard, I note that there
is no claim, nor do my colleagues assert, that the arbitral
proceedings were unfair or irregular or that any party did
not agree to be bound by the arbitrator’s award. Nor has
the General Counsel established that the arbitrator’s deci-
sion was clearly repugnant to the purposes and policies of
the Act. Rather, my colleagues point to certain distinc-
tions between the issue before the arbitrator and the issue
before the Board.
I agree that the contractual issue before the arbitrator is
somewhat different from the statutory issue before the
Board. In the former, the issue is whether the employer’s
action was permitted or prohibited by the contract. In the
latter, the issue is whether the employer’s refusal to bar-
gain was privileged. However, another issue under the
statute is whether the employer’s conduct involved a man-
datory subject of bargaining. I show below that the facts
of this case, as found by the arbitrator, do not support the
General Counsel’s allegation that Respondent’s conduct
involved a mandatory subject of bargaining.4
3 Spielberg Mfg., supra at 1082.
4 To the extent that my colleagues cite case support for the proposi-
tion that deferral is inappropriate because the statutory “waiver” issue
was not effectively resolved by the arbitrator, I find that proposition to
be inapplicable. Cf. Armour & Co., 280 NLRB 824 (1986). Thus, the
basis for my deferral is not that the arbitrator effectively found that the
Union had contractually waived any statutory right it had to bargain
over a mandatory subject, but rather that the decision itself was not a
mandatory subject of bargaining. Similarly, my colleagues say that
KOHLER MIX SPECIALTIES
633
This case involves the Respondent’s decision to discon-
tinue its over-the-road delivery operations, sell the trucks
and trailers that it used in those operations, and subcon-
tract that work.
In First National Maintenance Corp. v. NLRB, 452 U.S.
666, 679 (1981), the Supreme Court set forth the following
test for determining whether certain management deci-
sions are mandatory subjects:
[I]n view of an employer’s need for unencumbered
decision making, bargaining over management deci-
sions that have a substantial impact on the continued
availability of employment should be required only if
the benefit for labor-management relations and the
collective-bargaining process, outweighs the burden
placed on the conduct of the business.
Under this balancing test, bargaining is required only
where the potential benefits of collective bargaining out-
weigh the burdens such bargaining would place on the
Respondent’s conduct of its business. Here, I find that the
arbitrator made express factual findings which establish
that the potential benefits of bargaining would not out-
weigh the burdens of bargaining. In this regard, the
arbitrator found that:
[T]he Employer has shown that the subcontracting in
this case was done for legitimate business reasons.
The evidence in the record overwhelming supports
the Employer’s assertions that it terminated the [over-
the-road] operations because the operations did not fit
in with the Company’s strategic goals, the personal-
ized service of the [over-the-road] drivers was no
longer necessary and the legal risks, and associated
costs were too high to continue the [over-the-road]
operations. The evidence does not support a conclu-
sion that the discontinuance of the operations was
done to avoid the Employer’s contractual responsibili-
ties or that the decision was based on any anti-union
animus.
I recognize that these findings were not made in the
context of ascertaining whether the Respondent’s actions
were in the area of mandatory bargaining. However, as
my colleagues recognize, it makes no difference that the
arbitrator was not addressing a statutory issue. The essen-
tial point is that the arbitrator made fact-findings that are
relevant to the statutory issue. In this case, the arbitrator
made fact-findings that are relevant to the statutory issue
of whether Respondent acted with respect to a mandatory
deferral would be unwarranted if the arbitrator dealt with the issue of
contractual prohibition rather than the issue of statutory permission. In
view of my conclusion as to nonmandatory subject, I do not resolve this
issue.
subject. In this regard, I find this case analogous to Okla-
homa Fixture, 314 NLRB 958 (1994). In that case, the
Board held that an employer was not obligated to bargain
over its decision to subcontract electrical work because the
decision was based on core entrepreneurial concerns.
Thus, in Oklahoma Fixture the Board found no bargaining
obligation because the decision did not turn on labor costs
but was undertaken because of concerns over the Respon-
dent’s legal liability and potential for customer loss in the
event of defective wiring. So too, here, the Respondent’s
decision to get out of the business of over-the-road trans-
port of its product was because this transport did not fit in
its strategic goals, and the legal risks and associated costs
were too high to continue this operation. The decision was
not based on labor costs.6
My colleagues say that “legal risks” and “associated
costs” (terms used by the arbitrator) are references to labor
costs. I disagree. In context, I think it far from clear that
these ambiguous phrases refer to labor costs. And, it is the
General Counsel who has the burden of proof in this re-
spect. In any event, even if this is the reference, that does
not mean that the decision was a mandatory subject. More
particularly, the test is not whether labor costs played any
role in the decision, but whether the decision turned on
labor costs. Clearly, it did not. Indeed, the Respondent
made its decision knowing that to do so would raise rather
than lower its operating costs. Further, although workers
compensation was one of the elements on which the Re-
spondent relied, this was only a part of the larger matter of
legal liabilities and costs attendant to an over-the-road
operation which the Respondent no longer wanted to bear.
Thus, with the increase in its transport operations came an
increase in accidents, damage to equipment and product,
and driver injury, as well as the concern that an accident
would result in a significant liability to others. The Re-
spondent concluded that it did not want to run that level of
risk or take on that type of liability. This is precisely a
type of “legal liability” which, in Oklahoma Fixture, the
Board found did not impose a bargaining obligation on an
employer.
Finally, although my colleagues correctly note that
workers compensation is a mandatory subject of bargain-
ing, they overstate the implications of that fact when infer-
ring that the “labor costs of workmen’s compensations
claims” were significant enough to require bargaining over
the Respondent’s decision. In this regard, the actual con-
tribution levels, benefits and coverage are set by state law.
While there are ancillary issues over which parties must
6 Indeed, uncontradicted evidence at the arbitration hearing estab-
lished that it would have been substantially less expensive, in terms of
labor costs, for the Respondent to continue its over-the-road operations
instead of contracting them out.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
634
bargain—such as supplemental workers compensation
coverage or employer requirements that employees receiv-
ing compensation work light-duty jobs—the core liabili-
ties and costs are set by state law and are not “labor costs”
over which the parties must bargain.
In sum, workers compensation was, at most, only a part
of the phrases “legal risks” and “associated costs,” and
these phrases themselves are only a part of the factors that
motivated Respondent’s decision.
Accordingly, as the arbitrator’s factual findings estab-
lish that the Respondent’s decision was based on reasons
other than labor costs, and as I defer to those findings, I
conclude that the decision was not a mandatory subject.
Finally, contrary to my colleagues, I conclude that the
arbitrator’s factual findings also resolve the statutory issue
of whether the Respondent violated Section 8(a)(5) by
failing to engage in effects bargaining. Thus, the arbitrator
found, as a factual matter, that the Respondent was willing
to engage in such discussions, yet the Union chose not to
respond.
Specifically, the arbitrator held that:
[R]egardless of any contractual responsibility, the
Employer did show a willingness to engage in such
discussions at a time when the discussions could have
been fruitful. At the December meeting, [Vice Presi-
dent of Operations] Bob Banken asked, “What else do
we have to do?” The Union chose not to respond,
based on their decision that the meeting was not a ne-
gotiating session. That decision was made by the Un-
ion. There is no indication that the Company would
have refused to negotiate effects. To the contrary,
Banken’s raising the question at the December 1
meeting indicated an apparent willingness to discuss
the matter. Moreover, at a later point the Company
and the Union did engage in at least some aspects of
effects bargaining when they met with the Federal
mediator. There is no reason to believe that these dis-
cussions could not have been held earlier, either at the
December 1 meeting or shortly thereafter, but for the
Union’s reluctance to discuss the matter.
Therefore, the arbitrator also made factual findings, which
resolve the effects bargaining allegation.
Accordingly, based on the foregoing factual findings by
the arbitrator, which resolve the statutory 8(a)(5) allega-
tions, I would grant the Respondent’s motion and dismiss
the complaint.