338 NLRB 507
Operating Engineers Local 542 (Caldwell Tanks, Inc.)
OPERATING ENGINEERS LOCAL 542 (CALDWELL TANKS, INC.)
507
International Union of Operating Engineers, Local
542, AFL–CIO and Caldwell Tanks, Inc. and In-
ternational Brotherhood of Boilermakers, Iron
Shipbuilders, Blacksmiths, Forgers and Helpers,
AFL–CIO. Cases 4–CD–1085 and 4–CD–1089
November 15, 2002
DECISION AND DETERMINATION OF DISPUTE
BY MEMBERS LIEBMAN, COWEN, AND BARTLETT
This is a work jurisdiction dispute proceeding under
Section 10(k) of the Act. A charge was first filed on
April 25, 2002,1 by Caldwell Tanks, Inc. (Caldwell or the
Employer). The charge alleged that beginning about
April 24, the Respondent, International Union of Operat-
ing Engineers, Local 542, AFL–CIO (Local 542), vio-
lated Section 8(b)(4)(D) of the National Labor Relations
Act by engaging in proscribed activity with an object of
forcing the Employer to assign certain work to individu-
als Local 542 represents rather than to employees repre-
sented by the International Brotherhood of Boilermakers,
Iron Shipbuilders, Blacksmiths, Forgers and Helpers,
AFL–CIO (Boilermakers). A second charge was filed by
the Employer on May 30, alleging that the Respondent
had engaged in the same proscribed activity about May
30. The cases were consolidated on June 7, and on June
26, a hearing was held before Hearing Officer Kimberly
B. Nerenberg.
The National Labor Relations Board affirms the hear-
ing officer’s rulings, finding them free from prejudicial
error. On the entire record, the Board makes the follow-
ing findings.
I. JURISDICTION
The Employer, a Kentucky corporation, with offices in
Louisville, Kentucky, and an auxiliary production facility
in Newnan, Georgia, designs, manufactures, assembles,
and installs water tanks throughout the United States and
Canada. Within the 12 months preceding the hearing,
which is a representative period, the Employer has per-
formed services directly for customers outside the State
of Kentucky valued in excess of $50,000. Accordingly,
we find that the Employer is engaged in commerce
within the meaning of Section 2(2), (6), and (7) of the
Act. We further find, based upon the stipulation of the
parties, that Local 542 and the Boilermakers are labor
organizations within the meaning of Section 2(5) of the
Act.
1 All dates are in 2002.
II. THE DISPUTE
A. Background and Facts of Dispute
Caldwell’s president, Bernard Fineman, testified that
at its Louisville and Newnan design and manufacturing
facilities, Caldwell employs approximately 200 employ-
ees, about 130 of whom are production employees.
Caldwell also employs about 150 field tank employees
who assemble and install water tanks at the location
where the tanks are used. At the time of the dispute, all
Caldwell field tank employees who assembled and in-
stalled water tanks were represented by the Boilermak-
ers, pursuant to the “National Transient Lodge” collec-
tive-bargaining agreement between the Boilermakers and
Caldwell.
Assembly and installation of an elevated water tank
typically requires a crew of six Caldwell employees.
Two employees of a crew, usually the most experienced,
have the necessary certifications and are assigned to op-
erate the heavy equipment, including a rough terrain
picker (which is a small crane that moves the tank com-
ponents around the site), an electric generator, welding
equipment, a three drum hoist, and a construction der-
rick.
On the tank erection project at issue, for the Milford
Township Water Authority in Spinnerstown, Pennsyl-
vania, the two crew members certified to operate the
heavy equipment were employees Roy Davis and Donnie
Barker, who were represented by the Boilermakers.
Early on April 24, Local 542’s organizer, Frank Bankard,
and seven or eight other individuals picketed and blocked
access to the project site. According to Davis and
Barker, who witnessed the picketing, Bankard and the
other picketers repeatedly shouted at Caldwell employees
not to take the picketers’ work and jobs. The picketers’
signs, however, accused Caldwell of violating area stan-
dards.
Later on April 24, Fineman called Bankard to deter-
mine the reason for the pickets. Bankard told Fineman
that the picketing was “for area standards,” but refused to
elaborate further when Fineman asked what Bankard
meant. Instead, Bankard stated that he wanted Caldwell
to hire a member of Local 542 to operate the hoist, the
rough terrain picker, the welding machines, and/or the
generator. Bankard also wanted Caldwell to sign the
Local 542 “tank agreement,” which set forth the manning
requirements for operation of heavy equipment in Local
542’s jurisdiction and required that employees perform
338 NLRB No. 61
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
508
ing the work be represented by Local 542. The agree-
ment would bind the parties for a year to 18 months.
Fineman responded that he had a collective-bargaining
agreement with the Boilermakers, that he had a right to
assign heavy equipment work to employees represented
by the Boilermakers, and that Local 542’s picketing was
for an improper jurisdictional purpose. Fineman added,
however, that to get his employees back to work, he
would consider hiring one operating engineer and sign-
ing a “project agreement,” but would not sign the longer
“tank agreement.”2 Bankard replied that if Caldwell
would only agree to a “project agreement,” Caldwell
would have to hire two operating engineers to perform
the heavy equipment work. Fineman replied that he
would not do that.
On April 25, Bankard and others continued picketing
and blocking access to the Caldwell project. Fineman
called Charles Priscopo, assistant business manager of
Local 542. Priscopo gave Fineman three options to end
the picketing, all of which required that Caldwell imme-
diately employ one or more members of Local 542 to
operate the heavy equipment and at some time enter into
the “tank agreement.” Fineman would not agree to any
of the three options. Later on April 25, Caldwell filed
the first unfair labor practice charge in this case.
On May 3, the Regional Director filed a petition for an
injunction against Local 542 in Federal district court,
pursuant to Section 10(l) of the Act. On May 9, the dis-
trict court approved an order in which Local 542 stipu-
lated that it would refrain from jurisdictional picketing of
Caldwell, without admitting that it had done so, pending
the Board’s resolution of the unfair labor practice charge.
About that time, the picketing at the worksite ceased. On
May 13, counsel for Local 542 sent a letter to Caldwell
disclaiming any interest in the heavy equipment work.
On May 29, Caldwell received a letter on Local 542
letterhead dated May 28 and signed by Bankard. The
letter set forth area standards for crew size and wage
rates in the operation of a construction derrick, stated that
Local 542 had reason to believe that Caldwell was in
violation of these standards, and stated that if Caldwell
did not respond within 24 hours or comply with these
standards, Local 542 would publicize this information
through picketing.
The next day, May 30, Bankard and other individuals
picketed at the Caldwell project. According to Davis and
Barker, Bankard and other picketers attempted to block
2 In about 1 percent of its tank erection projects, Caldwell, and a lo-
cal union of the International Union of Operating Engineers entered
into a “project agreement,” applicable only for the duration of the pro-
ject, pursuant to which Caldwell hired one individual represented by
that local union to operate the heavy equipment on the project.
access to the site as they had during the April picketing.
In addition, Bankard acted as if his foot had been run
over by Barker’s automobile and lay down in its path.
Other picketers broke Barker’s automobile mirror and
spit in the face of another employee. Further, as in the
April picketing, the picketers’ signs claimed that Cald-
well was violating area standards, but Bankard and the
other picketers repeatedly shouted at the Caldwell em-
ployees not to take the picketers’ work and jobs.
Later on May 30, Fineman telephoned Bankard about
the picketing, but Bankard would not discuss it and re-
ferred Fineman to the attorney for Local 542. The pick-
eting continued at least 2 more days.
On June 4, the district judge issued an Order to Show
Cause why an injunction should not issue against Local
542. On June 10, Local 542 entered into a Consent De-
cree agreeing not to engage in jurisdictional picketing of
Caldwell, without admitting that it had previously done
so.
B. The Work in Dispute
The work in dispute is the operation of heavy equip-
ment for Caldwell Tanks, Inc. at the Milford Township
Water Authority jobsite in Spinnerstown, Pennsylvania.
C. Contentions of the Parties
The Employer argues that there is reasonable cause to
believe that Section 8(b)(4)(D) has been violated, based
on the telephone statements of Local 542’s Bankard and
Priscopo to Fineman, the picketing beginning on April
24 and resuming on May 30, and the picketers’ state-
ments on both occasions. The Employer further con-
tends that, assuming arguendo that one object of the
picketing was to protest area standards, the picketing also
had a proscribed object of forcing Caldwell to assign the
disputed work to employees represented by Local 542.
The Employer further maintains that there are compet-
ing claims to the disputed work. The disputed work had
been assigned to and claimed by Caldwell’s employees
represented by the Boilermakers, pursuant to a collec-
tive-bargaining agreement between Caldwell and the
Boilermakers. Local 542’s competing claim to the heavy
equipment work was made manifest by organizer Bank-
ard’s telephone conversation with Fineman on April 24,
by Assistant Business Manager Priscopo’s similar April
25 telephone conversation with Fineman, and by the
picketers’ statements and conduct on April 24 and again
on May 30. The Employer additionally contends that
Local 542 has not shown that its May 13 letter consti-
tuted a clear, unequivocal, and unqualified disclaimer of
all interest in the disputed work because after the letter,
Local 542 continued to claim the disputed work in a vir-
tually identical manner as it had before the letter.
OPERATING ENGINEERS LOCAL 542 (CALDWELL TANKS, INC.)
509
As to the merits of the dispute, the Employer contends
that the disputed work should be assigned to employees
represented by the Boilermakers rather than to employees
represented by Local 542. The Employer relies on the
collective-bargaining agreement between the Employer
and the Boilermakers, the Employer’s preference, the
current assignment, the past practice, the greater relative
skills of the employees represented by the Boilermakers,
and the economy and efficiency of the Employer’s opera-
tions.
Local 542 contends that it does not have any interest in
the disputed work and disclaimed any such interest in its
May 13 letter to Caldwell. It further maintains that
Fineman’s testimony regarding the statements of the
May 30 picketers was hearsay and should have been ex-
cluded from the record.3
D. Applicability of the Statute
It is well settled that the standard in a 10(k) proceeding
is whether there is reasonable cause to believe that Sec-
tion 8(b)(4)(D) of the Act has been violated. This stan-
dard requires finding that there is reasonable cause to
believe that a party has used proscribed means to enforce
its claim to the work in dispute, that there are competing
claims to the disputed work between rival groups of em-
ployees, and that no method of voluntary adjustment of
the dispute has been agreed upon by all the parties.
These three prerequisites have been met in this case.
First, Local 542’s organizer, Bankard, participated in
the picketing of the Employer beginning on April 24,
shouting at Caldwell employees that they were taking the
picketers’ work and jobs.4 Further, both Bankard and
Local 542’s assistant business manager, Priscopo, in-
formed Fineman that in order for the picketing to stop,
Caldwell would have to hire one or two members of Lo-
cal 542 to perform the disputed work. In addition, Bank-
ard participated in the picketing of the Respondent on
May 30 and again claimed that Caldwell employees were
taking the picketers’ work and jobs.5 Thus, even assum-
3 Local 542 made these arguments at the hearing, but did not submit
a brief to the Board. The Boilermakers appeared at the hearing, but
presented no argument and did not file a brief with the Board.
4 We find, and Local 542 does not dispute, that Bankard is an agent
of Local 542. Thus, the record shows that at the hearing he was identi-
fied as an organizer for Local 542 and that he signed the May 28 letter
to Caldwell that was on Local 542 letterhead and that asserted Local
542’s position.
5 Fineman did not witness the May 30 picketing, but testified that his
safety director, Mike Marrs, who did witness it, provided him an oral
business report that the picketers told Caldwell employees not to take
the picketers’ jobs and work. The hearing officer admitted that testi-
mony of Fineman for the truth of the matter asserted under the business
records exception to the hearsay rule. Local 542 contends that Fine-
man’s testimony did not fall within the business records exception and
was therefore improperly admitted as evidence.
ing that an object of Local 542’s picketing was to protest
the Employer’s alleged failure to adhere to area stan-
dards, “the evidence reasonably establishes that at least
another object of the picketing was to force the Employer
to assign the disputed work to employees represented by
the Respondent.” Longshoremen ILA Local 3033
(Coastal Cargo Co.), 323 NLRB 570, 572 (1997). Ac-
cordingly, we find that there is reasonable cause to be-
lieve that Local 542 has used proscribed means to en-
force a claim to the work in dispute.
Second, we find that Boilermakers-represented em-
ployees also claim the work in dispute. The Board has
“long held that a group of employees performing work is
evidence of their claim to that work, even absent an ex-
plicit claim.” Longshoremen ILWU Local 14 (Sierra
Pacific Industries), 314 NLRB 834, 836 (1994), affd. 85
F.3d 646, 652 (D.C. Cir. 1996) (citing Operating Engi-
neers Local 926 (Georgia World), 254 NLRB 994, 996
(1981)). Here, employees represented by the Boilermak-
ers have been operating the heavy equipment from the
project’s inception. Accordingly, we find that there are
competing claims to the disputed work.
Local 542 contends, however, that it disclaimed any
interest in the disputed work in its May 13 letter to
Caldwell. The party alleging such a disclaimer has the
burden to show “a clear, unequivocal, and unqualified
disclaimer of all interest in the work in dispute.” Team-
sters Local 600 (Central Hardware), 290 NLRB 612,
613 (1988) (quoting Operating Engineers Local 77 (C. J.
Coakley Co.), 257 NLRB 436, 438–439 (1981)). We
find that Local 542 has failed to meet that burden here.
As discussed above, on May 30, after the purported
May 13 disclaimer, Local 542 picketed the jobsite, and
the evidence reasonably establishes that an object of that
picketing was to force the Employer to reassign the dis-
puted work to employees Local 542 represents. Thus,
because Local 542 subsequently engaged in conduct that
was inconsistent with its purported disclaimer, we find
that Local 542 has failed to establish a clear, unequivo-
cal, and unqualified disclaimer of all interest in the dis-
puted work. See Plumbers Local 123 (Florida Mainte-
We need not rely on the hearsay testimony of Fineman, however,
because Caldwell employees Roy Davis and Donnie Barker witnessed
the May 30 picketing and testified that Bankard shouted that Caldwell
employees were taking work and jobs from the picketers.
In any event, hearsay evidence is admissible in a 10(k) proceeding
where it is probative and corroborative of other evidence. See Operat-
ing Engineers Local 12 (Winegardner Masonry), 331 NLRB 1669,
1671 fn. 3 (2000). We find that Fineman’s hearsay testimony about the
statements of the May 30 picketers is admissible because it is probative
and corroborates the testimony of Davis and Barker. Under these cir-
cumstances, we find it unnecessary to reach the issue of whether Fine-
man’s testimony is also admissible under the business records excep-
tion to the hearsay rule.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
510
nance & Construction), 338 NLRB 429, 431 (2002)
(finding that after the respondent’s purported disclaimer
of the disputed work for individuals it represented, its
assistant business manager renewed the claim by stating
that an employee represented by the other union was
doing the respondent’s work and that the other union was
taking the respondent’s work).
Third, the parties have stipulated, and we find, that
there is no agreed-upon method of voluntary adjustment
of the work dispute that would bind all the parties. Ac-
cordingly, we conclude that we may appropriately de-
termine the merits of this dispute.
E. Merits of the Dispute
Section 10(k) requires the Board to make an affirma-
tive award of disputed work after considering various
factors. NLRB v. Electrical Workers Local 1212 (Co-
lumbia Broadcasting), 364 U.S. 573 (1961). The Board
has held that its determination in a jurisdictional dispute
is an act of judgment based on common sense and ex-
perience, reached by balancing the factors involved in a
particular case. Machinists Lodge 1743 (J. A. Jones
Construction Co.), 135 NLRB 1402, 1410–1411 (1962);
Asplundh Construction Corp., 318 NLRB 633, 634
(1995).
The following factors are relevant in determining this
dispute.
1. Certifications and collective-bargaining agreements
There is no evidence of any Board certifications con-
cerning the employees involved in this dispute. Accord-
ingly, we find that the factor of certifications does not
favor an award of the disputed work to employees repre-
sented by either union.
The parties have stipulated, and we find, that the Em-
ployer is not party to a collective-bargaining agreement
with Local 542. However, the Employer is party to the
“National Transient Lodge” collective-bargaining agree-
ment with the Boilermakers. In addition, for about the
past 6 years, the Boilermakers and the Employer have
signed and been bound by an “Interpretation/Under-
standing” of that collective-bargaining agreement that
provides as follows:
[O]n certain task erection work, Boilermakers may op-
erate, man, and maintain any equipment used by the
Boilermakers and assigned to them by the Contractor.
These may include but not be limited to tuggers, power
hoists, welding machines, compressors, pumps, cranes
less than 20 ton capacity, and other similar type equip-
ment.
It is uncontested that the Employer is a “Contractor”
and has assigned to employees represented by the Boil-
ermakers the disputed heavy equipment work, which
includes operation of “power hoists,” “welding ma-
chines,” “cranes less than 20 ton capacity,” and other
“similar type equipment.” Accordingly, the factor of
collective-bargaining agreements favors an award of the
disputed work to employees represented by the Boiler-
makers.
2. Employer preference, current assignment,
and past practice
The Employer prefers that the disputed work be as-
signed to employees represented by the Boilermakers.
The Employer currently assigns the disputed work to
employees represented by the Boilermakers. Further, the
Employer’s practice of water tank erection for at least the
last 16 years has been to assign the heavy equipment
operation to employees represented by the Boilermakers.
Accordingly, these factors favor awarding the work in
dispute to employees represented by the Boilermakers.
3. Area and industry practice
No party has introduced evidence regarding this factor.
Accordingly, we find that area and industry practice does
not favor an award of the disputed work to employees
represented by either union.
4. Relative skills
There is no evidence in the record that individuals rep-
resented by Local 542 possess the necessary skills to
operate the heavy equipment in dispute. In contrast, the
record shows that employees represented by the Boiler-
makers have received both a nationally recognized train-
ing certification in heavy equipment operation and the
Employer’s educational program related to safety proce-
dures. In addition, the record shows that employees rep-
resented by the Boilermakers have substantial experience
with the particular heavy equipment of this Employer,
the characteristics of the large component parts of the
water tanks, and this Employer’s particular tank erection
techniques, practices, and procedures. In these circum-
stances, we find that the factor of relative skills favors an
award of the disputed work to employees represented by
the Boilermakers.
5. Economy and efficiency of operations
The record indicates that performance of the disputed
work is not routinely required for the entirety of an 8-
hour workday. Consequently, the employees represented
by the Boilermakers have performed other work on the
project as well, including welding, fitting, raising, hang-
ing, assembling, and installing the steel water tank com-
ponents. In contrast, the record indicates that individuals
represented by Local 542 are seeking only to perform the
discrete work of operating certain pieces of heavy
equipment on the project. Thus, assigning the disputed
OPERATING ENGINEERS LOCAL 542 (CALDWELL TANKS, INC.)
511
work to employees represented by the Boilermakers
would result in greater efficiency and productivity and
less idle time and job costs than assigning the disputed
work to individuals represented by Local 542. We there-
fore find that the factor of economy and efficiency of
operations favors awarding the disputed work to employ-
ees represented by the Boilermakers.
CONCLUSIONS
After considering all the relevant factors, we conclude
that Caldwell employees represented by the Boilermak-
ers are entitled to perform the work in dispute. We reach
this conclusion relying on the factors of collective-
bargaining agreements, employer preference, current
assignment, past practice, relative skills, and economy
and efficiency of operations. In making this determina-
tion, we are awarding the disputed work to employees
represented by the International Brotherhood of Boiler-
makers, Iron Shipbuilders, Blacksmiths, Forgers and
Helpers, AFL–CIO, not to that Union or its members.
The determination is limited to the controversy that gave
rise to this proceeding.
DETERMINATION OF DISPUTE
The National Labor Relations Board makes the follow-
ing Determination of Dispute.
1. Employees of Caldwell Tanks, Inc. represented by
the International Brotherhood of Boilermakers, Iron
Shipbuilders, Blacksmiths, Forgers and Helpers, AFL–
CIO are entitled to perform the operation of heavy
equipment for Caldwell Tanks, Inc. at the Milford Town-
ship Water Authority jobsite in Spinnerstown, Pennsyl-
vania.
2. International Union of Operating Engineers, Local
542, AFL–CIO is not entitled by means proscribed by
Section 8(b)(4)(D) of the Act to force Caldwell Tanks,
Inc. to assign the disputed work to employees repre-
sented by it.
3. Within 14 days from this date, International Union
of Operating Engineers, Local 542, AFL–CIO shall no-
tify the Regional Director for Region 4 in writing
whether it will refrain from forcing Caldwell Tanks, Inc.,
by means proscribed by Section 8(b)(4)(D), to assign the
disputed work to employees represented by it rather than
to employees represented by the International Brother-
hood of Boilermakers, Iron Shipbuilders, Blacksmiths,
Forgers and Helpers, AFL–CIO.