340 NLRB 1
Arrow Line, Inc./Coach USA
ARROW LINE, INC./COACH USA
1
The Arrow Line, Inc./Coach USA and the Amalga-
mated Transit Union Local 1342. Case. 34–CA–
9388
August 21, 2003
DECISION AND ORDER
BY MEMBERS SCHAUMBER, WALSH, AND
ACOSTA
On June 14, 2001, Administrative Law Judge Michael
A. Marcionese issued the attached decision. The General
Counsel filed exceptions and a supporting brief, and the
Respondent filed an answering brief.
The National Labor Relations Board has delegated its
authority in this proceeding to a three-member panel.
The Board has considered the decision and record in
light of the exceptions and briefs, and has decided to
affirm the judge’s rulings, findings, and conclusions and
to adopt the recommended Order.
The complaint alleges that the Arrow Line, Inc. (the
Respondent) failed to properly calculate vacation pay for
its mechanics and cleaners under its 1999 collective-
bargaining agreement and that this failure constitutes a
midterm modification in violation of Sections 8(a)(5) and
(1) and 8(d). In adopting the judge’s dismissal of the
complaint under Section 10(b), we find the following
facts to be particularly significant. The Respondent has
paid its nondriver employees (i.e., mechanics and clean-
ers) vacation pay on the basis of 40 hours per week since
1989 when the Respondent acquired the company from
another bus line. Although the parties’ 1996 agreement
increased vacation pay from 40 to 50 hours, the Respon-
dent viewed the increase as applicable only to drivers,
who generally worked 10 more hours a week than Re-
spondent’s nondriver employees. Accordingly, during the
term of the 1996 agreement, the Respondent adhered to
its longstanding practice of calculating vacation benefits
for its mechanics and cleaners on the basis of a 40-hour
week. The Respondent continued to adhere to this prac-
tice under its 1999 agreement, which also called for pay-
ing vacation benefits on the basis of a 50-hour week. No
employee or union representative complained about this
practice during the term of the 1996 agreement or ad-
dressed it in any way during negotiation of the 1999
agreement. Moreover, the local union president received
vacation pay on the basis of 40 hours per week through-
out the period covered by the 1996 and 1999 agreements.
Under these circumstances, the Union had clear and un-
equivocal notice of the Respondent’s vacation pay prac-
tice long before February 23, 2000, the beginning of the
applicable Section 10(b) period.
We agree with the judge that this case is akin to Conti-
nental Oil Co., 194 NLRB 126 (1971).1 In that case, the
employer implemented a method of allocating overtime,
which allegedly violated its collective-bargaining agree-
ment, more than 6 months before the filing of the charge.
The employer continued to follow this same method dur-
ing the 10(b) period. The Board found that the em-
ployer’s mere adherence to its method of allocating over-
time established outside the 10(b) period could not con-
stitute a midterm modification within the 10(b) period.
The Board therefore dismissed the complaint as time-
barred. Similarly, here, the Respondent’s conduct during
the 10(b) period was identical to its decade-long practice.
There is no allegation of a new change in the Respon-
dent’s method of calculating vacation pay during the
relevant 10(b) period.2 Therefore, the complaint is time-
barred under Section 10(b).
1 We respectfully find our dissenting colleague’s attempt to distin-
guish Continental Oil Co. on the basis that the complaint in that case
alleged a “change in method” of allocating overtime, rather than “sepa-
rate and distinct allegedly unlawful individual assignments of over-
time” to be unavailing. To the contrary, in that case the General Coun-
sel argued that the complaint was not barred under Sec. 10(b) because
the employer applied its interpretation of the contract during the 6
months prior to the filing of the charge. The Board disagreed and
adopted the administrative law judge’s finding that:
[t]he application of the Company’s view is not in itself a
“change.” In order to establish a “change”, the General Counsel
would have to go back to 1964, long before the period permissible
under Section 10(b). Whether or not Respondent’s method of al-
locating overtime violates the terms of the contract, it is clear that
Respondent has not changed its method of doing so since No-
vember 20, 1968, the beginning of the Section 10(b) period.
Id. at 129. Accordingly, the Board explicitly found that “[t]o the extent
that any of the actions taken by Respondent within 6 months of the
filing of the charge could be construed as a new or independent act,
there has not been shown such a departure from the established method
of allocating overtime as would constitute unilateral action which vio-
lates Section 8(a)(5).” Id. at 126. In other words, it is the alleged
change itself that constitutes the violation. Thus, merely adhering to a
method of calculating vacation pay established outside the 10(b) period
does not constitute an actionable unilateral change.
In the present case, it likewise is the alleged change in the Respon-
dent’s method of calculating vacation pay that originally may have
given rise to an unfair labor practice. That change, however, took place
outside the relevant Sec. 10(b) period. Here, as in Continental Oil, no
change took place after that one act. As our dissenting colleague con-
cedes, the act of inadvertently leaving the vacation benefits out of the
contract took place far before the relevant statutory limit. The Respon-
dent’s continued application of this method for payment of vacation
pay does not give rise to a continuing violation here, just like the analo-
gous situation did not give rise to a continuing violation in Continental
Oil. Our dissenting colleague’s reliance on Farmingdale Iron Works,
249 NLRB 98 (1980), does not change this.
2 See also Park Inn Home for Adults, 293 NLRB 1082 (1989) (hold-
ing that Sec. 10(b) barred a finding that an employer violated the Act
by failing to make contributions to benefit funds where the charge was
filed more than 6 months after the expiration of the applicable collec-
tive-bargaining agreement that initially created the allegedly breached
340 NLRB No. 5
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
2
ORDER
The National Labor Relations Board adopts the rec-
ommended Order of the administrative law judge, and
the complaint is dismissed.
MEMBER WALSH, dissenting.
The Respondent has continuously failed to pay its me-
chanics and cleaners their full contractual vacation pay
since 1996. The complaint alleges that this failure since
on or about February 15, 2000, has been without the Un-
ion’s consent and that it constitutes a midterm modifica-
tion of the collective-bargaining agreement in violation
of Sections 8(a)(5) and (1) and 8(d) of the Act.1 The
complaint is not time-barred under Section 10(b) of the
Act.2 Thus, my colleagues have erred in dismissing the
complaint on 10(b) grounds.
I. FACTS
The parties have had successive collective-bargaining
agreements since 1989, covering all full-time busdrivers
(drivers), mechanics, and washers (cleaners). (The current
agreement is for January 19, 1999, through January 18,
2004.) Until January 1996, the agreements provided that
the Respondent would pay all unit employees 40 hours’
pay for each week of their vacation. In the 1996 collec-
tive-bargaining agreement, the parties negotiated an in-
crease in the weekly amount of vacation pay, from 40
hours to 50 hours. Thus, starting in January 1996 and con-
tinuing to the present, the collective-bargaining agree-
ments have provided that the Respondent would pay “all
employees covered by this agreement” (without reference
to specific job classification) 50 hours’ pay for each week
of their vacation. In practice, however, the Respondent
continued to pay its mechanics and cleaners only 40 hours’
pay per week of vacation, while paying its drivers the con-
tractually specified 50 hours’ pay. Local Union President
Holiner Miliner was one of the cleaners who received only
40 hours’ pay for vacation during this time.
obligation and more than 6 months after the union learned of the em-
ployer’s action).
1 Under Sec. 8(d) of the Act, no party to a collective-bargaining
agreement can be compelled to discuss or agree to a midterm modifica-
tion of a collective-bargaining agreement, and, accordingly, a proposed
modification can be implemented only if the other party’s consent is
first obtained. Abbey Medical/Abbey Rents, 264 NLRB 969 fn. 1
(1982), enfd. mem. 709 F.2d 1514 (9th Cir. 1983).
2 Sec. 10(b) of the Act provides in pertinent part that “no complaint
shall issue based upon any unfair labor practice occurring more than six
months prior to the filing of the charge with the Board and the service
of a copy thereof upon the person against whom such charge is
made.”
The charge was filed on August 11, 2000. The judge found that a
copy of the charge was served on the Respondent by fax and regular
mail on August 22, 2001, and there are no exceptions to that finding.
Nobody, however, complained about the Respondent’s
failure to pay the mechanics and cleaners the contractu-
ally specified 50 hours’ pay for vacation until June 16,
2000,3 when cleaner Jose Rodriquez, who had recently
read the collective-bargaining agreement, complained to
the Respondent that he had received only 40 hours in-
stead of 50 hours of vacation pay for his recently com-
pleted 1-week vacation. Rather than pay Rodriquez the
additional 10 hours of vacation pay called for in the col-
lective-bargaining agreement, the Respondent instead
sent notices dated June 19 to all mechanics and cleaners,
with a copy to the Union, stating:
Upon reviewing the Union Contract we have no-
ticed that the section for VACATION BENEFITS
HAS BEEN INADVERTENTLY LEFT OUT OF THE
CONTRACT.[4] We apologize for any inconvenience
this may have caused. VACATION benefits for me-
chanics and cleaners is [sic.] as follows: [40 hours of
pay per week]. [Emphases in original.]
The Union filed the instant unfair labor practice charge
on August 11. The complaint issued on October 25. The
complaint alleges in pertinent part that since on or about
February 15 the Respondent has failed to continue in
effect the contractual vacation benefit provisions, by uni-
laterally changing vacation benefits for the mechanics
and cleaners, without obtaining the Union’s consent and
without providing the Union with prior notice and an
opportunity to bargain about the change, in violation of
Sections 8(a)(5) and (1) and 8(d) of the Act.
The Respondent’s answer to the complaint asserts in
pertinent part that the unfair labor practice charge is
time-barred by Section 10(b).5
II. ANALYSIS AND CONCLUSION
The General Counsel has structured the complaint to
comply with the requirements of Section 10(b) by limit-
ing the chronological extent of the alleged unlawful ac-
tivity to only that which occurred since on or about Feb-
ruary 15—i.e., within about 6 months prior to the August
22 service of the charge on the Respondent. Neverthe-
less, the judge has recommended that the complaint be
dismissed on 10(b) grounds, and my colleagues have
erroneously adopted that recommendation.
3 All the following dates are 2000 unless otherwise stated.
4 This was false. Vacation benefits are set out, in full, in art. G3,
VACATIONS, of the 1999–2004 collective-bargaining agreement.
5 The Respondent’s reference to the charge, rather than the com-
plaint, in its 10(b) affirmative defense appears to have been inadvertent.
As seen, Sec. 10(b) may be invoked as an affirmative defense to act as
a bar to the issuance of certain complaints, or particular allegations
within a complaint, but it does not act as a bar to the filing of unfair
labor practice charges themselves.
ARROW LINE, INC./COACH USA
3
For the reasons discussed below, I find that in continu-
ously failing to pay mechanics and cleaners their contrac-
tual 50 hours per week vacation pay, without obtaining
the Union’s consent, the Respondent has effected mid-
term modifications of the collective-bargaining agree-
ment resulting in a series of continuing or recurring sepa-
rate and distinct violations of Sections 8(a)(5) and (1)
and 8(d) of the Act. Litigation of any instances of such
alleged misconduct occurring within the 6-month period
prior to the August 22 service of the charge on the Re-
spondent is not barred by Section 10(b).
A. Governing Principles
The procedural issue before us is primarily controlled
by Farmingdale Iron Works, 249 NLRB 98 (1980), enfd.
mem. 661 F.2d 910 (2d Cir. 1981), and King Manor
Care Center, 308 NLRB 884 (1992). Under Farming-
dale, each failure during the term of an existing collec-
tive-bargaining agreement to pay contractually required
periodic benefit fund payments within the 10(b) period
constitutes a separate and distinct violation of Section
8(a)(5) and (1) of the Act. See Chemung Contracting
Corp., 291 NLRB 773 (1988), citing Farmingdale.
Under King Manor, it is unnecessary to consider when,
if ever, the Union had clear and unequivocal notice that
the Respondent would not abide by its contractual obli-
gation to pay 50 hours’ vacation pay to the mechanics
and cleaners. Where, as here, the charge was filed during
the life of the collective-bargaining agreement, every
failure to pay contractual vacation pay triggers a new
limitations period and a charge is timely filed with re-
spect to any such failure without regard to earlier failures
to pay. Each failure to pay contractual vacation pay con-
stitutes a separate and discrete violation independent of
the evidence that may support earlier violations. Inas-
much as the instant case does not involve an alleged re-
pudiation of the entire agreement but only an unlawful
midterm modification of a particular provision, the con-
tinuing violation doctrine is applicable. Therefore, the
charge filed on August 11 and served on August 22 is
timely with respect to any failures to pay contractual
vacation pay on or after February 22, 6 months prior to
service of the charge. 308 NLRB at 887.6
Like the instant case, Farmingdale involved a charge
filed during the term of an existing collective-bargaining
agreement. It alleged the cessation of contractually re-
6 The instant complaint alleges unlawful conduct beginning on or
about February 15, within 6 months prior to the August 11 filing of the
charge, rather than on or about February 22, within 6 months prior to
the August 22 service of the charge on the Respondent. This is a minor
and insubstantial error not involving a material issue. The Respondent
would not be prejudiced by a finding of a violation a mere 7 days later
than that alleged. King Manor, supra, 308 NLRB at 887.
quired periodic benefit fund payments. Although the
initial failure to make payments occurred more than 6
months before the charge was filed, the Board held that
each failure to make the contractually required monthly
benefit fund payments constituted a separate and distinct
violation of the Respondent’s bargaining obligation.
Because the contract was still running, the Board found
that General Counsel did not need to reach beyond the
10(b) period for evidence to support the charge; the al-
leged separate and distinct contract violations were prov-
able by events occurring within 6 months of the filing of
the charge. While concluding that Section 10(b) pre-
cluded any remedy for the failure to make payments out-
side the 6-month period preceding the charge, the Board
nevertheless concluded that an unfair labor practice find-
ing was not time-barred in its entirety:
The Board previously has considered the applica-
tion of Section 10(b) to the unilateral discontinu-
ance, in the face of a bargaining obligation, of bene-
fits that formerly were granted on a periodic basis.
Thus, the Board has held that each denial of a merit
increase to employees whose evaluations previously
would have entitled them to such an increase consti-
tuted a separate and distinct violation of the Act
which could be remedied upon the filing of a charge
within 6 months after the denial of that particular in-
crease. The Board further has held that the unilateral
decision to discontinue making benefit fund contri-
butions, like the failure to make periodic wage in-
creases, constitutes a violation of Section 8(a)(5) of
the Act. Accordingly, we conclude that each failure
to make the contractually required monthly benefit
fund payments constituted a separate and distinct
violation of Respondent’s bargaining obligation and,
therefore, that any benefit fund payment [within the
10(b) period] is subject to the Board’s remedial pow-
ers. [249 NLRB at 99; footnotes omitted.]
B. Application of Governing Principles
The principles set out in Farmingdale, Chemung, and
King Manor are fully applicable here. The Respondent
has apparently never paid the mechanics and cleaners the
50 hours per week vacation pay expressly owed to them
(all employees) under the express terms of the vacation
provisions of the parties’ collective-bargaining agree-
ments. Each time it failed to do so, it failed to comply
with the terms of the agreement. Each such failure could
be alleged as a separate and distinct violation. The com-
plaint alleges as unlawful, however, essentially only
those failures to abide by the contract during the 6-month
10(b) period prior to the August 22 service of the charge
on the Respondent. Under the above precedents, the
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
4
complaint is therefore not barred by Section 10(b), and
my colleagues have erred in dismissing the complaint on
10(b) grounds.
C. Inapplicable Cases
My colleagues adopt the judge’s reliance on Continen-
tal Oil Co., 194 NLRB 126 (1971), which was decided 9
years before Farmingdale. Continental Oil is inapposite
and any reliance on it in this context is thus misplaced.
The complaint there alleged that the employer violated
Section 8(a)(5) and (1) by unilaterally changing the
method for distributing overtime, despite the terms of an
existing collective-bargaining agreement prescribing the
method for doing so. The Board found that the alleged
unilateral change in method was effectuated more than 6
months prior to the filing of the charge, and that the alle-
gation was therefore barred by Section 10(b). The Board
clearly demonstrated its focus on the allegedly unlawful
change in method for distributing overtime rather than on
separate and distinct allegedly unlawful individual as-
signments of overtime:
To the extent that any of the actions taken by Re-
spondent within 6 months of the filing of the charge
could be construed as a new or independent act,
there has not been shown such a departure from the
established method of allocating overtime as would
constitute unilateral action that violates Section
8(a)(5). [194 NLRB at 126; emphasis supplied.]
Indeed, the Board distinguished Continental Oil in
Farmingdale itself, noting that the employer’s adherence
in Continental Oil to a method of calculating overtime
that was established more than 6 months before the filing
of the complaint did not constitute a unilateral change
within the 10(b) period and (unlike the alleged violations
in Farmingdale) was therefore not a continuing violation
within the 10(b) period. 249 NLRB at 99 fn. 7.
Similarly, the Board expressly found Continental Oil
“distinguishable and not on point” in Abbey Medi-
cal/Abbey Rents, supra, where the Board directly applied
Farmingdale in finding that there was no 10(b) bar to
allegations of failures to make contractually mandated
fringe benefit fund contributions during the 10(b) period.
The Board found, by way of comparison, that the em-
ployer in Continental Oil had “merely adhered to a
method of calculating overtime established more than 6
months before the filing of the charge.” 264 NLRB at
975.
The majority also relies on Park Inn Home for Adults,
293 NLRB 1082 (1989). That case is also fundamentally
inapposite, and reliance on it here is thus misplaced. In
Park Home, the complaint alleged, and the judge found,
that the respondent violated Section 8(a)(5), (3), and (1)
by failing since March 11, 1978 (6 months prior to the
filing of the charge), to make contributions to the union’s
employee benefit funds. In finding these violations, the
judge rejected the respondent’s argument that the allega-
tions were time-barred because it had ceased contributing
to the funds before the 6-month limitations period in Sec-
tion 10(b). The judge relied on Farmingdale, supra, to
find that each failure to make the required payments
within the 10(b) period was a separate actionable viola-
tion.
The Board reversed the judge. It noted that subsequent
to the issuance of the judge’s decision, the Board had
issued Chemung Contracting Corp., supra, in which the
Board considered the application of Farmingdale to
cases like Park Home, involving a charge of a unilateral
change that is filed more than 6 months after expiration
of the applicable collective-bargaining agreement that
initially created the allegedly breached obligation. Che-
mung held that Section 10(b) bars a finding that an em-
ployer has violated the Act by failing to make contribu-
tions after the relevant collective-bargaining agreement
has expired, when the charge is filed more than 6 months
after expiration of the contract and the union had notice
of the failure prior to the 10(b) period. Accordingly,
applying Chemung rather than Farmingdale, the Board
dismissed the allegations in question in Park Home.
Park Home is therefore fundamentally inapposite to
the instant circumstances. Unlike in the instant case,
where the August 11, 2000 unfair labor practice charge
was filed and served on the Respondent during the term
of the 1999–2004 collective-bargaining agreement (thus
invoking the principles of Farmingdale), the September
11, 1978 charge in Park Home was not filed until almost
2 years after the October 31, 1976 expiration of the col-
lective-bargaining agreement (thus invoking the princi-
ples of Chemung).
D. Conclusion
Based on all of the above considerations, I would not
dismiss the complaint on 10(b) grounds.
Darryl Hale, Esq., for the General Counsel.
Peter A. Janus, Esq. (Siegel, O’Connor, Schiff & Zangari,
P.C.), for the Respondent.
DECISION
STATEMENT OF THE CASE
MICHAEL A. MARCIONESE, Administrative Law Judge. I
heard this case in Hartford, Connecticut, on March 8 and 9,
2001. The unfair labor practice charge was filed by the Amal-
gamated Transit Union Local 1342 (the Union) on August 11
and on October 25, 2000, the complaint and notice of hearing
issued. The complaint alleges that the Respondent, the Arrow
Line, Inc./Coach USA (the Respondent), has unilaterally
ARROW LINE, INC./COACH USA
5
changed the vacation benefits of its union-represented mechan-
ics and washers since on or about February 15, 2000.1 This
conduct is alleged to be an unlawful midterm modification of
the collective-bargaining agreement between the Respondent
and the Union, under Sections 8(a)(1) and (5), and 8(d) of the
Act, and a unilateral change, without notice and an opportunity
to bargain, in violation of Section 8(a)(1) and (5). The Respon-
dent filed its answer to the complaint on November 8, denying
the unfair labor practice allegations and raising several affirma-
tive defenses. Specifically, the Respondent asserted that the
complaint was time-barred by Section 10(b) of the Act; that any
alleged unilateral change had been ratified by the Union; that
the Union was estopped from alleging any unilateral change by
its acceptance or acquiescence in the Respondent’s past prac-
tice of calculating vacation benefits; and that the Union waived
any claims it had against the Respondent’s practice of calculat-
ing vacation benefits.
On the entire record, including my observation of the de-
meanor of the witnesses, and after considering the briefs filed
by the General Counsel and the Respondent, I make the follow-
ing
FINDINGS OF FACT
I. JURISDICTION
The Respondent, a corporation with an office and place of
business in Waterford, Connecticut, is engaged in the interstate
and intrastate transportation of passengers. The Respondent
annually derives gross revenues in excess of $50,000 from its
interstate transportation business, and performs services valued
in excess of $50,000 in States other than the State of Connecti-
cut. The Respondent admits and I find that it is an employer
engaged in commerce within the meaning of Section 2(2), (6),
and (7) of the Act and that the Union is a labor organization
within the meaning of Section 2(5) of the Act.
II. ALLEGED UNFAIR LABOR PRACTICES
A. Facts2
The Union has represented a unit of bus drivers, mechanics,
and washers3 at the Waterford facility for many years. When
the Respondent acquired this facility in January 1989 from
Savin Bros. Bus Lines, it recognized the Union and adopted the
existing collective-bargaining agreement with minor changes.
The parties have negotiated a succession of collective-
bargaining agreements over the years since 1989, with the cur-
rent one in effect for the period January 19, 1999, through
January 18, 2004. All of the contracts have contained a provi-
sion for vacation benefits for unit employees. From 1989 until
January 1999, the contracts contained two-tier vacation bene-
fits, one for employees hired before the January 19, 1989 ac-
quisition by the Respondent, and one for those hired after that
1 All dates are in 2000 unless otherwise indicated.
2 The facts are largely undisputed. Any factual disputes that are criti-
cal to resolution of the issues here will be discussed in the next section
of this decision.
3 The contract also refers to washers as cleaners. This latter term was
the one used by the parties at the hearing and will be used in this deci-
sion to refer to those employees who clean the buses.
date. The pre-1989 employees had the option of receiving vaca-
tion pay on a mileage or hourly basis whereas those employees
hired since the Respondent took over the business received
vacation pay on an hourly basis. As part of the negotiations for
the current agreement, the parties agreed to eliminate the two
tiers so that all employees would now receive vacation pay
based on their hourly rate. The dispute which led to the filing of
the instant charge involves the number of hours the Respondent
uses to calculate the weekly vacation pay for the mechanics and
cleaners in the unit.
It is undisputed that all unit employees who were hired after
January 19, 1989, whether a driver, a mechanic, or a cleaner,
received 40 hours’ pay for a week of vacation from 1989 until
the January 19, 1996 effective date of the immediately preced-
ing contract. In the 1996 agreement, the parties negotiated an
increase in the weekly amount of vacation pay from 40 hours to
50 hours. The parties disagree whether this increase applied to
all second-tier employees or only drivers. The vacation provi-
sion that appears in the 1996 contract reads as follows:
VACATIONS
ARTICLE G 3
Section 7. All employees covered by this agreement
receive vacation with pay outlined in the following sched-
ule. Vacations will commence on Friday.
Vacation schedule for employees hired prior to
01/19/89
Seniority of
Number of weeks
One Year
1
Two years
2
Seven Years
3
Fifteen Years
4
Twenty Five Years
5
Vacation pay for regular spare board operators will be
1500 miles per week based on his or her prevailing mile-
age rate. A regular run operator will receive pay based on
what his/her regular run would pay as long as the regular
run operator has operated a regular run for the preceding
four (4) months.
Vacations [sic] schedule for employees hired after
1/19/89:
Number of
Seniority of
weeks
Hours of Pay
One Year
1 Week
50
Two Years
2 Weeks
100
Seven Years
3 Weeks
150
Fifteen Years
4 Weeks
200
Twenty Five Years
5 Weeks
250
There is no dispute that, during the term of the 1996 contract,
the Respondent continued to pay mechanics and cleaners vaca-
tion pay based on 40 hours per week, rather than the 50-hour
week set forth in the agreement. There is also no dispute that no
employee or representative from the Union complained or pro-
tested, during the term of the 1996 contract, that the mechanics
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
6
and cleaners were not receiving the 50 hours per week vacation
pay set forth in the contract.
In October 1998, the Respondent’s president, Raynald Du-
puis, contacted the Union’s business agent, Garfield Rucker,
and asked to open negotiations early for a new contract.4 Du-
puis testified that he wanted early negotiations because the
Waterford employees were falling behind employees at the
Respondent’s other divisions in terms of their wages and bene-
fits.5 According to Dupuis, the Respondent has had a policy of
equalizing wages and benefits at its three divisions to avoid
dissension within the company. A comparison of the 1996 and
1999 contracts in evidence shows that, in fact, the parties nego-
tiated substantial increases in wages for both drivers and non-
drivers in the 1999 agreement.
The parties commenced negotiations in mid-October 1998
and reached agreement on the current contract in about 3
months. Richard Murphy, its International representative, and
the Local Union’s executive board, which included Business
Agent Rucker and Local President Holiner Miliner, represented
the Union in these negotiations. Miliner, a cleaner in the Water-
ford facility, was the only member of the executive board who
was employed by the Respondent in a nondriving position.
Dupuis and Colin Johnson, the general manager of the Water-
ford facility, represented the Respondent.6 Johnson and Murphy
were the chief spokespersons for their respective parties.
The only change negotiated with respect to the above-
vacation provision was elimination of the two-tier system and
the language relating to the mileage-based vacation benefits
applicable to the top tier.7 At the time, the top-tier vacation
schedule applied to only one employee, a driver.8 There is no
dispute that the Union proposed this change and that the Re-
spondent readily agreed. Although there is some dispute as to
what was said at the time, there is no dispute that the discussion
was very brief and that there was no separate discussion regard-
ing vacation benefits for mechanics and cleaners. The contract
that resulted from these negotiations contained the following
vacation provision at article G 3, section 7:
4 The 1996 collective-bargaining agreement was not due to expire
until January 18, 2000.
5 The Respondent operates three facilities in Connecticut, all union-
ized.
6 Donna Kitlinski, who preceded Johnson as the general manager in
Waterford, was also present for one or more sessions in late 1998.
Johnson started working as the general manager in October 1998 and
Kitlinski retired in December 1998. Kitlinski was on sick leave for
much of the transition period.
7 The parties also agreed to eliminate a similar two-tier wage sched-
ule and mileage-based pay for all drivers. Under the 1999 contract, all
unit employees receive an hourly rate of pay.
8 Kitlinski, who worked for Savin Bros. until 1989 and had been the
Waterford general manager since the Respondent acquired the facility
that year, testified that there was at least one garage employee in the
unit, Norm Matthieu, who had a seniority date before January 19, 1989.
The Respondent’s payroll records in evidence show that Matthieu, an
active employee at the time of the hearing, received vacation pay dur-
ing the 1996 contract based on a 40-hour week.
Section 7. All employees covered by this agreement
receive vacation with pay outlined in the following sched-
ule. Vacations will commence on Friday.
Number
Seniority of
of weeks
Hours of Pay
One Year
1 Week
50
Two Years
2 Weeks
100
Seven Years
3 Weeks
150
Fifteen Years
4 Weeks
200
Twenty Five Years
5 Weeks
250
The Respondent drafted the final agreement that contained
this language. In March 1999, Johnson met with the Union’s
executive board in a conference room at the Waterford facility
to sign the agreement. He signed on behalf of the Respondent
and Miliner and Rucker signed on behalf of the Union. The
signed contract was then sent to Dupuis at his office in East
Hartford, Connecticut, where he added his signature. Dupuis
and Johnson admitted reading the language in article G 3, sec-
tion 7 before signing the agreement.
There is no dispute that from January 1999 until June 2000
the Respondent continued to pay mechanics and cleaners vaca-
tion pay on the basis of a 40-hour week, notwithstanding the
language quoted above. There is also no dispute that, prior to
June 16, no employee or representative from the Union, includ-
ing Miliner, ever complained or protested that the mechanics
and cleaners were not receiving the 50 hours per week vacation
pay set forth in the contract.
On June 16, Jose Rodriquez, a cleaner in the unit who has
since become the Union’s steward, received his pay for the 1-
week vacation he took June 2–8. Coincidentally, he happened
to have recently read the collective-bargaining agreement dur-
ing a slow period at work. When he received his check with 40
hours’ pay, he recalled having seen the contract’s vacation
clause that said, “all employees covered by this agreement re-
ceive” 50 hours’ pay per week of vacation. Rodriquez brought
his check and the contract to his supervisor, James Sardinha,
and inquired why he didn’t get the 50 hours called for in the
contract. According to Rodriquez, Sardinha read the contract
clause and told Rodriquez that he would discuss it with Cindy,
who handles payroll, and get back to him. Sardinha later told
Rodriquez that he had talked to Cindy and that Rodriquez
would be getting his money in the next check.9 On the same
day, Rodriquez signed his timesheet for the week ending June
15, adding a note about the additional vacation pay he believed
he was owed and attaching a copy of the contract’s vacation
provision. There is no dispute that Sardinha submitted this ma-
terial to payroll. Johnson and Dupuis admitted being aware of
Rodriquez request for the 50 hours vacation pay in mid-June.
Rodriquez testified that when he got his next paycheck, he
did not get the additional vacation pay. Instead, he and the other
mechanics and cleaners in Waterford received the following
9 Sardinha acknowledged having a conversation with Rodriquez
about his vacation pay in June. According to Sardinha, he merely told
Rodriquez, “[I]f Arrow Line owes you the money, you will get it. If
they don’t, you won’t.”
ARROW LINE, INC./COACH USA
7
notice from Kathy Morin, director of human resources, dated
June 19:
Upon reviewing the Union Contract we have noticed that the
section for VACATION BENEFITS HAS BEEN INAD-
VERTENTLY LEFT OUT OF THE CONTRACT. We
apologize for any inconvenience this may have caused.
VACATION benefits for mechanics and cleaners is as fol-
lows:
Numbers
Seniority of
of Weeks
Hours of Pay
One year
1 week
40
Two years
2 weeks
80
Seven years
3 weeks
120
Fifteen years
4 weeks
160
Twenty Five years
5 weeks
200
The notice indicates that a copy was sent to the Union. Morin
testified that, either the day before or the same morning that the
notices were sent with the paychecks to Waterford, she mailed
a copy of the notice to Rucker at a residence address she ob-
tained from the payroll administrator. Rucker acknowledged
receiving a copy of this notice, but could not recall whether he
received it from the Respondent or one of the employees. Ac-
cording to Rucker, Rodriquez’ complaint and this notice were
the first indication he had that the Respondent was not paying
mechanics and cleaners 50 hours per week of vacation. Al-
though Rucker had previously worked for the Respondent as a
bus driver in the unit, he has worked for another employer since
1997. Miliner, the Local president and a member of the Union’s
negotiating committee who signed the contract on behalf of the
Union, worked as a cleaner in the unit at Waterford. It appears
from the Respondent’s payroll records that he received vacation
pay during the term of the 1996 and 1999 contracts based on a
40-hour week. He did not testify at the hearing and his absence
was never explained.
It is undisputed that there were no discussions between the
Respondent and the Union regarding the subject of vacation
benefits for mechanics and cleaners outside of negotiations for
the 1996 and 1999 collective-bargaining agreements. As noted
previously, the discussions regarding vacation benefits during
negotiations were general in nature and did not focus on drivers
vs. nondrivers. The Respondent’s witnesses did concede at the
hearing that the schedule of vacation benefits for mechanics
and cleaners contained in Morin’s June 19 notice had not ex-
isted in this format before June 19, although this schedule re-
flected the Respondent’s actual practice since 1989 when it
acquired the facility.
B. Analysis
The General Counsel alleges that the Respondent’s failure to
pay the mechanics and cleaners in the Waterford unit vacation
benefits based on a 50-hour week constituted a midterm modi-
fication of the collective-bargaining agreement in violation of
Section 8(a)(1) (5) and 8(d) of the Act. The plain language of
the 1999 contract, quoted above, says that “all employees cov-
ered by the agreement” receive vacation with pay in accordance
with the published schedule. That schedule is based on a 50-
hour week. Because the mechanics and cleaners are expressly
covered by the agreement, the Respondent’s failure to pay them
in accordance with that schedule would seem to be a clear
modification of the contract. Because there is no evidence that
the Respondent ever obtained the Union’s consent to its differ-
ent treatment of the mechanics’ and cleaners’ vacation pay, an
unfair labor practice finding would seem inescapable. The Re-
spondent argues, to the contrary, that the contract doesn’t really
mean what it says. The parties understood that “all employees”
actually means drivers. According to the Respondent, the me-
chanics and cleaners have always received vacation based on a
40-hour week, even after the parties negotiated an increase to
50 hours in the 1996 contract. That increase, according to the
Respondent, was based on the fact that drivers typically work
much more than 40 hours a week. Mechanics and cleaners, on
the other hand, generally average no more than 40 hours. The
1999 contract did not change this aspect of vacation benefits
when it eliminated the top tier and the mileage rate. In the Re-
spondent’s view, the Union’s acquiescence in the Respondent’s
practice of calculating vacation pay for mechanics and cleaners
at less than what the contract would seem to require shows that
the Union had the same understanding that the contract sched-
ule only applies to drivers. These arguments advanced by the
parties raise issues of contract interpretation, parol evidence
and waiver. However, I find it unnecessary to resolve those
issues because I find that the complaint allegations are time-
barred under Section 10(b) of the Act.
Section 10(b) of the Act precludes the issuance of a com-
plaint “based upon any unfair labor practice occurring more
than six months prior to the filing of the charge with the Board
and the service of a copy thereof upon” the charged party. Al-
though the General Counsel may rely on evidence outside the
10(b) period as “background,” he is barred from bringing any
complaint in which the operative events establishing the viola-
tion occurred more than 6 months before the unfair labor prac-
tice charge has been filed and served. Allied Production Work-
ers Local 12 (Northern Engraving Corp.), 331 NLRB 1, 2,
(2000), and cases cited therein. The statute of limitations under
Section 10(b) begins to run, however, only when a party has
“clear and unequivocal notice” of a violation of the Act. Id.
Notice can be actual or constructive. Thus, the Board has found
sufficient notice to start the limitations period where a party,
“in the exercise of reasonable diligence, should have become
aware” of facts indicating that the Act had been violated. Moel-
ler Bros. Body Shop, 306 NLRB 191, 192–193 (1992). Accord:
Carrier Corp., 319 NLRB 184, 190–193 (1995). The burden of
showing that a charging party was on notice of a violation of
the Act is on the Respondent. A & L Underground, 302 NLRB
467, 468 (1991).
The charge here was filed on August 11, 2000, and a copy
was served on the Respondent by fax and regular mail on Au-
gust 22, 2000. To satisfy its burden under Section 10(b), the
Respondent had to show that the Union knew or could have
known by the exercise of reasonable diligence, before February
23, 2000, that the Respondent was not paying vacation benefits
in accordance with the terms of the agreement. Because there is
no dispute that the Respondent never paid mechanics and
cleaners 50 hours per week of vacation, and because the Local
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
8
president was himself a member of the bargaining unit who
would be directly affected by the alleged unfair labor practice, I
find that the Union had clear and unequivocal notice of a viola-
tion long before this date. There can be no question that
Miliner, as a union officer, a participant in the negotiations
which resulted in the contract provision at issue and a cleaner in
the bargaining unit, was a witness likely to have knowledge of
the matters at issue in this proceeding. As an officer of the
Charging Party, it may reasonably be assumed that he would be
favorably disposed to the Charging Party. I must infer, from the
General Counsel’s failure to call Miliner as a witness, that his
testimony would have been adverse to the Charging Party’s
interest. Grimmway Farms, 314 NLRB 73 fn. 2 (1994).
It may be inferred that, had Miliner testified, he would have
confirmed what the Respondent’s payroll records show, i.e.,
that he received vacation pay on the basis of 40 hours and not
50 hours a week throughout the period covered by the 1996 and
1999 contracts. He would, thus, have contradicted the testi-
mony of Rucker that the Union did not know that the Respon-
dent was not paying the contractual rate for vacation pay until
Rodriquez complained in June. Miliner would also have cor-
roborated the testimony of the Respondent’s witnesses that he
never complained or protested that the Respondent was not
paying him the proper amount of vacation pay. The General
Counsel argues that the Union can’t be charged with knowledge
of the contents of the Respondent’s payroll and personnel re-
cords showing the allegedly incorrect amount was paid in 1998,
1999, and 2000 because the Union had not seen these records.
This misses the point. Miliner certainly saw his paycheck when
he received vacation pay and had to have known he was receiv-
ing only 40 hours’ pay for each week of vacation. Because he
was at the negotiations in 1996 and signed the contract in which
the parties first agreed to increase vacation pay from 40 hours
to 50 hours for “all employees covered by this agreement,” his
receipt of only 40 hours’ pay put him on notice that there might
be a violation. By inquiring further and “in the exercise of
reasonable diligence,” he and the Union would have uncovered
sufficient facts to conclude that the Respondent had “modified”
the vacation provision of the agreement. The Union was, thus,
on notice of the violation the first time Miliner received vaca-
tion pay for less than 50 hours a week. An employee absence
request form in evidence shows that Miliner requested 1 week’s
vacation to begin April 1, 1998, and that he was paid 40 hours
for this week. No charge was filed within 6 months of this date.
The General Counsel might argue that the negotiation of a
new agreement, effective on January 19, 1999, superseded any
prior unlawful modification of the vacation provision because
of the “zipper clause” in the agreement. Article G 15, section 1
provides that “[a]ll of the sections constitute the full and com-
plete agreement between the parties and supersedes all prior
understandings.” Section 2 of that article prohibits individual
agreements or understandings that would be inconsistent with
the express terms of the agreement. Under this argument, the
Respondent’s failure to pay the mechanics and cleaners 50
hours per week of vacation after the effective date of the new
agreement would be a new violation of the Act. However,
Miliner was on notice of this new violation as soon as he re-
ceived his first vacation pay for less than the contractual
amount. The Respondent’s records in evidence show that
Miliner was “allowed” only 120 hours of vacation pay in cal-
endar year 1999, the first year of the contract. Based on his
length of service, he was entitled to 3 weeks vacation with pay.
These records establish that the Respondent paid him only 40
hours per week of vacation in 1999. Moreover, the vacation
requests submitted by Miliner in 1999 show that he took 12
vacation days in 1999, in individual increments, and was paid
for 10 hours each day, i.e., 120 hours total. There is no dispute
that the garage employees (mechanics and cleaners) were work-
ing 4 10-hour days a week during 1999. The General Counsel
argues that the manner in which Miliner took his vacation in
1999, daily rather than weekly, and the Respondent’s payment
to him of 10 hours per vacation day, could have created confu-
sion whether the Respondent was paying 40 or 50 hours per
week of vacation.10 Any such ambiguity, however, would have
been resolved by the end of the year when Miliner had received
all of his vacation pay and it totaled 120 hours and not 150 as
apparently required by the contract. Again, he had enough facts
that, with the exercise of reasonable diligence, he would have
known that the Respondent was not paying vacation in accor-
dance with the plain language of the contract before January 1,
2000. The charge here was filed more than 6 months after
Miliner would have been on notice of this unfair labor practice.
In reaching my conclusion that the complaint is barred by
Section 10(b), I have also considered whether the Respondent’s
failure to pay the mechanics and cleaners 50 hours per week of
vacation is a “continuing violation.” A continuing violation is
one where the respondent commits an unfair labor practice
outside the 10(b) period that continues during the period. Al-
though Section 10(b) would bar complaint and remedial relief
for the conduct occurring more than 6 months before a charge
is filed, relief may be sought for conduct within the 10(b) pe-
riod which would constitute a separate and distinct substantive
violation in its own right. Farmingdale Iron Works, Inc., 249
NLRB 98 (1980), enfd. mem. 661 F.2d 910 (2d Cir. 1981). A
continuing violation is most often found in the context of an
employer’s failure to make periodic benefit payments during
the term of a collective-bargaining agreement. The operative
facts establishing the violation, i.e., the existence of the contract
requiring the periodic payments and the respondent’s failure to
comply with its contractual requirements, is established from
evidence of events within the 10(b) period. Farmingdale Iron
Works, supra. This is to be distinguished from the situation
where a discrete unfair labor practice, such as the refusal to
execute a collective-bargaining agreement or the total repudia-
tion of a contract, occurs outside the 10(b) period but has ef-
fects that continue during the 10(b) period. In those situations,
where the conduct within the 10(b) period would only be
unlawful by reference to events occurring outside the period, a
10 This speculation by the General Counsel as to why the Union did
not pursue the matter based on Miliner’s receipt of vacation pay in
1999 is pure speculation in the absence of Miliner’s testimony as to
what he knew or did not know and what he did in response to these
vacation payments in 1999. Once again, any inferences must be drawn
against the General Counsel for failing to call Miliner to testify regard-
ing these matters.
ARROW LINE, INC./COACH USA
9
complaint and remedy is precluded. A & L Underground, supra;
Chemung Contracting Corp., 291 NLRB 773, 774–775 (1988).
The alleged unfair labor practice here is the Respondent’s
failure to pay a segment of the bargaining unit vacation pay
based on a schedule set forth in the contract. Because the con-
tract was still in effect at the time the charge was filed, it could
be argued that each time the Respondent paid an employee 40
hours instead of 50 hours for a week’s vacation, it committed a
separate and distinct violation of the Act. However, the Re-
spondent’s conduct in paying mechanics and cleaners the lesser
amount was not a departure from the practice it had followed
since acquiring the facility in 1989. Rather, the Respondent
simply adhered to a method of calculating vacation benefits for
its nondriving employees that had been established more than 6
months before the charge and had continued without change.
This case is, thus, similar to the facts in Continental Oil Co.,
194 NLRB 126 (1971). There, the employer unilaterally im-
plemented a method of equalizing overtime that clearly de-
parted from the express terms of the collective-bargaining
agreement more than 6 months before the charge was filed. The
employer continued to follow this system during the 10(b) pe-
riod without change. The Board found that each individual
application of the unilaterally implemented contract modifica-
tion did not constitute an independent unfair labor practice. I
find that the Respondent’s adherence, during the 10(b) period,
to a different schedule of vacation benefits for nondriving em-
ployees than the schedule of benefits for “all employees” that
appears in the contract was not a new and independent violation
of the Act. The Respondent’s conduct within the 10(b) period
was merely the result of allegedly unlawful conduct that the
Union was aware of, or should have been aware of in the exer-
cise of reasonable diligence, more than 6 months before the
charge was filed.
Unlike the continuing violation cases, the Respondent here
did not totally repudiate the vacation provisions of the contract.
It continued to pay vacation benefits to all unit employees and
continued to pay the drivers 50 hours per week of vacation and
nondrivers 40 hours per week of vacation based on its under-
standing of the contract as it had been applied since 1996 with-
out complaint or protest from the Union. Under these circum-
stances, to permit litigation of the complaint based on a charge
filed more than 6 months after the Union had clear and un-
equivocal notice of the Respondent’s departure from the lan-
guage of the contract would be contrary to the fundamental
policies underlying the 10(b) limitation period. Accordingly, I
shall recommend that the complaint be dismissed in its en-
tirety.11
CONCLUSION OF LAW
The Respondent did not engage in any unfair labor practice,
as alleged in the complaint, during the 6-month period prior to
the filing of an unfair labor practice charge with the Board and
service of a copy of such charge on the Respondent.
On these findings of fact and conclusions of law and on the
entire record, I issue the following recommended12
ORDER
The complaint is dismissed.
11 Although it is not necessary for me to resolve the issue, the appar-
ent acquiescence by the president of the Charging Party in the Respon-
dent’s payment of different vacation benefits to nondrivers in the unit
than those spelled out in the contract supports the Respondent’s conten-
tion that the parties understood that the 50-hour per week vacation
schedule in the contract applied only to drivers. Such a finding would
also be supported by testimony of the Union’s business agent, during
rebuttal. In response to a question about the 1999 negotiations that
eliminated the two-tier system, Rucker testified, “I recall that we
wanted to take the two tiers away, out of the old contract, and we
wanted a one package, one section for vacation, for all members, be-
cause we never had a vacation in our contract that included mechanics
and cleaners. Always, before previous was just designation for drivers
and the percentage of drivers for their mileage and everything.” See,
e.g., Resco Products, 331 NLRB 1546, 1548 (2000).
12 If no exceptions are filed as provided by Sec. 102.46 of the
Board’s Rules and Regulations, the findings, conclusions, and recom-
mended Order shall, as provided in Sec. 102.48 of the Rules, be
adopted by the Board and all objections to them shall be deemed
waived for all purposes.