354 NLRB 975
Operating Engineers Local 150 (Pedersen Co.)
354 NLRB No. 112
NOTICE: This opinion is subject to formal revision before publication in the
bound volumes of NLRB decisions. Readers are requested to notify the Ex-
ecutive Secretary, National Labor Relations Board, Washington, D.C.
20570, of any typographical or other formal errors so that corrections can
be included in the bound volumes.
International Union of Operating Engineers, Local
150, AFL–CIO and International Brotherhood
of Teamsters, Local 703 and Paul F. Pedersen
Company d/b/a Pedersen Company and United
Union of Roofers, Waterproofers and Allied
Workers, Local No. 11. Cases 13–CD–802 and
13–CD–803
November 27, 2009
DECISION AND DETERMINATION OF DISPUTE
BY CHAIRMAN LIEBMAN AND MEMBER SCHAUMBER
This is a jurisdictional dispute proceeding under Sec-
tion 10(k) of the National Labor Relations Act. Paul F.
Pedersen Company d/b/a Pedersen Company (the Em-
ployer) filed charges on July 6, 2009,1 alleging that the
Respondents, International Union of Operating Engi-
neers, Local 150 (Operating Engineers), and Interna-
tional Brotherhood of Teamsters, Local 703 (Teamsters),
violated Section 8(b)(4)(D) of the Act by threatening to
engage in proscribed activity with an object of forcing
the Employer to continue to assign certain work to em-
ployees represented by Operating Engineers and Team-
sters rather than to employees represented by the United
Union of Roofers, Waterproofers and Allied Workers,
Local No. 11 (Roofers). The hearing was held on July
30 and 31 before Hearing Officer Cathy Brodsky.
Thereafter, Operating Engineers and Teamsters, jointly,
the Employer, and Roofers filed posthearing briefs.
The National Labor Relations Board2 affirms the hear-
ing officer’s rulings, finding them free from prejudicial
1 All dates refer to 2009 unless otherwise indicated.
2 Effective midnight December 28, 2007, Members Liebman,
Schaumber, Kirsanow, and Walsh delegated to Members Liebman,
Schaumber, and Kirsanow, as a three-member group, all of the Board’s
powers in anticipation of the expiration of the terms of Members Kir-
sanow and Walsh on December 31, 2007. Pursuant to this delegation,
Chairman Liebman and Member Schaumber constitute a quorum of the
three-member group. As a quorum, they have the authority to issue
decisions and orders in unfair labor practice and representation cases.
See Sec. 3(b) of the Act. See Narricot Industries, L.P. v.
NLRB,___F.3d___, 2009 WL 4016113 (4th Cir. Nov. 20, 2009); Snell
Island SNF LLC v. NLRB, 568 F.3d 410 (2d Cir. 2009), petition for
cert. filed 78 U.S.L.W. 3130 (U.S. Sept. 11, 2009) (No. 09-328); New
Process Steel v. NLRB, 564 F.3d 840 (7th Cir. 2009), cert. granted
___S.Ct.___, 2009 WL 1468482 (U.S. Nov. 2, 2009); Northeastern
Land Services v. NLRB, 560 F.3d 36 (1st Cir. 2009), petition for cert.
filed 78 U.S.L.W. 3098 (U.S. Aug. 18, 2009) (No. 09-213). But see
Laurel Baye Healthcare of Lake Lanier, Inc. v. NLRB, 564 F.3d 469
(D.C. Cir. 2009), petition for cert. filed 78 U.S.L.W. 3185 (U.S. Sept.
29, 2009) (No. 09-377).
error. On the entire record, we make the following find-
ings.
I. JURISDICTION
The parties stipulated that the Employer is an Illinois
corporation engaged in commercial landscape construc-
tion and maintenance, and that, during the past calendar
year, the Employer purchased and received goods and
materials valued in excess of $50,000 indirectly from
points located outside the State of Illinois. Accordingly,
the Employer is engaged in commerce within the mean-
ing of Section 2(6) and (7) of the Act. The parties fur-
ther stipulated, and we find, that Operating Engineers,
Teamsters, and Roofers are labor organizations within
the meaning of Section 2(5) of the Act.
II. THE DISPUTE
A. Background and Facts of the Dispute
The Employer has been engaged in commercial land-
scape construction and maintenance in the Greater Chi-
cagoland area since 1994. On June 8, 2004, the Board
certified Operating Engineers and Teamsters as the joint
representatives of the employees in a multiemployer bar-
gaining unit comprised of constituent members of the
Illinois Landscape Contractors Bargaining Association
(ILCBA). In this unit are the Employer’s landscape con-
struction employees, including lead plantsmen, plants-
men, landscape helpers, and installers. As an ILCBA
member, the Employer is signatory to the plantsmen
agreement3 with both unions and the operators agree-
ment4 with operating engineers. The Employer has never
had a collective-bargaining relationship with Roofers.
The Employer has subcontracting agreements with
general contractor F.H. Paschen, SN Nielsen & Associ-
ates (Paschen) to perform certain “green roof” work at
the Southwest Area Middle School (Middle School) and
Benito Juarez High School (High School) in Chicago,
Illinois. The Public Building Commission of Chicago
ordered the Middle School work; the Chicago Board of
Education ordered the High School work. The “green
roof” work at the Middle School includes installation of
3 The plantsmen agreement covers employees in the following clas-
sifications: lead plantsmen, plantsmen, equipment mechanics, shop
helpers, truck drivers, landscape helpers, water truck operators, and
installers. The plantsmen agreement’s scope of work includes “all
work historically performed in the landscape construction industry at or
on construction sites[.]” The Employer has approximately 15–18 em-
ployees covered by the plantsmen agreement.
4 The operators agreement covers employees working as landscape
equipment operators. The operators agreement’s scope of work in-
cludes the operation of equipment “on all commercial landscape con-
struction projects,” and specifically enumerates, inter alia, landscaping
work performed on rooftops. The Employer has approximately three
employees covered by the operators agreement.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
2
a Green Grid modular system.5 This involves placing
preplanted modular trays on the roof of the building
above the roof membrane. The “green roof” work at the
High School includes installation of a built-up green roof
system consisting of multiple layers or components that
are installed on top of the roof membrane to create a
rooftop garden. After framing the planting area with
aluminum edging, the Employer places the following
components above the roof membrane: a water retention
mat, filter fabric, aggregate (i.e., loose gravel), growth
medium (i.e., soil graded to the appropriate depth), and
finally the plants. Under both of its subcontracts with
Paschen, the Employer waters and otherwise maintains
the plants before and during installation. The Employer
also warrants the plants for 1 year after installation,
meaning that its employees must return to the jobsites to
water and otherwise maintain the plants during the war-
ranty period, replacing them as necessary.
The Employer has historically performed green roof-
top projects using its employees represented by Operat-
ing Engineers and Teamsters. Consistent with this prac-
tice, the Employer assigned the green roof installation
work at both jobsites, as well as all other landscaping
work under the Middle School subcontract, to these em-
ployees. The Employer has never assigned green roof
work to employees represented by Roofers.
On June 16, Roofers initiated the procedures of the
Joint Conference Board (JCB) to resolve an alleged ju-
risdictional dispute with respect to the performance of
the green roofing work at the Middle School and High
School jobsites. The JCB is established under the Stan-
dard Agreement between the Construction Employers’
Association and the Chicago and Cook County Building
and Construction Trades Council (CBTC). Roofers and
Operating Engineers are members of the CBTC and are
therefore signatories to the standard agreement. Team-
sters is not a CBTC member and the Employer is not a
member of the Construction Employers’ Association.
Accordingly, neither Teamsters nor the Employer is sig-
natory to the standard agreement.
Roofers’ initiation of JCB procedures culminated in
JCB arbitration hearings involving Roofers and Operat-
ing Engineers. The Standard Agreement provides that an
interested party present at a JCB hearing is deemed to
accept the jurisdiction of the arbitrator and to be bound to
the Standard Agreement for that case only. Neither
Teamsters nor the Employer attended the JCB hearings.
There also exists a multi-project labor agreement
(PLA) between the CBTC and the Chicago Board of
5 The Green Grid system is a proprietary technology of ABC Supply
Co., Inc., licensed to Weston Solutions, Inc.
Education that incorporates the JCB procedure for re-
solving jurisdictional disputes. The PLA relevantly pro-
vides that “the parties to this Agreement, as well as each
contractor and subcontractor performing work on or for
the project, specifically are bound and stipulated to the
jurisdiction and process of the Joint Conference Board.”
The High School project is subject to the PLA, which
thereby binds the Employer to the jurisdiction and proc-
ess of the JCB as to that project. Whether the PLA ap-
plies to the Middle School project is disputed.6 Operat-
ing Engineers and Roofers are signatories to the PLA;
Teamsters is not.
Following Roofers’ June 16 initiation of JCB proce-
dures, Teamsters and Operating Engineers, in a letter to
the Employer dated July 6, threatened to picket the Mid-
dle School and High School jobsites if the Employer
reassigned any of the disputed work to members of
Roofers.
B. Work in Dispute
The work in dispute consists of certain green roof
work to be performed by the Employer at the Middle
School jobsite located at 3510 West 55th Street, and at
the High School jobsite located at 2150 South Laflin
Street, both in Chicago, Illinois. Specifically, the work
in dispute at the Middle School consists of the placement
of Green Grid preplanted vegetative modular trays and
related components above the waterproofing membrane.
The work in dispute at the High School consists of the
installation of all layers in the built-up green roof system
above the waterproofing membrane, up to and including
the placement of the growth medium (i.e., soil). Roofers
is not claiming any of the other work at either jobsite,
including planting, watering and maintaining the plant
materials at any time either before or during the 1-year
warranty period. Neither is Roofers claiming any work
after the placement of the soil at the High School jobsite,
including the grading of the soil.
C. Contentions of the Parties
Operating Engineers, Teamsters, and the Employer
contend that (1) there are competing claims for the work
in dispute; (2) there is reasonable cause to believe that
Operating Engineers and Teamsters violated Section
8(b)(4)(D) by their threat to picket; (3) no voluntary
method for dispute resolution exists to which all parties
have agreed; and (4) the disputed work should be
awarded to employees represented by Operating Engi-
6 Roofers contends that the PLA applies to the Middle School, while
the Employer, Operating Engineers, and Teamsters contend that it does
not so apply. The JCB arbitrator found that it does not. We need not
and do not resolve this dispute because, as discussed in Part D, infra,
Teamsters is not bound to the PLA under any circumstances.
OPERATING ENGINEERS LOCAL 150 (PEDERSEN CO.)
3
neers and Teamsters based on the factors of Board certi-
fication and collective-bargaining agreements, employer
preference and past practice, area and industry practice,
economy and efficiency of operations, relative skills, and
gain or loss of employment.
Roofers moves to quash the notice of hearing primarily
on the ground that the JCB procedure constitutes an
agreed-upon voluntary means for adjusting the dispute
binding on all of the parties. Roofers contends that it and
Operating Engineers are bound to the JCB procedure as
members of the CBTC, and the PLA, which incorporates
the JCB procedure, applies to both the Middle School
and High School jobsites and thus binds the Employer to
the JCB procedure as to both “green roof” projects.
Roofers further contends that as Teamsters is the joint
representative of the Employer’s employees together
with Operating Engineers, Operating Engineers’ assent
to the JCB procedure binds Teamsters as well. In the
alternative, Roofers contends that the notice of hearing
still must be quashed because there are no competing
claims to the work in dispute, and the threat to picket by
Operating Engineers and Teamsters was a noncoercive
sham. In the event that the Board does exercise its juris-
diction under Section 10(k) of the Act, Roofers contends
that the Board should award the work in dispute to em-
ployees that it represents based on the factors of relative
skills, economy and efficiency of operations, area prac-
tice, and prior jurisdictional dispute determinations.
D. Applicability of the Statute
Before the Board may proceed with determining a dis-
pute pursuant to Section 10(k) of the Act, it must be es-
tablished that reasonable cause exists to believe that Sec-
tion 8(b)(4)(D) has been violated. This requires a finding
that there is reasonable cause to believe that there are
competing claims to disputed work between rival groups
of employees and that a party has used proscribed means
to enforce its claim. In addition, the Board must find that
the parties have no agreed-upon method for voluntary
adjustment of the dispute.7 For the reasons stated below,
we find that this dispute is properly before the Board for
determination on the merits under Section 10(k).
First, although Roofers now contends that there are not
competing claims to the disputed work, it joined the
other parties in stipulating to the existence of competing
claims. Besides, employees represented by Operating
Engineers and Teamsters have been performing the work
and expressly claimed the work by their joint letter of
July 6, and Roofers made a competing claim by virtue of
its efforts to secure an award of the disputed work
7 Bricklayers (Cretex Construction Services), 343 NLRB 1030, 1031
fn. 2 (2004).
through the JCB grievance and arbitration proceedings.8
We find that there is reasonable cause to believe that
there are competing claims to the disputed work.
Second, we find that there is reasonable cause to be-
lieve that Operating Engineers and Teamsters used
means proscribed under Section 8(b)(4)(D) to enforce
their claim. Their July 6 joint letter to the Employer,
threatening it with picketing if it reassigned any of the
disputed work to members of the Roofers, constitutes a
threat to take proscribed coercive action in furtherance of
a claim to the work in dispute. Although Roofers urges
the Board to find that this threat was a sham, there is no
evidence that the threat was not made seriously or that
Teamsters and Operating Engineers colluded with the
Employer in this matter.9 In fact, record testimony estab-
lished that Paschen twice delayed all roof work at the
Middle School in response to the picketing threat. More-
over, the Board has rejected the argument that a strike
threat was a sham simply because it would have violated
a no-strike clause.10
Finally, we find that there is no method for voluntary
adjustment of the dispute to which all parties have
agreed. It is settled that the Board will not hear a dispute
when all of the parties are bound to an alternative method
of adjustment.11 Roofers contends that all parties are
bound to the JCB procedure for resolving jurisdictional
disputes. It concedes, however, that the sole basis for
finding Teamsters bound to the JCB procedure is Team-
sters’ joint-representative status with Operating Engi-
neers. Roofers argues that because of that joint-
representative relationship, Operating Engineers’ assent
to the JCB procedure (by virtue of its being signatory to
the PLA) binds Teamsters as well. In support, Roofers
cites cases in which the act of one joint-representative
union was held binding on the other;12 but none of the
cited cases is on point.
8 See Operating Engineers Local 150 (Moore Landscapes), 354
NLRB No. 89, slip op. at 3 (2009).
9 See Lancaster Typographical Union 70 (C.J.S. Lancaster), 325
NLRB 449, 450–451 (1998) (“It is well established that as long as a
Union’s statement, on its face, constitutes a threat to take proscribed
action, the Board will find reasonable cause to believe that the statute
has been violated, in the absence of affirmative evidence that the threat
was a sham or was the product of collusion.”).
10 Id. at 451 (“The existence of a no-strike clause in a union’s collec-
tive-bargaining agreement does not provide a basis for finding that a
threat by that union is a sham.”).
11 Operating Engineers Local 150 (R&D Thiel), 345 NLRB 1137,
1140 (2005); Operating Engineers Local 150, AFL–CIO (Nickelson
Industrial Service), 342 NLRB 954, 955 (2004) (holding that “in order
for an agreement to constitute an agreed-upon method for voluntary
adjustment, all parties to the dispute must be bound to that agreement”).
12 Adobe Walls, 305 NLRB 25, 27 (1991), enfd. mem. 19 F.3d 1433
(6th Cir. 1994); Pharmaseal Laboratories, 199 NLRB 324, 325 (1972);
see also Electrical Workers IUE (Spartus Corp.), 271 NLRB 607
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
4
For example, the most nearly apposite case,
Pharmaseal, supra, is still far afield. In Pharmaseal, the
Board based its holding on evidence that the joint-
representative unions had engaged in a course of conduct
establishing that one of them had authority to bind both,
and that the employer was led to believe that this was so.
Here, Roofers makes no claim that Teamsters and Oper-
ating Engineers engaged in a course of conduct establish-
ing that Operating Engineers had authority to bind the
Teamsters to the PLA. Rather, Roofers rests its conten-
tion solely and entirely on Teamsters’ and Operating
Engineers’ status as joint representative of employees
covered by the Plantsmen Agreement. Roofers cites no
authority, and we have found none, under which that fact
alone would suffice. Moreover, Roofers took action in-
consistent with its contention here. As the Employer
points out, it attempted to have Teamsters removed from
the Middle School and High School jobsites because
Teamsters is not bound to the PLA. Consequently, we
conclude that because Teamsters is bound to neither the
Standard Agreement nor the PLA, all parties to the in-
stant dispute have not agreed to abide by the JCB proce-
dure. Accordingly, we proceed to the merits of the dis-
pute.
E. Merits of the Dispute
Section 10(k) requires the Board to make an affirma-
tive award of the disputed work after considering various
factors in light of the Board’s “[e]xperience and common
sense.” NLRB v. Electrical Workers IBEW Local 1212
(Columbia Broadcasting), 364 U.S. 573, 583 (1961).
The Board has held that its determination in a jurisdic-
tional dispute is an act of judgment based on common
sense and experience, reached by balancing the factors
involved in a particular case. Machinists Lodge 1743
(J.A. Jones Construction), 135 NLRB 1402, 1410–1411
(1962). Based on the following factors, which we find
are relevant to determining this dispute, we conclude that
the Employer’s employees represented by Operating En-
gineers and Teamsters are entitled to perform the work in
dispute.
1. Certifications and collective-bargaining agreements
The Board has exclusively certified Operating Engi-
neers and Teamsters jointly as the representative of the
Employer’s employees in classifications performing the
work in dispute. In addition, the Plantsmen Agreement
and Operators Agreement, to which the Employer is
bound through its membership in the ILCBA, at least
generally cover the work in dispute as well as all em-
(1984) (service of charge on one joint-representative union held suffi-
cient for service of charge on the other).
ployees performing that work.13 By contrast, the Em-
ployer has never had a collective-bargaining relationship
with Roofers. Accordingly, we find that the factor of
Board certification and collective-bargaining agreements
favors awarding the disputed work to employees repre-
sented by Operating Engineers and Teamsters.
2. Employer preference and past practice
The Employer has assigned all of the disputed work to
its employees represented by Operating Engineers and
Teamsters and prefers that they continue to perform it.
Moreover, the Employer has used employees represented
by Operating Engineers and Teamsters for green roof
work since it began performing this work. The Employer
has never assigned Roofers any green roof work. Ac-
cordingly, we find that the factor of employer preference
and past practice favors an award of the work in dispute
to employees represented by Operating Engineers and
Teamsters.
3. Area and industry practice
Green roof landscaping has been routinely assigned to
employees represented by Operating Engineers and
Teamsters since at least 1995, and these two unions have
jointly represented landscapers employed by ILCBA-
member employers since 2004. The Employer presented
evidence showing that Illinois Landscape Contractors
Association members have assigned at least 119 rooftop
landscaping projects to employees represented by Oper-
ating Engineers and Teamsters since 2002. Although
Roofers claims that roofing contractors have been install-
ing garden or green rooftop systems longer than land-
scape contractors have been, its evidence did not specify
whether the work done by the roofing contractors was
actually performed by employees represented by Roof-
ers, or that the work performed was actually of the same
type as the work in dispute here, i.e., vegetative roofs.
Roofers also presented evidence of several vegetative
roof installations that its members completed in the past
2 years, including a 500,000-square-foot project at
McCormick Place in Chicago. Roofers makes much of
this square footage; however, it is insufficient to over-
come the extensive showing of Operating Engineers’ and
Teamsters’ area and industry practice of installing vege-
tative green roof systems. Thus, this factor weighs in
favor of awarding the work in dispute to employees rep-
resented by Operating Engineers and Teamsters.14
13 The operators agreement specifically mentions green roof work in
its scope of work; and while the current plantsmen agreement does not
do likewise, the parties to it have always interpreted its general scope of
work provisions as encompassing green roof work.
14 See Moore Landscapes, supra, slip op. at 5.
OPERATING ENGINEERS LOCAL 150 (PEDERSEN CO.)
5
4. Relative skills
The Employer, Operating Engineers, and Teamsters
presented
evidence
showing
that
their
employ-
ees/members receive on-the-job and classroom training,
attend OSHA training courses, participate in “toolbox
safety meetings” at worksites, and have prior experience
performing green roof work. In addition, the Employer
introduced unrebutted testimony stating that ground- and
roof-level landscaping is essentially the same type of
work, performed at different elevations. Record testi-
mony also supports the lack of a need for roofing skills
to perform green roof work, as such work involves no
tampering with or altering of the roof surface itself.15 All
green roof work, including the disputed work, occurs
above the roof membrane. Stressing that work on roof-
tops is highly dangerous, Roofers testified that its mem-
bers go through an intensive 5-year apprenticeship pro-
gram to perform work on roofs, including the installation
of roof systems that will be used for rooftop gardens. On
this record, we find that employees represented by each
of the three unions have the skills and training necessary
to perform the work in question. This factor, therefore,
does not favor an award of the disputed work to either
group of employees.
5. Economy and efficiency of operations
Record evidence shows that using employees repre-
sented by Operating Engineers and Teamsters instead of
Roofers will prevent idle time since these employees
have the skills and experience required to perform all
aspects of the work under the Middle School and High
School subcontracts. Assigning the disputed work to
employees represented by Roofers will result in idle time
while the Employer’s employees wait for employees
represented by Roofers to perform their discrete and lim-
ited portion of the subcontracted work. Moreover, the
Employer’s employees also perform the preparatory and
post-installation work, such as plant care, watering, and
soil grading, all work that Roofers does not claim. Fur-
ther increasing the efficiency of the existing arrange-
ment, the Employer’s equipment operators double as
plantsmen when there are no tasks requiring landscape
equipment operation. We therefore find that the factor of
economy and efficiency of operations favors an award of
the work in dispute to employees represented by Operat-
ing Engineers and Teamsters.
15 Roofers attaches great significance to the Employer’s lack of a
roofing license. However, the disputed work is of a landscaping and
not a roofing nature.
6. Prior jurisdictional dispute determinations
Roofers contends that prior jurisdictional dispute de-
terminations indicate that an award of the work in the
instant case should be made to employees that it repre-
sents. Roofers points out that it has been awarded the
installation of preplanted roof trays in the past in arbitra-
tions pursuant to the JCB procedure. However, these
determinations did not involve the Employer or Team-
sters. Additionally, arbitrators’ jurisdictional dispute de-
cisions do not bind the Board, as a contrary Section 10(k)
Board award of work will supersede an arbitrator’s deci-
sion.16 Thus, we find that this factor does not favor an
award of the disputed work to either group of employees.
Conclusion
After considering all of the relevant factors, we con-
clude that employees represented by the Operating Engi-
neers and Teamsters are entitled to perform the work in
dispute. We reach this conclusion by relying on the fac-
tors of Board certification and collective-bargaining
agreements, employer preference and past practice, area
and industry practice, and economy and efficiency of
operations. In making this determination, we are award-
ing the work to employees represented by Operating En-
gineers and Teamsters, and not to those unions or its
members. The determination is limited to the contro-
versy that gave rise to this proceeding.
DETERMINATION OF DISPUTE
The National Labor Relations Board makes the follow-
ing Determination of Dispute.
Employees of Paul F. Pedersen Company d/b/a Peder-
sen Company, represented by International Union of Op-
erating Engineers, Local 150, and International Brother-
hood of Teamsters, Local 703, are entitled to perform all
of the work in dispute at the Southwest Area Middle
School and Benito Juarez High School jobsites in Chi-
cago, Illinois.
Dated, Washington, D.C. November 27, 2009
Wilma B. Liebman, Chairman
Peter C. Schaumber, Member
(SEAL) NATIONAL LABOR RELATIONS BOARD
16 Miron Construction Co. v Operating Engineers Local 139, 44
F.3d 558, 564 (7th Cir. 1995).