356 NLRB 760
Glaziers District Council 16 (MALV, dba Service West)
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
760
Glaziers District Council 16 and San Francisco Build-
ing Trades Council and MALV, Inc., d/b/a Ser-
vice West and Carpenters 46 Northern Califor-
nia Counties Conference Board. Cases 20–CD–
750 and 20–CD–751
March 1, 2011
DECISION AND DETERMINATION OF DISPUTE
BY CHAIRMAN LIEBMAN AND MEMBERS PEARCE
AND HAYES
This is a jurisdictional dispute proceeding under Sec-
tion 10(k) of the National Labor Relations Act. MALV,
Inc. d/b/a Service West (the Employer) filed charges on
July 26, 2010, alleging that the Respondents, Glaziers
District Council 16 (the Glaziers), and San Francisco
Building Trades Council (the Trades Council) violated
Section 8(b)(4)(D) of the Act by engaging in proscribed
activity with an object of forcing the Employer to assign
certain work to employees represented by Glaziers rather
than to employees represented by Carpenters 46 North-
ern California Counties Conference Board (the Carpen-
ters). The hearing was held on September 3 and 7, 2010,
before Hearing Officer Scott M. Smith. The Employer
and the Trades Council filed posthearing briefs.
The National Labor Relations Board has delegated its
authority in this proceeding to a three-member panel.
The Board affirms the hearing officer’s rulings, find-
ing them free from prejudicial error. On the entire rec-
ord, the Board makes the following findings.
I. JURISDICTION
The Employer, a California corporation, is engaged in
the business of installing modular furniture. The Em-
ployer’s principal place of business is in San Leandro,
California. During a 12-month period preceding the
hearing, the Employer purchased and received goods and
services valued in excess of $50,000 directly from points
outside the State of California. We find that the Em-
ployer is engaged in commerce within the meaning of
Section 2(6) and (7) of the Act and that the Glaziers, the
Trades Council, and the Carpenters are labor organiza-
tions within the meaning of Section 2(5) of the Act.
II. THE DISPUTE
A. Background and Facts of Dispute
The Employer operates within the construction indus-
try in Sacramento, South San Francisco, San Leandro,
and Anaheim, California. It specializes in the installation
of demountable walls, which are office walls set on a
track system which may be disassembled and moved
from one location to another without doing any harm to
the building.
The Employer is a member of a multiemployer bar-
gaining group, the Modular Installers Association (Asso-
ciation). Since 1982, the Employer has been signatory to
the Carpenters Master Agreement for Northern Califor-
nia and its Office Modular Systems Addendum. The
current contract expires on June 30, 2012 (Carpenters
Agreement). The Employer has approximately 150 Car-
penters-represented employees. They have performed all
of the Employer’s demountable wall installations, 95
percent of which have used glass panel partitions.
During March 2010,1 the Employer began installing
glass partitioned demountable wall systems at 555 Mis-
sion Street in San Francisco for the Silicon Valley Bank
(555 Mission project). The Employer was the subcon-
tractor of MG West, the project’s furniture subcontractor.
The Employer assigned the installation work to employ-
ees represented by the Carpenters. Sometime in late
March, MG West Project Manager Troy Good received a
telephone call from Glaziers’ business manager, Doug
Christopher, and Glaziers’ representative, Mark Shelley.
Both men claimed that the work the Employer had as-
signed to employees represented by the Carpenters
should be performed by employees represented by the
Glaziers. Good suggested that the two men settle the
issue with the Carpenters, but Christopher said that the
Glaziers planned to take unspecified actions against Sili-
con Valley Bank. Adam Chelini, project executive for
Skyline Construction, the general contractor for the 555
Mission project, testified that he received a telephone call
from an unidentified Glaziers’ agent who demanded that
the work at issue be performed by employees represented
by the Glaziers.
On April 1, the Glaziers began demonstrating at the
555 Mission project. The demonstrators patrolled while
carrying two large banners with the slogan: “Shame on
you Silicon Valley Bank.” They shouted the same words
with the additional statement: “You are taking food off
of our tables,” and they distributed flyers with the same
message and another additional statement: “This is a
public service message brought to you by District Coun-
cil 16 [Glaziers]. We are not asking any individual to
cease performing service, or to refuse to pick up or deliv-
er.” Because of the demonstrations, the Employer
stopped performing the work during the day and began
doing the work at night for the duration of the project.
The Employer also filed unfair labor practice charges
against the Glaziers alleging that it was engaging in un-
lawful jurisdictional picketing and secondary activity at
the 555 Mission project. The demonstrations continued
on April 2, 5, and 19.
1 All dates are in 2010, unless otherwise indicated.
356 NLRB No. 105
GLAZIERS DISTRICT COUNCIL 16 (SERVICE WEST)
761
On April 8, the Employer received a letter from the
Glaziers accusing it of not meeting area standards in the
payment of wages and benefits for the disputed work.
On April 12, the Employer denied this. On April 13, the
Glaziers sought and obtained sanction for area standards
picketing against the Employer from the Trades Council,
over the objections of the Carpenters.2
In June, Glaziers Director of Organizing John Sherak
met with Carpenters Director of Organizing Jay Brad-
shaw to discuss the dispute. At that meeting, Sherak
again asserted that the work in dispute should be per-
formed by the Glaziers.
On or about July 20, the Employer began installing
glass partitioned demountable wall systems at 101 Cali-
fornia Street in San Francisco (101 California project).
The Employer again assigned the work to employees
represented by the Carpenters. The wages and benefits
package received by these employees exceeded that pro-
vided to employees represented by the Glaziers. On July
21, the Glaziers began picketing at the 101 California
project. About 20 to 30 picketers carried signs that stat-
ed that the Employer was “unfair” to the Glaziers be-
cause it did “NOT MEET AREA WAGES AND
BENEFITS.” The signs also stated that this was not an
effort to organize workers and that the picketing was
sanctioned by the Trades Council. In order to avoid the
picketing, the Employer again stopped performing the
work during the day and performed it at night until the
project was completed in late July or early August. The
Employer also filed the charges in this 10(k) proceeding
against both the Glaziers and the Trades Council.
Subsequently, at the Employer’s Graylock project in
Menlo Park (Graylock project), an unidentified Glaziers’
agent visited the jobsite and demanded that employees
represented by the Glaziers perform the installation there
of glass partitioned demountable wall systems. Again,
the Employer had employees represented by the Carpen-
ters cease performing the work during the day and com-
mence performing it at night for the duration of the pro-
ject. In September, the Glaziers again accused the Em-
ployer of failing to meet area standards but the Employer
demonstrated that its $61.40 wages and benefits package
was in excess of the Glaziers’ $61.35 wages and benefits
package.
2 Adrian Simi, a Carpenters’ field representative, testified that at the
April 13 meeting, the Glaziers asserted, in support of its requested
sanction for area standards picketing, that the work “should be Glaziers
work.” The Carpenters’ representatives at the meeting informed the
Trades Council “[t]hat the Carpenters were in fact making more than
the Glaziers doing the same work,” and that “the Carpenters had been
doing this type of work for 30 years and it’s always been our work. It’s
never been the work of Glaziers . . . what they’re trying to do is raid our
work.”
B. Work in Dispute
The work in dispute is the installation of demountable
floor-to-ceiling wall systems with glass partitions.
C. Contentions of the Parties
The Employer contends that there are competing
claims for the work in dispute, that there is reasonable
cause to believe that the Glaziers and the Trades Council
violated Section 8(b)(4)(D), and that there is no agreed-
upon voluntary method to adjust the dispute. On the
merits of the dispute, the Employer contends that the
factors of collective-bargaining agreements, employer
preference, past practice, area and industry practice, rela-
tive skills and training, and economy and efficiency of
operations favor awarding the disputed work to employ-
ees represented by the Carpenters. The Employer seeks a
broad jurisdictional award applicable to the Employer’s
current and future projects in the San Francisco Bay area.
The Glaziers did not appear at the hearing and has not
filed a position statement. However, the Trades Council
contends that the Board should quash the notice of hear-
ing as to it on the ground that its sanction of area stand-
ards picketing by the Glaziers is “too slender a reed”
upon which to subject it to this 10(k) proceeding. The
Trades Council submits that it did not act as the Glaziers’
agent, that it was only aware of the Glaziers intention to
engage in area standards picketing, that it did not partici-
pate in the Glaziers’ picketing in any way, and that there-
fore the notice of the 10(k) hearing should be quashed at
least as to the Trades Council.
D. Applicability of the Statute
Before the Board may proceed with determining a dis-
pute pursuant to Section 10(k) of the Act, there must be
reasonable cause to believe that Section 8(b)(4)(D) of the
Act has been violated. This standard requires finding
that there is reasonable cause to believe that there are
competing claims to the disputed work between rival
groups of employees and that a party has used proscribed
means to enforce its claim to the work in dispute.3 Addi-
tionally, the Board will not proceed under Section 10(k)
if there is an agreed-upon method for voluntary adjust-
ment of the dispute.4 For the reasons stated below, we
find that this dispute is properly before the Board for
determination under Section 10(k).
Glaziers’ business manager, Christopher, Representa-
tive Shelley, and Director of Organizing Sherak all
claimed at various times that the work in dispute should
be performed by employees represented by the Glaziers.
3 Carpenters Local 624 (T. Equipment Corp.), 322 NLRB 428, 429
(1996).
4 See, e.g., Electrical Workers Local 3 (Slattery Skanska, Inc.), 342
NLRB 173, 174 (2004).
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
762
These claims, together with the Employer’s assignment
of the work in dispute to employees represented by the
Carpenters, are sufficient to establish reasonable cause
that there are competing claims to the disputed work.5
We further find reasonable cause to believe that the
Glaziers has used proscribed means to enforce its claim
for the disputed work by picketing at the 101 California
project. This is so even though the Glaziers’ picket
signs protested the Employer’s alleged failure to pay
areas standards wages and benefits for employees per-
forming the work in dispute, and picketing to enforce
area standards is permissible under Section 8(b)(4)(D).6
However, even where one object of picketing is to pro-
tect area standards, if the evidence shows reasonable
cause to believe that another object of the picketing is to
obtain the disputed work, that is sufficient to bring the
union’s conduct within the ambit of Section 8(b)(4)(D).7
While the Glaziers sought and obtained the Trades
Council’s sanction for area standards picketing at an
April 13 meeting, according to testimony by Carpenters
Representative Simi, the Glaziers asserted at that meeting
that the work “should be Glaziers work.”8 The Glaziers
repeated its claim to the work in dispute in a meeting
with the Carpenters on June 9, only a few weeks before
the picketing commenced. Given the Glaziers' repeated
claims to the work in dispute, we find reasonable cause
to believe that an object of this picketing was to force or
require the Employer to reassign the disputed work to
employees represented by the Glaziers.9
By contrast, we find that there is not reasonable cause
to believe that the Trades Council has violated Section
8(b)(4)(D). Its involvement was limited to approving the
Glaziers’ request to engage in area standards picketing,
which was lawful. At that time, it appears that the
Trades Council knew only that there were competing
claims to the work by the Glaziers and the Carpenters,
and that there were conflicting claims over whether the
Employer was complying with area standards. This pro-
vides no basis on which to find reasonable cause to be-
5 Electrical Workers Local 134 (Pepper Construction Co.), 339
NLRB 123, 125 (2003).
6 Sheet Metal Workers Local 19 (E. P. Donnelly, Inc.), 345 NLRB
960, 962 (2005).
7 Id.
8 Also at that meeting, the Carpenters stated that its wages and bene-
fits exceeded those paid to the Glaziers.
9 Electrical Workers Local 134 (Pepper Construction Co.), supra,
339 NLRB at 125 (an object of purported area standards picketing was
assignment of work where union asserted claims to work prior to pick-
eting, which occurred even after assurances employer would meet area
standards); Sheet Metal Workers Local 19 (E. P. Donnelly, Inc.), supra,
345 NLRB at 962 (statements by picketing union to competing union
and to employees claiming work established unlawful jurisdictional
objective despite disclaimer and use of area standards message).
lieve that the Trades Council knew that an object of the
picketing would be to obtain the disputed work or that
the Employer in fact was complying with area standards.
Further, although the Glaziers’ picket signs stated that
the picketing was sanctioned by the Trades Council,
there is no evidence that any agents of the Trades Coun-
cil directly participated in the Glaziers' picketing. Com-
pare Laborers Local 89 (San Diego Zoological Society),
198 NLRB 129, 130 (1972) (no allegation that council
was liable where it sanctioned picketing) with Boiler-
makers Local 6 (Pacific Far East Lines), 224 NLRB 222,
223 fn. 2 (1976) (council liable where it both sanctioned
and participated in picketing); Carpenters Local 1102
(Don Cartage Co.), 160 NLRB 1061, 1069 (1966)
(same). Last, the Trades Council did not represent em-
ployees doing the disputed work and itself made no
claim to the disputed work. Nor is there any evidence
that would suggest that the Trades Council joined the
Glaziers in its claim to the disputed work. In those cir-
cumstances, we grant the Trades Council’s request to
quash the notice of hearing with regard to it.10
We also find that no agreed-on method exists for vol-
untarily resolving the dispute. It is well settled that all
parties to the dispute must be bound if an agreement is to
constitute “an agreed method of voluntary adjustment.”
Operating Engineers Local 150 (R&D Thiel), 345 NLRB
1137, 1140 (2005). In order to determine if the parties
are bound, the Board carefully scrutinizes the agreements
at issue. See, e.g., Elevator Constructors Local 2 (Kone,
Inc.), 349 NLRB 1207, 1209–1210 (2007); Sheet Metal
Workers Local 292 (Gallagher-Kaiser Corp.), 264
NLRB 424, 428–430 (1982). The Carpenters Agreement
requires that jurisdictional disputes “be settled by the
Unions themselves, or submitted to the International
Presidents of the Unions involved in the dispute, for de-
termination.” The current Northern California Glaziers
Master Agreement between the Glaziers and the North-
ern California Glass Management Association (Glaziers
Agreement) has no specific provision covering jurisdic-
tional disputes. Accordingly, the Carpenters and the
Glaziers are not bound to a common provision for the
resolution of jurisdictional disputes.
Based on these facts, we find reasonable cause to be-
lieve that there are competing claims to the disputed
work, that Section 8(b)(4)(D) has been violated by the
Glaziers, and that there is no agreed-upon voluntary
method to adjust the dispute. Accordingly, we find that
Section 10(k) is applicable, and that the dispute is
properly before the Board for determination.
10 Member Hayes would find that the evidence is sufficient to estab-
lish reasonable cause to believe that the Trades Council violated Sec.
8(b)(4)(D).
GLAZIERS DISTRICT COUNCIL 16 (SERVICE WEST)
763
E. Merits of the Dispute
Section 10(k) requires the Board to make an affirma-
tive award of disputed work after considering various
factors. NLRB v. Electrical Workers Local 1212 (Co-
lumbia Broadcasting), 364 U.S. 573, 577 (1961). The
Board has held that its determination in a jurisdictional
dispute is an act of judgment based on common sense
and experience, reached by balancing the factors in-
volved in a particular case. Machinists Lodge 1743 (J. A.
Jones Construction), 135 NLRB 1402 (1962).
The following factors are relevant in making the de-
termination of this dispute.
1. Collective-bargaining agreements
The Employer has been signatory to the Carpenters
Agreement since 1982. The Employer has not been sig-
natory to the Glaziers Agreement during that time. The
Carpenters Agreement specifically covers “handling,
installation, removal, relocation and maintenance of all
new or used free standing manufactured modular office
furniture systems . . . raised flooring systems, demounta-
ble floor to ceiling wall systems/partitions.” Therefore,
the factor of collective-bargaining agreements favors an
award to employees represented by the Carpenters. See
Electrical Workers Local 103 (Lucent Technologies),
333 NLRB 828, 830 (2001).11
2. Employer preference, current assignment,
and past practice
The Employer prefers that the work in dispute contin-
ue to be assigned to employees represented by the Car-
penters in accord with a consistent past practice dating
back to 1982. There is no evidence that the Employer
has previously assigned the work in dispute to employees
represented by the Glaziers. We find that the factors of
employer preference, current assignment, and past prac-
tice favor awarding the disputed work to employees rep-
resented by the Carpenters. See Sheet Metal Workers
Local 19 (E. P. Donnelly, Inc.), 345 NLRB 960, 963
(2005).
3. Area practice
Mark Vignoles, the Employer’s president, testified that
100 percent of the union contractors in the San Francisco
Bay area were signatory to the Carpenters Agreement.
Good testified that in his 13 years in the business, the
disputed work had always been performed by employees
11 The Employer entered into the Carpenters Agreement under the
provisions of Sec. 8(f) of the Act that permit parties in the construction
industry to establish bargaining relationships without a showing of
majority employee support for the union. Since approximately 1992,
the Employer has recognized the Carpenters as a majority representa-
tive under Sec. 9(a). The change in the Carpenters’ representative
status has no effect on our determination of the merits of the dispute.
represented by the Carpenters. Michael Vlaming, the
Association’s executive director, testified that all the
members of the Association used employees represented
by the Carpenters to perform the disputed work. He was
unaware of any employer who used employees repre-
sented by the Glaziers to perform the disputed work.
There is no evidence that any employer in the San
Francisco Bay area has assigned work similar to that in
dispute to employees represented by the Glaziers. Ac-
cordingly, we find that the factor of area practice favors
an award of the disputed work to employees represented
by the Carpenters. See Elevator Constructors Local 2
(Kone, Inc.), supra, 349 NLRB at 1210.
4. Relative skills and training
Vignoles testified that employees attend training with
the manufacturers of the demountable floor to ceiling
wall systems with glass partitions and thereby gain facto-
ry certification for their work. The trained employees
then teach the other employees how to handle the specif-
ic products. Vignoles also noted that the employees rep-
resented by the Carpenters are excellent at layout by vir-
tue of being carpenters. This is the paramount skill re-
quired for the disputed work. The glass is preassembled
and requires no cutting and seaming. Good testified that
employees represented by the Carpenters have superior
training and skills to handle the “mitered corners . . . de-
tailed measurements, cuts, quite a bit of aluminum and
wood work.” Vlaming testified that the continual prac-
tice with installing the disputed work enhanced the skill
set of the employees represented by the Carpenters. He
stated that “it takes a special skill and particular training
to install the floor-to-ceiling product . . . you work with
your more experienced installers. They sort of work
their way up, the skill set . . . and sophistication in in-
stalling systems. . . . So, it takes different skills and it
takes . . . a crew of employees to do this work. That’s all
they do.” There is no evidence concerning the skills and
training of employees represented by the Glaziers. Ac-
cordingly, we find that this factor favors an assignment
of the work to employees represented by the Carpenters.
See Machinists District Lodge 160 (SSA Marine), 347
NLRB 549, 552 (2006).
5. Economy and efficiency of operations
Vignoles testified that it would slow the disputed work
considerably “to bring in somebody just to do a piece of
glass.” He testified that his team of employees repre-
sented by the Carpenters worked efficiently because they
would “have worked together quite a long time . . . they
can work sequentially . . . if you have to bring in a sub-
contractor . . . you’re waiting for him to finish his part
. . . . It’s very inefficient. . . . Because we’d have to build
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
764
the frame, then schedule in somebody else to put the
glass in. We’d send our frame crew someplace else, and
then they’d put the glass in, then we’d bring the frame
crew back to trim out the job . . . we would lose a day,
two days.” Good testified that superintendents from two
of the general contractors with whom MG West frequent-
ly worked told him that it was essential the employees
represented by the Carpenters rather than employees rep-
resented by the Glaziers perform the disputed work. This
was so because employees represented by the Glaziers
“were less adept at building the system than the Carpen-
ters would be . . . the Glaziers moved extremely slow.”
Vlaming testified that subcontracting to a separate group
is never efficient, but rather “if all of your employees
have been trained in this, and all of your employees are
members of one union, it’s much more efficient to have
them do all of the work . . . de-mountable floor-to-ceiling
partition installation work . . . isn’t on every project.
And that work isn’t the entirety of every job. And so to
the extent that you can use them to do that work, and
then if you’re still performing some open space cubicle
work, you can roll them right over to that other work,
that’s very efficient and that’s the way you’d want to run
your business.”
Based on the uncontroverted testimony presented by
the Employer’s witnesses, we find that the factor of
economy and efficiency of operations favors awarding
the disputed work to employees represented by the Car-
penters. See Carpenters Local 62 (Homebase, Inc.), 311
NLRB 984, 986 (1993).
Conclusion
After considering all the relevant factors, we conclude
that employees represented by the Carpenters are entitled
to continue performing the work in dispute. We reach
this conclusion relying on the factors of the Carpenters
Agreement, employer preference, current assignment and
past practice, area practice, relative skills and training,
and economy and efficiency of operations. In making
this determination, we award the work to employees rep-
resented by the Carpenters, not to that labor organization
or to its members.
Scope of Award
The Employer has requested that our award encompass
not just the 101 California project, where the work has
already concluded, but all the Employer’s future projects
in the San Francisco Bay Area. “Normally, 10(k) awards
are limited to the jobsites where the unlawful 8(b)(4)(D)
conduct occurred or was threatened.” Carpenters (Prate
Installations, Inc.), 341 NLRB 543, 546 (2004). For the
Board to issue a broad award, two prerequisites must be
met—there must be: “(1) evidence that the disputed work
has been a continuous source of controversy in the rele-
vant geographic area and that similar disputes may recur;
and (2) evidence demonstrating the offending union’s
proclivity to engage in further unlawful conduct in order
to obtain work similar to that in dispute.” Id. When
evaluating these prerequisites, the Board looks to the
offending union’s other conduct. See Electrical Workers
Local 98 (Lucent Technology), 338 NLRB 1118, 1122
(2003); Electrical Workers Local 98 (Swartley Bros. En-
gineers), 337 NLRB 1270, 1273 (2002).
The Employer relies on conduct by the Glaziers at the
555 Mission project and at the Greylock project in sup-
port of its contention that a broad order is warranted
here. However, even assuming that this evidence is suf-
ficient to show that the disputed work has been a con-
tinuing source of controversy and is likely to recur, there
is no previous 10(k) determination by the Board involv-
ing an attempt by the Glaziers to force the assignment of
this work to employees it represents. Thus, there is no
evidence that the Glaziers have a proclivity to use pro-
scribed means to obtain work similar to the work in dis-
pute.12 Accordingly, we conclude that a broad award is
inappropriate and our determination is limited to the con-
troversy that gave rise to this dispute.
DETERMINATION OF DISPUTE
The National Labor Relations Board makes the follow-
ing Determination of Dispute.
1. Employees of MALV, Inc., d/b/a Service West rep-
resented by Carpenters 46 Northern California Counties
Conference Board are entitled to perform the installation
of demountable floor-to-ceiling wall systems with glass
partitions on the Employer’s 101 California jobsite in
San Francisco, California.
2. Glaziers District Council 16 is not entitled by means
proscribed by Section 8(b)(4)(D) of the Act to force
MALV, Inc., d/b/a Service West to assign the work to
employees represented by them.
3. Within 14 days from this date, Glaziers District
Council 16 shall notify the Regional Director for Region
20 in writing whether it will refrain from forcing MALV,
Inc., d/b/a Service West, by means proscribed by Section
8(b)(4)(D), to assign the disputed work in a manner in-
consistent with this determination.
12 See, e.g., Electrical Workers Local 3 (Slattery Slanska), supra,
342 NLRB at 177.