356 NLRB 835
Atlantic Scaffolding
ATLANTIC SCAFFOLDING CO.
835
Atlantic Scaffolding Company and United Brother-
hood of Carpenters and Joiners of America, Lo-
cal 502. Case 16–CA–26108
March 18, 2011
DECISION AND ORDER
BY CHAIRMAN LIEBMAN AND MEMBERS PEARCE
AND HAYES
On October 5, 2009, Administrative Law Judge Mar-
garet G. Brakebusch issued the attached decision. The
General Counsel filed exceptions and a supporting brief,
and the Respondent filed an answering brief to the Gen-
eral Counsel’s exceptions.
The National Labor Relations Board has delegated its
authority in this proceeding to a three-member panel.
The Board has considered the decision and the record
in light of the exceptions and briefs and has decided to
affirm the judge’s rulings, findings,1 and conclusions
only to the extent consistent with this Decision and Or-
der.
The complaint alleges that the Respondent violated
Section 8(a)(1) of the Act by discharging employees for
engaging in a work stoppage over a pay raise. The judge
dismissed the complaint, finding that the employees’
work stoppage, while protected at its inception, lost its
protection “at some point in time.” We disagree. As ex-
plained below, the employees’ work stoppage was a pro-
tected concerted action in support of their demand for
higher wages, and it did not interfere with the Respond-
ent’s use of its property. Accordingly, the Respondent
violated the Act by discharging the employees on March
19, 2008, for engaging in the work stoppage.
I
The relevant facts are fully set forth in the judge’s de-
cision. Briefly, the Respondent contracted with Exx-
onMobil to perform scaffolding work at its refinery dur-
ing a maintenance “turnaround.” During these turna-
rounds, individual refinery units are shut down to under-
go inspections and various maintenance procedures.
ExxonMobil imposed a strict deadline for the turnaround
work in order to minimize its loss of revenue during this
period. The Respondent employed 240–250 employees
1 In the absence of exceptions, we adopt the judge’s finding that the
Respondent’s foremen on the ExxonMobil turnaround project did not
function as supervisors within the meaning of Sec. 2(11) of the Act.
The General Counsel has excepted to some of the judge’s credibility
findings. The Board’s established policy is not to overrule an adminis-
trative law judge’s credibility resolutions unless the clear preponder-
ance of all the relevant evidence convinces us that they are incorrect.
Standard Dry Wall Products, 91 NLRB 544 (1950), enfd. 188 F.2d 362
(3d Cir. 1951). We have carefully examined the record and find no
basis for reversing the findings.
for the turnaround, and there were approximately 1000
other employees on the project employed by other con-
tractors. The turnaround started on March 17, 2008.2
A few days prior to the starting date, the Respondent’s
employees learned that it was converting a rumored raise
for work performed on the refinery project to an incen-
tive bonus, which they could lose for attendance and
safety reasons or for failing to remain in the Respond-
ent’s employ for the duration of the project. On Sunday,
March 16, employees prepared and signed a letter de-
manding, among other things, an increase in pay, and per
diem rate. At around 6:55 a.m. on March 17, approxi-
mately 100 of the Respondent’s employees gathered out-
side the lunch tent at ExxonMobil’s refinery and present-
ed the letter to the Respondent’s turnaround supervisor,
David Wall. They included both day-shift employees,
whose shift had just started, and night-shift employees,
who remained in the facility after their shift ended at 5
a.m. to demonstrate their support. The Respondent’s
managers discussed the demands with the employees,
and asked them to return to work while the demands
were under consideration. The employees refused. Wil-
liam Swango, ExxonMobil’s turnaround department
head, became aware of the situation and ordered the em-
ployees to be transported by bus from outside the lunch
tent to the facility’s parking lot, because their refusal to
work while remaining inside the refinery area could pre-
sent a safety issue.
The employees promptly complied with this directive,
and began leaving the work area at about 8:16 a.m.
aboard ExxonMobil buses to go to ExxonMobil’s park-
ing lot. As the employees exited the gate leading to the
parking lot, their ID badges and H2S (hydrogen sulfide)
monitors were collected, as required by ExxonMobil’s
safety procedures.
The employees continued to discuss their pay demands
with the Respondent’s supervisors in the parking lot.
Victor Corral, the Respondent’s general foreman,3 testi-
fied that Wall told him that the Respondent wanted the
employees to come back to work. Dylan Fulton, the Re-
spondent’s site manager, testified that he went to the
parking lot to try to negotiate with the employees. He
testified that he urged the employees “to please come
2 Unless otherwise noted, all dates are in 2008.
3 The General Counsel excepts to the judge’s failure to find that
General Foreman Victor Corral was a statutory supervisor. We find
merit to this exception because the parties stipulated at the hearing that
the Respondent’s general foremen are supervisors within the meaning
of Sec. 2(11) of the Act. Thus, we find that Victor Corral was a statuto-
ry supervisor.
356 NLRB No. 113
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
836
back to work.”4 After the employees had been in the
parking lot for over an hour, ExxonMobil security told
the employees that they had to leave ExxonMobil proper-
ty. Some of the employees then left the scene, while the
rest moved to a vacant lot across the street from the re-
finery.
At the vacant lot, the Respondent continued to speak
with the remaining employees about their pay demands
and tried to persuade them to return to work. These ef-
forts were unsuccessful, however, and the Respondent’s
officials left the vacant lot and returned through the re-
finery gate at 12:07 p.m.5 Thereafter, ExxonMobil secu-
rity and the police asked the employees to leave the va-
cant lot because it too was ExxonMobil’s property. The
employees promptly complied and went to a public park
where they contacted a representative of the Union.
At the time of the work stoppage, the Respondent’s
employees were not represented by a labor organization
and the Respondent did not have a formal grievance pro-
cedure.
On March 17 and 18, a few of the day-shift employees
returned to work.6 There is no indication in the record
that any of the other strikers indicated to the Respondent
that they had quit or otherwise abandoned their jobs dur-
ing that time. On March 19, the Respondent sent separa-
tion notices to 77 employees who had engaged in the
work stoppage and not returned to work, discharging
them assertedly for job abandonment.
II.
In dismissing the complaint, the judge found that the
General Counsel did not establish under Wright Line7
that the employees’ work stoppage was a motivating fac-
tor in their discharges. Instead, the judge found that the
4 While in the parking lot, night crew employees were returned their
badges. The respondent also made arrangements for the return of em-
ployees’ own work tools to those employees who requested them.
5 At 3:42 p.m., Fulton sent Swango an email with a list of employees
who participated in the work stoppage and who were being turned into
ExxonMobil security for “nonentry” classifications for ExxonMobil
facilities. In the email, Fulton stated that a large majority of the em-
ployees were in favor of coming back in if the entire group was al-
lowed, but the Respondent “was firmly against allowing the organizers
reentry under any circumstances.”
After ExxonMobil placed employees who engaged in the work stop-
page on its “denied entry” list for its facilities, ExxonMobil agreed to a
settlement with the Board in Case 16–CA–26241. Pursuant to the
settlement, ExxonMobil posted a “Notice to Employees” stating that
ExxonMobil “will not place any employees’ names on [its] denied
entry list in retaliation for the employees’ protected concerted and/or
union activities.” Additionally, ExxonMobil agreed to remove the
names of specified employees from its denied entry list.
6 All of the night-shift workers returned for their next shift follow-
ing the start of the work stoppage.
7 251 NLRB 1083, enfd. 662 F.2d 899 (1st Cir. 1981), cert. denied
455 U.S. 989 (1982).
facts were similar to those presented in Quietflex Mfg.
Co., 344 NLRB 1055 (2005), where the Board found that
an employer did not violate Section 8(a)(1) by dismissing
83 employees who engaged in a peaceful 12-hour work
stoppage in its parking lot, and refused to leave the prem-
ises until the police were summoned. According to the
judge, the employees here were engaged in protected
concerted activity when they presented their letter to the
Respondent on the morning of March 17, but their work
stoppage lost the protection of the Act “at some point in
time and prior to [their] termination on March 19.” The
judge did not explain the loss of protection finding, but
elsewhere in her opinion concluded that the Respondent
issued the separation notices on March 19 “because there
was no indication that the employees were going to re-
turn to work.”
The General Counsel excepts, arguing that the work
stoppage remained protected activity, and that the Re-
spondent terminated the employees for that protected
activity. We find merit to the General Counsel’s excep-
tions, and reverse the judge’s dismissal of the complaint
for the reasons set forth below.8
III.
A.
At the outset, we find that the judge erred in finding
that “at some point in time” the employees’ work stop-
page lost the protection of the Act. The judge gave no
explanation for this finding, and the record reveals no
evidence of any employee misconduct that would cause
the work stoppage to lose the Act’s protection. Indeed,
the work stoppage was peaceful at all times, there was no
attempt to deny anyone access to the property, and the
employees promptly complied with every request to
move their protest elsewhere.
The Respondent nonetheless contends that this peace-
ful work stoppage should be deemed unprotected be-
cause the employees’ absence from their jobs interfered
with the ability of nearly 1000 employees of other con-
tractors to accomplish their work, citing Waco, Inc., 273
NLRB 746 (1984), Cambro Mfg. Co., 312 NLRB 634
(1993), and Quietflex Mfg. Co., supra. Those cases do
not support the Respondent’s position. They addressed
situations where employees, in the course of protected
activity, occupied their employer’s property in the face of
8 We agree with the judge, for the reasons she cites, that the Re-
spondent did not terminate any employees on March 17. The judge
found, however, and the Respondent does not dispute, that on March 19
the Respondent terminated employees who engaged in the work stop-
page and had not returned to work. Because the complaint alleges that
the Respondent discharged employees “on or about” March 17, a find-
ing that the employees were discharged on March 19 is well within the
scope of the complaint.
ATLANTIC SCAFFOLDING CO.
837
the employer’s order to leave and deprived the employer
of the use of its property for an unreasonable period of
time. The Board recognized in Quietflex, relying on
Cambro, supra at 635, that “at some point [in an on-site
work stoppage], an employer is entitled to exert its pri-
vate property rights and demand its premises back.” 344
NLRB at 1056. In those circumstances, the employees’
Section 7 right to engage in activity on the employer’s
property must be balanced against the employer’s assert-
ed private property rights. Id. at 1056–1058.9
Here, the facts are different. The employees complied
with each request to move the location of their concerted
protest. When they were directed to leave the work
premises and go to the parking lot, they complied. An
hour later, the employees were told they had to leave the
parking lot, and they promptly moved to a vacant lot
across the street. And about an hour after that, when the
employees were asked to leave the vacant lot because it
too was ExxonMobil’s property, they left and went to a
public park. Because there was no meaningful impair-
ment of property rights, there is nothing to balance
against the employees’ rights under the Act..
What remains of the Respondent’s argument is that the
work stoppage was timed to maximize its effect on the
refinery turnaround operations, and was therefore unpro-
tected because it was “extremely disruptive” of the abil-
ity of other subcontractors’ employees to begin work
scheduled for that day. Of course, the timing of the work
stoppage was at least partially the Respondent’s own
doing, because employees learned only a short time be-
fore March 17 that they would have to earn incentive
bonuses in lieu of the expected pay raise. In any event,
the same interference with work would have resulted if
the Respondent’s employees had immediately struck and
9 In Waco, the Board ruled that the employees “were occupying the
facility in a manner which was unprotected” because they continued to
occupy the employer’s premises for several hours after they had been
directed to leave if they were not returning to work and they failed at
any time during the occupation to “communicate to the Respondent the
particulars of their grievances so as to facilitate a discussion or possible
resolution of their concerns.” 273 NLRB at 746–747. In Cambro, the
Board stated that while “the employees were entitled to persist in their
in-plant protest for a reasonable period of time . . . [there came] a point
at which the Respondent was entitled to reclaim the use of its entire
premises.” 312 NLRB at 636. In Quietflex, the Board explained that
Waco and Cambro “seek to balance competing employer and employee
rights, focusing on the degree of impairment of the employees’ Section
7 rights if access is denied, compared to the degree of impairment of
the employer’s private property rights if access is granted.” 344 NLRB
at 1058 (citing Hudgens v. NLRB, 424 U.S. 507 (1976)). The Board
went on to articulate a 10-factor analysis for balancing the competing
rights in the context of an onsite work stoppage. Pursuant to that analy-
sis, employees who remained on the employer’s property for more than
8 hours after being asked to leave, dispersing only after the police were
called and arrived on the scene, lost the protection of the Act.
left the ExxonMobil property. Stripped to its bare essen-
tials, the Respondent’s argument is that the work stop-
page lost its protection because of the economic harm
inflicted on the Respondent. This argument is antithet-
ical to the basic principles underlying the statutory
scheme, i.e., the right of employees to withhold their
labor in seeking to improve their terms of employment,
and the use of economic weapons such as work stoppag-
es as part of the “free play of economic forces” that
should control collective bargaining. NLRB v. Nash-
Finch Co., 404 U.S. 138, 144 (1971). The protected na-
ture of the work stoppage in this case was not vitiated by
the effectiveness of its timing.
Even if a balancing of rights under the Quietflex stand-
ard were called for, application of the standard would
support a finding of a violation.10 The factors to be con-
sidered under Quietflex are (1) the reason the employees
have stopped working; (2) whether the work stoppage
was peaceful; (3) whether the work stoppage interfered
with production, or deprived the employer access to its
property; (4) whether employees had adequate opportuni-
ty to present grievances to management; (5) whether em-
ployees were given any warning that they must leave the
premises or face discharge; (6) the duration of the work
stoppage; (7) whether employees were represented or had
an established grievance procedure; (8) whether employ-
ees remained on the premises beyond their shift; (9)
whether the employees attempted to seize the employer’s
property; and (10) the reason for which the employees
were ultimately discharged. 344 NLRB at 1056–1057.
These factors, considered under the circumstances of
this case, favor a determination that the work stoppage
remained protected at all times relevant to the case. The
reason for the work stoppage, a protest over wages, clear-
ly is protected by Section 7. The work stoppage was
peaceful at all times and there was no cognizable inter-
10 Member Hayes believes that the presence of employees withhold-
ing their work anywhere on the property of their employer or the prop-
erty where their employer has contracted to work involves an impair-
ment of property rights and thus necessitates a balancing of those rights
with the employees’ Sec. 7 rights. For this reason, Quietflex sets out
numerous factors to consider “in determining which party’s rights
should prevail in the context of an on-site work stoppage.” 344 NLRB
at 1056 (emphasis added). This case involves an onsite work stoppage
and thus the Quietflex analysis applies here. Member Hayes disagrees
with his colleagues that the Quietflex test is limited to situations when
“employees, in the course of protected activity, occupied their employ-
er’s property in the face of the employer’s order to leave and deprived
the employer of the use of its property for an unreasonable period of
time.” The nature of the work stoppage (occupation “in the face of the
employer’s order to leave”) and its duration (“an unreasonable period”)
are to be considered as factors in the Quietflex analysis, not as prerequi-
sites to employing that analysis. Member Hayes thus disagrees with his
colleagues’ attempt to limit the Quietflex analysis to the circumstances
they describe. He concurs in finding a violation under Quietflex.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
838
ference with production. See Quietflex, supra at fn. 6.
(“It is not considered an interference of production where
the employees do no more than withhold their own ser-
vices”.) Nor was there any attempt to deny anyone ac-
cess to the property, or any challenge to the authority of
the Respondent or ExxonMobil to control the property.
As noted above, the employees were never warned that
they must leave or face discharge, instead, they promptly
complied with each directive they were given to move
from one location to another. The employees were un-
represented, there was no established grievance proce-
dure, and there was no attempt to seize the Respondent’s
(or ExxonMobil’s) property. The reason advanced by
the Respondent for the employees’ discharge likewise
favors protection, as the Respondent did not raise a con-
cern about property rights in notifying the employees of
their termination.
The fact that some night-shift employees stayed over
to join the onsite portion of the work stoppage, and the
approximately 5–1/2-hour duration of the work stoppage
might in some circumstances weigh against protection.
Here, however, the employees were in the lunch tent
within the refinery area for no more than 85 minutes be-
fore leaving for the parking lot, and never received, much
less defied, a directive to leave the premises if they did
not return to work. Instead, all employees involved in the
protest complied with each request to move their protest
elsewhere. Moreover, the onsite portion of the work
stoppage ended promptly after the discussions with the
Respondent over the employees’ demands had ended. In
these circumstances, we find that these two factors do not
favor loss of protection. At most, they are neutral.
We recognize that the employees here had an adequate
opportunity to present their grievances to management.
However, to the extent that this factor weighs against
protection under Quietflex, it is substantially outweighed
by the other factors discussed above. Therefore, applica-
tion of the Quietflex standard would strongly favor a
finding that the work stoppage remained protected at all
relevant times.
B.
We also find no merit to the judge’s finding that the
Respondent terminated the employees because there was
no indication they would return to work. Typically,
when an employer asserts that employees were dis-
charged because they would not return to work after
commencing a work stoppage, the assertion suggests that
the discharge was for engaging in the work stoppage
itself. See CGLM, Inc., 350 NLRB 974, 979–980
(2007), enfd. 280 Fed. Appx. 366 (5th Cir. 2008) (dis-
charge of striking employees—purportedly for not call-
ing in or showing up for work—amounted to a discharge
for the act of going on strike, and accordingly was un-
lawful); Anderson Cabinets, 241 NLRB 513, 518–519
(1979), enfd. 611 F.2d 1225 (8th Cir. 1979) (“Calling a
strike . . . an absence from work justifying discharge is to
write Section 13 [the right to strike] out of the Act.”). In
order to show that employees truly abandoned their jobs,
an employer must present “unequivocal evidence of in-
tent to permanently sever [the] employment relation-
ship.” L.B. & B. Associates, Inc., 346 NLRB 1025, 1029
(2006), enfd. 232 Fed. Appx. 270 (4th Cir. 2007) (cita-
tion and quotation omitted).
No evidence of job abandonment was presented here.
The evidence does not demonstrate that the employees’
work stoppage had ended—or that any employees had
voluntarily quit their jobs—before the termination notic-
es were issued on March 19. Indeed, the Respondent did
not even solicit any employees to return to work, much
less receive notice of a refusal to return to work, on
March 18 or 19.11 Accordingly, as there is no evidence
of employee job abandonment, the Respondent’s conten-
tion that it terminated the employees for this reason sup-
ports a finding that they were terminated for their partic-
ipation in the work stoppage. CGLM, Inc., supra.
We also find that the judge erred in analyzing the
8(a)(1) discharge allegations under Wright Line, supra.
Where, as here, employees are terminated for engaging
in a protected concerted work stoppage, Wright Line is
not the appropriate analysis, as the existence of the
8(a)(1) violation does not turn on the employer’s motive.
CGLM, Inc., supra at fn. 2 (rejecting application of
Wright Line to an allegation of discharging employees
who engaged in concerted work stoppage, where “the
very conduct for which employees are disciplined is it-
self protected concerted activity,” quoting Burnup &
Sims, Inc., 256 NLRB 965, 976 (1981)). Rather, when
the conduct for which the employees are discharged con-
stitutes protected concerted activity, “the only issue is
whether [that] conduct lost the protection of the Act be-
cause . . . [it] crossed over the line separating protected
and unprotected activity.” Phoenix Transit System, 337
NLRB 510, 510 (2002), enfd. mem. 63 Fed.Appx. 524
(D.C. Cir. 2003).12 As explained above, nothing in the
employees’ conduct caused them to lose the protection of
the Act.
11 Moreover, the Respondent’s job abandonment contention is un-
dermined by the fact that on March 17 it placed the employees’ names
on a list for a “denied entry” classification for ExxonMobil facilities.
12 See also Tamara Foods, Inc., 258 NLRB 1307, 1308 (1981),
enfd. 692 F.2d 1171 (8th Cir. 1982), cert. denied 461 U.S. 928 (1983)
(in finding that discharge of employees for engaging in a concerted
work stoppage violated Sec. 8(a)(1), the Board’s analysis focused ex-
clusively on whether work stoppage was protected).
ATLANTIC SCAFFOLDING CO.
839
In sum, we find that the record clearly establishes that
the Respondent discharged the employees for their par-
ticipation in a protected concerted work stoppage, and
that at no time did that work stoppage lose the protection
of the Act. Accordingly, the discharges violated Section
8(a)(1) as alleged.
AMENDED CONCLUSIONS OF LAW
1. The Respondent, Atlantic Scaffolding Co., is an
employer engaged in commerce within the meaning of
Section 2(2), (6), and (7) of the Act.
2. The Respondent violated Section 8(a)(1) of the Act
by discharging employees for engaging in protected con-
certed activity.
REMEDY
Having found that the Respondent has engaged in cer-
tain unfair labor practices, we shall order it to cease and
desist and to take certain affirmative action designed to
effectuate the policies of the Act. Specifically, having
found that the Respondent violated Section 8(a)(1) by
discharging employees because they engaged in protect-
ed concerted activity, we shall order the Respondent to
offer them full reinstatement to their former jobs or, if
those jobs no longer exist, to substantially equivalent
positions, without prejudice to their seniority or any oth-
er rights and privileges previously enjoyed, and to make
them whole for any loss of earnings and other benefits
suffered as a result of the discrimination against them.
Backpay shall be computed in accordance with F. W.
Woolworth Co., 90 NLRB 289 (1950), with interest at
the rate prescribed in New Horizons for the Retarded,
283 NLRB 1173 (1987), compounded daily as prescribed
in Kentucky River Medical Center, 356 NLRB 6
(2010).13 The Respondent shall also be required to re-
move from its files any and all references to the unlawful
discharges of these employees, and to notify them in
writing that this has been done and that the discharges
will not be used against them in any way.
It is undisputed that the Respondent sent separation
notices on March 19 to employees it believed engaged in
the work stoppage and had not returned to work. While
those notices are not in the record, Fulton’s March 19
email to Swango and other ExxonMobil representatives
13 In the complaint, the General Counsel sought compound interest
for all monetary relief awarded. On May 14, 2010, the Board solicited
amicus briefs in this case, and others, regarding whether the Board
should routinely order compound interest on backpay and other mone-
tary awards in unfair labor practice cases and, if so, what the standard
period should be for compounding. The Respondent filed a brief on
June 24, 2010, recommending continued application of simple interest
to backpay awards. On October 22, 2010, we issued our decision in
Kentucky River Medical Center, supra, announcing that interest on
backpay is to be compounded on a daily basis.
contained a list of 77 employees the Respondent termi-
nated because they engaged in the work stoppage and did
not return to work on March 18 or 19. We find that the
Respondent sent the March 19 notices to those 77 em-
ployees. Seventy three of those employees were includ-
ed in the complaint, and are thus encompassed by our
remedial order. There is no evidence that the Respond-
ent discharged the 30 additional employees named in the
complaint, and they accordingly are not entitled to rein-
statement or backpay.14
ORDER15
The National Labor Relations Board orders that the
Respondent, Atlantic Scaffolding Company, LaPorte,
Texas, its officers, agents, successors, and assigns, shall
1. Cease and desist from
(a) Discharging its employees for engaging in protect-
ed concerted activity.
(b) In any like or related manner interfering with, re-
straining, or coercing its employees in the exercise of the
rights guaranteed them by Section 7 of the Act.
2. Take the following affirmative action necessary to
effectuate the policies of the Act.
(a) Within 14 days from the date of this Order, offer
the following employees full reinstatement to their for-
mer jobs or, if those jobs no longer exist, to substantially
equivalent positions, without prejudice to their seniority
or any other rights or privileges previously enjoyed:
Juan Abarca
Emmanuel Gomez
Jose Rangel
Hector Acosta
Uriel Gracia16
Richard Reyna
Emilio Acosta
Tyrone Grant
David Reyna
Rodney Adams
Raymond Grant
Victor Rios
Juan Alanis
Noe Guajardo, Jr.
Americo Rios
Manuel Alanis
Ivan DeJesus Gutierrez Pedro Rivera
Jesus Alanis
Marco Hermosillo
Jonathan Rivera
14 The complaint alleges that the Respondent discharged 105 em-
ployees for engaging in a work stoppage over a pay raise. During the
hearing, the General Counsel amended the complaint to remove from
the complaint Rogelio Chavez (who was inadvertently listed twice) and
Ron Fontenot. Of the remaining 103 employees, only 73 employees
were named on the Respondent’s list of terminated employees. Four
employees were listed as “terminated” on the Respondent’s list but
were not named in the complaint: Victor Corral (a supervisor), Rodolfo
Espinoza Jr., Roberto Garcia, and Mack James.
15 We shall also provide for the posting of the notice in accord with
J. Picini Flooring, 356 NLRB 11 (2010). For the reasons stated in his
dissenting opinion in J. Picini Flooring, Member Hayes would not
require electronic distribution of the notice.
16 The spelling of the names of Uriel Gracia, Ivan DeJesus Gutierrez,
Daniel Herrera, Edgar Pacheco, and Stephanie Limbrick Patillo reflect
the General Counsel’s amendments during the hearing.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
840
Hugo Alvarez
Mario Hermosillo
Juan Rocha
Lizzette Cabrera
Daniel Herrera
Fernando Rubio
Jose Cadena
Billie Jack
Carlos Sahagun
Mario Cantu
Elvira Joshua
Enrique Salazar
Jose Cantu, Jr.
Jorge Martinez
Victor Salazar
Javier Cantu
Sergio Melendez Christian Salazar
Michael Castellanos
Juan Montoya
Eduardo Salinas
Daniel Cazares
Ivan Morales
Jaime Salinas
Ramiro Chapa
Javier Morales
Jose Soto
Jacinto Chapa
Lizzie Odom
Annettia Spikes
Barry Craig
Antonio Ortiz
Daniel Torres
Luis de la Garza
Edgar Pacheco
Cruz Trenado
Ricardo Espinoza Stephanie Limbrick
Juan Trevino
Patillo
Arnoldo Garcia
Tyangela Porter
Eliud Trevino
Alfonso Garcia
Tommy Prosperie Regina Williams
Guillermo Garcia
Jose Ramirez Gilibaldo Zuniga
Guadalupe Garza
Alexi Ramos Benansio Zuniga
Emigdio Zuniga
(b) Make the employees named above in subparagraph
(a) whole for any loss of earnings and other benefits suf-
fered as a result of the discrimination against them, with
interest, in the manner set forth in the remedy section of
the decision.
(c) Within 14 days from the date of this Order, remove
from its files any reference to the unlawful discharges of
the employees named above in subparagraph (a) and,
within 3 days thereafter, notify those employees in writ-
ing that this has been done and that the discharges will
not be used against them in any way.
(d) Preserve and, within 14 days of a request, or such
additional time as the Regional Director may allow for
good cause shown, provide at a reasonable place desig-
nated by the Board or its agents, all payroll records, so-
cial security payment records, timecards, personnel rec-
ords and reports, and all other records, including an elec-
tronic copy of such records if stored in electronic form,
necessary to analyze the amount of backpay due under
the terms of this Order. (e) Within 14 days after service
by the Region, post at its La Porte, Texas facility, copies
of the attached notice marked “Appendix.”17 Copies of
17 If this Order is enforced by a judgment of a United States court of
appeals, the words in the notice reading “Posted by Order of the Na-
tional Labor Relations Board” shall read “Posted Pursuant to a Judg-
the notice, on forms provided by the Regional Director
for Region 16, after being signed by the Respondent’s
authorized representative, shall be posted by the Re-
spondent and maintained for 60 consecutive days in con-
spicuous places including all places where notices to
employees are customarily posted. In addition to physi-
cal posting of paper notices, notices shall be distributed
electronically, such as by email, posting on an intranet or
an internet site, and/or other electronic means, if the Re-
spondent customarily communicates with its employees
by such means. Reasonable steps shall be taken by the
Respondent to ensure that the notices are not altered,
defaced, or covered by any other material. In the event
that, during the pendency of these proceedings, the Re-
spondent has gone out of business or closed the facility
involved in these proceedings, the Respondent shall du-
plicate and mail, at its own expense, a copy of the notice
to all current employees and former employees employed
by the Respondent at any time since March 19, 2008.
(f) Within 21 days after service by the Region, file
with the Regional Director a sworn certification of a re-
sponsible official on a form provided by the Region at-
testing to the steps that the Respondent has taken to
comply.
APPENDIX
NOTICE TO EMPLOYEES
POSTED BY ORDER OF THE
NATIONAL LABOR RELATIONS BOARD
An Agency of the United States Government
The National Labor Relations Board has found that we
violated Federal labor law and has ordered us to post and
obey this Notice.
FEDERAL LAW GIVES YOU THE RIGHT TO
Form, join, or assist a union
Choose representatives to bargain with us on
your behalf
Act together with other employees for your bene-
fit and protection
Choose not to engage in any of these protected
activities.
WE WILL NOT discharge you for engaging in protected
concerted activity.
WE WILL NOT in any like or related manner interfere
with, restrain, or coerce you in the exercise of the rights
guaranteed to you by Section 7 of the Act.
WE WILL, within 14 days from the date of the Board’s
Order, offer the following employees full reinstatement
to their former jobs or, if those jobs no longer exist, to
ment of the United States Court of Appeals Enforcing an Order of the
National Labor Relations Board.”
ATLANTIC SCAFFOLDING CO.
841
substantially equivalent positions, without prejudice to
their seniority or any other rights or privileges previously
enjoyed:
Juan Abarca
Emmanuel Gomez
Jose Rangel
Hector Acosta
Uriel Gracia
Richard Reyna
Emilio Acosta
Tyrone Grant
David Reyna
Rodney Adams
Raymond Grant
Victor Rios
Juan Alanis
Noe Guajardo, Jr.
Americo Rios
Manuel Alanis
Ivan DeJesus Gutierrez Pedro Rivera
Jesus Alanis
Marco Hermosillo
Jonathan Rivera
Hugo Alvarez
Mario Hermosillo
Juan Rocha
Lizzette Cabrera
Daniel Herrera
Fernando Rubio
Jose Cadena
Billie Jack
Carlos Sahagun
Mario Cantu
Elvira Joshua
Enrique Salazar
Jose Cantu, Jr.
Jorge Martinez
Victor Salazar
Javier Cantu
Sergio Melendez Christian Salazar
Michael Castellanos
Juan Montoya
Eduardo Salinas
Daniel Cazares
Ivan Morales
Jaime Salinas
Ramiro Chapa
Javier Morales
Jose Soto
Jacinto Chapa
Lizzie Odom
Annettia Spikes
Barry Craig
Antonio Ortiz
Daniel Torres
Luis de la Garza
Edgar Pacheco
Cruz Trenado
Ricardo Espinoza Stephanie Limbrick
Juan Trevino
Patillo
Arnoldo Garcia
Tyangela Porter
Eliud Trevino
Alfonso Garcia
Tommy Prosperie Regina Williams
Guillermo Garcia
Jose Ramirez Gilibaldo Zuniga
Guadalupe Garza
Alexi Ramos Benansio Zuniga
Emigdio Zuniga
WE WILL make the employees named above whole for
any loss of earnings and other benefits resulting from
their discharges, less any interim earnings, plus interest.
WE WILL, within 14 days from the date of the Board’s
Order, remove from our files any reference to the unlaw-
ful discharges of the employees named above, and WE
WILL, within 3 days thereafter, notify them in writing that
this has been done and that the discharges will not be
used against them in any way.
ATLANTIC SCAFFOLDING CO.
Jamal M. Allen, Esq., for the General Counsel.
G. Mark Jodon, Esq. and Timothy A. Rybacki, Esq., for the
Respondent.
DECISION
STATEMENT OF THE CASE
MARGARET G. BRAKEBUSCH, Administrative Law Judge.
This case was tried in Beaumont, Texas, on May 26, 27, and
28, 2009. The charge in this case was filed on March 20, 2008,
by the United Brotherhood of Carpenters and Joiners of Ameri-
ca, Local 502 (the Union). On August 29, 2008,1 the Regional
Director for Region 16 of the National Labor Relations Board
(the Board) issued a complaint and notice of hearing based on
the allegations contained in the underlying charge. The com-
plaint alleges that Atlantic Scaffolding Company (Respondent)
violated Section 8(a)(1) of the National Labor Relations Act
(the Act) by discharging 105 employees because the employees
engaged in concerted activities with other employees for the
purposes of mutual aid and protection by engaging in a work
stoppage over a pay raise.
On the entire record, including my observation of the de-
meanor of the witnesses, and after considering the briefs filed
by the General Counsel and the Respondent, I make the follow-
ing.
FINDINGS OF FACT
I. JURISDICTION
Respondent, a Delaware corporation, with an office and
place of business in La Porte, Texas, has been engaged in the
business of a refinery maintenance subcontractor. During the
past fiscal year, Respondent, in conducting its business opera-
tions, has provided services valued in excess of $50,000 to
ExxonMobil Oil Refining and Supply Corporation, an enter-
prise directly engaged in interstate commerce. Respondent
admits, and I find that it is an employer engaged in commerce
within the meaning of Section 2(2), (6), and (7) of the Act and
that the Union is a labor organization within the meaning of
Section 2(5) of the Act.
II. ALLEGED UNFAIR LABOR PRACTICES
A. Background
ExxonMobil Refining and Supply Corporation (ExxonMo-
bil) operates an oil refinery in Beaumont, Texas, composed of
38 separate processing units. At regular intervals, ExxonMobil
schedules “turnarounds” in which individual refinery units are
shut down to undergo inspections and various maintenance
procedures. Respondent is a refinery maintenance contractor
with offices in LaPorte, Texas. In the spring of 2008, Exx-
onMobil contracted with Respondent to perform scaffolding
work for a scheduled maintenance “turnaround” at the Beau-
mont refinery. The turnaround required the shutdown of 13
processing units at the refinery. Respondent was responsible
for performing the scaffolding work on all units on the north
side of the refinery, including the FCC unit. The FCC unit is
1 All dates are 2008 unless otherwise indicated.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
842
ExxonMobil’s third largest gasoline production unit in the
United States. The primary purpose of the turnaround was to
replace the FCC unit’s old reactor with a new one and repair
and modernize the regenerator. The turnaround also involved
various capital projects, including maintenance tasks on the
refinery’s other process units.
B. Issues
The General Counsel alleges that Respondent terminated ap-
proximately 105 employees in retaliation for the employees’
engaging in a peaceful work stoppage and presenting a concert-
ed complaint letter regarding pay and benefits to management
on March 17, 2008. Respondent, however, submits that it did
not discharge the employees in issue. Further, Respondent
asserts that even if the employees had been discharged their
work stoppage was not protected activity.
While there is no dispute that Respondent’s general foremen
are supervisors and excluded from the protection of the Act, the
parties do not agree as to the supervisory status of the foremen;
who are subordinate to the general foremen. The General
Counsel takes the position that the foremen who engaged in the
work stoppage were not statutory supervisors and were protect-
ed by the Act. Respondent maintains that its foremen meet the
requirements for supervisory status under Section 2(11) of the
Act. Over the course of the hearing, the parties were also una-
ble to reach an agreement as to whether Alfonso Garcia held
the status of general foreman or a foreman during the 2008,
turnaround in issue.2
C. Supervisors and Management Officials for ExxonMobil
and Respondent
Respondent’s primary supervisory and management officials
involved in this case were Site Manager Dylan Fulton, Site
Superintendent Jeremy Chatagnier, Turnaround Supervisor
David Scotty Wall, Safety Manager Derek Harvey, and Re-
gional Manager Chad King. As site manager, Dylan Fulton
(Fulton) was the highest-ranking official for Respondent at the
Beaumont, Texas facility. Jeremy Chatagnier (Chatagnier)
reported to Fulton and oversaw all field operations. David
Scotty Wall (Wall) supervised the general foremen on the job
and Derek Harvey (Harvey) was responsible for the Respond-
ent’s safety functions at the facility. Although Chad King was
present at the facility on March 17, 2008, he did not testify and
the record does not reflect his specific duties in relation to the
Beaumont facility.
William Alan Swango (Swango) is ExxonMobil’s turna-
round department head for the Beaumont refinery. In that posi-
tion, he is responsible for all the planning and execution of
ExxonMobil’s scheduled turnarounds. Dorothy Patterson was
ExxonMobil’s turnaround manager. Rick Goldin was head of
security for ExxonMobil and Mike Lorenzen was ExxonMo-
bil’s director for security. There is no evidence that ExxonMo-
bil and the Respondent are joint employers and the General
2 Inasmuch as Alfonso Garcia was included in the group of employ-
ees who did not begin work on the turnaround on the morning of March
17, 2008, neither the General Counsel nor Respondent could rely on
work performed to establish his status during the turnaround.
Counsel does not assert that these employers functioned as joint
employers during the turnaround period in issue.
D. The March 17, 2008 Work Stoppage
1. The turnaround operation
March 17, 2008, was the first day of the scheduled turna-
round. Fulton testified that when the units were operational,
they generated millions of dollars in production. Because of
ExxonMobil’s revenue loss resulting from the shutdown, Re-
spondent had only a small window of time to perform its con-
tractual function. Additionally, because the FCC unit was Exx-
onMobil’s third largest gasoline-producing unit, ExxonMobil
imposed a very strict deadline for the turnaround. The turna-
round actually lasted only 8 weeks and ended on May 10, 2008.
The turnaround operated around the clock, with employees
working either day or night shifts. Respondent employed ap-
proximately 240 to 250 employees for the turnaround. This
complement of employees included general foremen, foremen,
lead carpenters, carpenters, and helpers, in addition to a
maintenance division of approximately 50 employees. In addi-
tion to Respondent’s employees, there were approximately
1000 additional workers who were employed by the other con-
tractors on the turnaround project.
During a turnaround procedure, ExxonMobil transports the
contractors’ employees into the facility from the parking lot by
transportation buses. Under OSHA regulations, ExxonMobil
must account for everyone who is inside the refinery. To com-
ply with the regulations, ExxonMobil requires all contractor
employees to have an identification badge for entrance into the
facility. All employees must swipe their badges upon entering
and leaving the facility. Contract employees are also required
to carry with them a hydrogen sulfide (H2S) monitor while
working inside the refinery. If an employee comes into an area
where there is a certain level of hydrogen sulfide, the monitor
will automatically emit an audible, visual, and vibrational
warning. The employees normally kept their identification
badges and H2S monitors until they complete their work on the
job. Swango explained, however, that if a contract employee
leaves the employment of a contract company or if there is a
safety incident in the refinery, ExxonMobil collects the badges
and monitors until the completion of the investigation and a
determination has been made as to whether an employee is
allowed to return to the property. Chatagnier also confirmed
that badges and monitors are retrieved from employees if Exx-
onMobil asks the employee to leave the facility for any safety
reason.
During the turnaround procedure, each day began with a
“turnover meeting,” in which ExxonMobil met with the con-
tractors’ supervisors at approximately 6 a.m. each day. The
meetings were held at the beginning of the shift to allow the
transfer of work from the night shift to the day shift. During
the turnover meeting, ExxonMobil representatives discussed
occurrences during the night shift and updated the contractors
as to the general status of the turnaround. Respondent’s general
foremen and supervisor, wall, attended the turnover meeting
and received the daily work assignments from ExxonMobil.
Each contractor had an ExxonMobil representative who distrib-
uted a written schedule of the work to be performed by the
ATLANTIC SCAFFOLDING CO.
843
contractor. At approximately 6:30 a.m. and following the
meeting with supervisors, ExxonMobil conducted a larger safe-
ty meeting involving all the contractors on the turnaround.
Because the safety meeting required the attendance of all em-
ployees working for the various contractors, there were often as
many as 600 employees attending the safety meeting. The
safety meetings lasted for approximately 15 to 30 minutes.
Following the larger safety meeting, Respondent’s employees
attended “toolbox” safety meetings with their foremen, general
foremen, and various safety officials before they went to their
respective work areas. During the toolbox meetings, general
foremen discussed safety issues and the employees received
their assignments for the day. These meetings normally lasted
between 15 and 30 minutes. Wall testified that after attending
the morning meetings and collecting their tools, the employees
were normally at their work assignments and working by 7:15
to 7:20 a.m. Each foreman worked with three-person crews
consisting of a lead carpenter, carpenter, and carpenter’s helper.
There were usually no more than three crews assigned to work
with each foreman.
2. Employee compensation concerns
Victor Corral worked for Respondent for 4 years prior to
March 17, 2008. He had been a general foreman for only 3 to 4
months on March 17. Prior to the turnaround beginning on
March 17, rumors spread among all the employees working on
the Beaumont site that ExxonMobil planned to give raises to all
of the turnaround contractors. Corral spoke with Site Superin-
tendent Chatagnier and Turnaround Supervisor Wall about
whether Respondent’s employees would receive raises.
Chatagnier told him that Respondent intended to give its em-
ployees incentive pay rather than a raise. Under the incentive
program that was to be in effect from March 13, 2008, until
May 8, 2008, employees would receive incremental raises if
they complied with attendance and safety guidelines. Under
the terms of the program, employees could be disqualified for
having more than one unexcused absence for the week, leaving
early, or arriving late more than once a week, or for having an
OSHA recordable injury. The eligibility for the $1.25 per hour
incentive pay was payable weekly. The remaining half of the
incentive payment was paid as a completion bonus and provid-
ed $1.25 for every hour worked from March 13, 2008, until
May 8, 2008. When Chatagnier told Corral about the proposed
incentive pay, Corral responded that the employees were not
going to like the incentive pay in lieu of a raise.
Corral shared his dissatisfaction concerning the proposed in-
centive pay with other employees. After his discussions with a
number of his fellow employees, leadman Victor Salazar pre-
pared a letter to Respondent on his home computer on March
16, 2008. The 1-page letter was addressed “To whom it may
concern,” and it is shown to be from “ASC employees, at Exx-
onMobil Beaumont, TX.” The first paragraph of the letter con-
tains:
In behalf of all Atlantic Scaffolding Company employees cur-
rently employed at ExxonMobil Beaumont, TX, we demand a
pay rate increase; per diem pay increase, and a better br[e]ake
down system for craftsman classification. We ASC employ-
ees feel deserve the above because first of all our hard work,
followed by the professionalism we provide to this company
and last, the high level of risk involved at work.
The letter continues with an explanation of why the work is
“hard work” and how the employees demonstrate professional-
ism. Additionally, the letter describes the kind of work that
poses risks for employees. The letter ends by asking whether
Respondent supported the employees in this matter and ex-
pressing a desire to avoid an “escalade” of the matter beyond
Beaumont facilities. Attached to the letter is a list of employee
concerns. The first of the six listed concerns proposes that
other contractors at the same site provide their employees with
the “right pay rate” and a “reasonable” amount of per diem.
When Foreman Jose Rangel first saw the letter on Sunday,
March 16, 2008, a signature page was attached. At the time
that he signed the letter, the attached page contained approxi-
mately 30 to 40 signatures. When Victor Corral and Foreman3
David Reyna first saw the letter on March 16, 2008, there were
approximately 100 signatures on the attached pages. Although
Reyna did not identify who had given him the letter and the list
of signatures, he recalled that “they” told him that “they” were
going to speak with Respondent’s supervisors about a pay in-
crease on the following morning. Corral acknowledged that the
letter was a means by which to justify the employees’ receiving
more money.
3. The employees present the letter to Wall
As noted above, Monday, March 17, 2008, was the first day
of the scheduled turnaround. Respondent’s employees attended
the safety meeting that was held inside the lunch tent for the
FCC unit. At approximately 6:55 a.m., Supervisor Wall was
standing outside the lunch tent; in the area where the toolbox
meetings are held. Foreman Eduardo Salinas handed him a
copy of Salazar’s letter. Victor Corral estimated that approxi-
mately 100 employees were gathered together at the time the
letter was presented to Wall. Although the night-shift employ-
ees were typically released from work at 5 a.m., a number of
the night-shift employees remained in the facility to demon-
strate their support for the letter. In recalling what Salinas said
to him as he presented the letter, Wall testified: “He just told
me this is what they wanted before they would go back to
work.” Wall went on to add that Salinas told him that the em-
ployees wanted an increase of $5 an hour and $90 a day per
diem before they would return to work. Corral also confirmed
that in speaking with Wall, the employees demanded an in-
crease of $5 an hour and an increase in per diem pay. Wall told
Salinas that he could not negotiate that kind of request and he
would have to turn it over to uppermanagement. Wall testified
that Salinas and Corral were the two employees who spoke
with him about the letter. Wall asked them if they would go to
work until Respondent could get the matter resolved. Wall
testified that not only did he ask the foremen to begin working;
he specifically asked them to update the scaffold tags that re-
quired the foremen’s authorization before the other contractors
3 Reyna was a foreman during the 2008 turnaround period. At the
time of his testimony, he was employed by Respondent as a leadman.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
844
could use the scaffolds.4 Wall asserted that Salinas and Corral
refused. Salinas did not testify and Corral did not rebut Wall’s
testimony. Wall also recalled that only General Foreman Jared
LeJeune and a “couple” of the other foremen helped him to
update the scaffold tags.
4. Chatagnier’s initial involvement with the employees
After receiving and reading the letter, Wall contacted Site
Superintendent Chatagnier and asked him to come to the lunch
tent area. After Chatagnier arrived and read the letter, he spoke
with the employees outside the tent. Chatagnier recalled that
approximately 20 to 30 employees attempted to speak with him
at one time. When he asked for one person to speak with him
from the group, Salinas came forward. Salinas told him that the
employees wanted a $5-an-hour across-the-board raise and an
increase in their per diem pay. Chatagnier told Salinas that he
was not in a position to make that call and those were decisions
that would have to be made by individuals above him.
Chatagnier recalled that Salinas told him that Respondent had
until noon to come up with a decision. Chatagnier testified that
at that point he assumed that the employees were going back to
work while they waited for the decision. Chatagnier then con-
tacted Fulton and told him that the employees had given Re-
spondent until noon to reach a resolution. When Chatagnier
returned to the assembled employees, he told them that Fulton
was on his way and that Fulton would address with ExxonMo-
bil what needed to be addressed. Chatagnier told the employ-
ees that he needed them to return to work and Fulton would
come down at noon and let them know what could be resolved.
Chatagnier testified “Eduardo Salinas told me that I misunder-
stood what he said. When he meant noon, that they were going
to sit there and wait till noon, but that they were not going to go
back to work until a decision was made.” Chatagnier further
recalled that Salinas told him that whether they would stay or
leave would depend on what the employees heard about their
pay rates and the per diem. Chatagnier also recalled that Salin-
as told him that if their demands were not met by noon they
were going to request their pink slips and their tool passes to
remove their tools.
Chatagnier testified that although he does not speak Spanish
he could tell by the tone of their voices that the employees were
frustrated. He recalled that one employee yelled out to him:
“F—k you, white boy. Please hit me so I can sue you.” He
also recalled that a “couple of times” Salinas urged the employ-
ees to calm down.
5. ExxonMobil’s involvement with the employees
Swango recalled that following the morning safety meeting
on March 17 he headed back toward the turnaround trailer.
Before reaching the trailer, however, he was notified that Re-
spondent’s scaffold builders had refused to go to work. When
he returned to the FCC tent area, he observed approximately
100 scaffold builders outside the east side of the tent. Dorothy
Patterson, ExxonMobil’s turnaround manager, as well as two
other ExxonMobil representatives, accompanied Swango.
4 Wall explained that “updating” the scaffold tags refers to checking
the scaffolds to make sure that they are still sound and ready to be used
by the contractors on the turnaround.
When Swango and the other ExxonMobil representatives ar-
rived at the tent, Chatagnier was speaking with the employees.
Although Swango did not overhear Chatagnier’s discussion
with the employees, Chatagnier subsequently reported the em-
ployees’ demands to him and the other ExxonMobil representa-
tives. When Patterson heard the demands, she opined that
ExxonMobil “was not real willing to meet those demands.”
Fulton arrived at the tent area just shortly after the Exx-
onMobil representatives. Fulton also addressed the employees
and asked them to return to work in order that the situation
could be resolved. Fulton also told the employees that under
the current circumstances, ExxonMobil was not willing to ne-
gotiate in that manner. Fulton recalled that when he asked the
employees to give him a day to negotiate with ExxonMobil
they emphatically refused. When he asked them to return to
work until he could give them an answer by noon, the employ-
ees again refused. Employee Regina Williams testified that
employees refused to return to work after Fulton asked the
employees to give him a day to work out a resolution and then
again when he asked if they would give him until noon. Fulton
testified that he pleaded with the employees, telling them that
Respondent needed them, as did ExxonMobil. Chatagnier re-
called that the employees responded to Fulton as they had re-
sponded to him by stating that they weren’t going to return to
work until they knew whether they were receiving a raise.
During the time that Chatagnier and Fulton spoke with the
assembled employees, Swango and the other ExxonMobil rep-
resentatives remained inside the tent. Swango did not personal-
ly overhear what the employees were saying. Swango testified,
however, that based on his conversation with Chatagnier and
Fulton, it was his understanding that if the employees did not
receive a bonus; they were not going to work.
Swango testified that as he waited inside the tent it seemed to
him that Chatagnier and Fulton’s discussions with the employ-
ees lasted for a couple of hours, with “back-and-forth” discus-
sions. While the employees were assembled outside, Swango
remained inside the tent, pacing back and forth along the front
of the tent. Swango testified that even though he did not hear
what the employees were saying he observed that things were
not going well and that some of the individuals were becoming
agitated. Swango testified that it was his understanding that the
employees were not going to work without getting an increase
in pay. Finally, Swango told Chatagnier and Fulton that they
had to remove the employees from the property and to deal
with them outside the refinery. Chatagnier recalled that the
ExxonMobil representatives asked Chatagnier and Fulton to
make one last request for the employees to return to work.
Fulton made the additional request. Fulton told the employees
that if they did not return to work ExxonMobil was going to
have them removed from the facility. Fulton explained that the
matter was out of Respondent’s hands and that the employees
either needed to return to work in order for the negotiations to
occur or the buses were going to pick them up to leave the fa-
cility.
Although Chatagnier noticed a small change in the employ-
ees’ attitudes once they realized that ExxonMobil was going to
call for the buses, the employees did not return to work. Victor
Corral also acknowledged that from the time that the employees
ATLANTIC SCAFFOLDING CO.
845
presented the letter to Wall until the time that the employees
were bused from the facility the employees performed no work.
Swango confirmed that it was he who instructed ExxonMo-
bil personnel to call for the transportation buses and to have
ExxonMobil security to remove the employees from the prem-
ises. Swango testified that ExxonMobil wanted the employees
bused to the parking lot because they were refusing to work
inside the refinery and such action presented a safety issue for
ExxonMobil. Swango testified that while he did not speak
Spanish he concluded that the employees refusing to work were
becoming more agitated and that the situation was deteriorat-
ing.
Chatagnier testified that the decision to remove the employ-
ees was made solely by ExxonMobil and not by any representa-
tives of Respondent. Chatagnier confirmed that Swango or-
dered the buses and that ExxonMobil’s security director Mike
Lorenzen, initiated the request that the employees be removed
from the refinery. Lorenzen also orchestrated the process for
employees to board the buses. When ExxonMobil’s security
personnel arrived at the tent, they took command of the situa-
tion and ordered the employees to form a single line and make
their way from the east side of the tent to the west side of the
tent where the buses were waiting.
Employee Regina Williams recalled that approximately 2
minutes after she saw Swango exit the tent, ExxonMobil securi-
ty arrived. She recalled that ExxonMobil’s security personnel
told the employees that they needed to leave the yard because
the number of people posed a safety hazard. When employees
asked were they were going, the security personnel told them
that they were going elsewhere to talk with their contractor
because there were too many people in the tent area. Swango
recalled that after he called for the buses, some of Respondent’s
employees approached him and told him that they weren’t re-
fusing to work. He told them to get with their foremen and go
to work.
In response to Swango’s direction, approximately five or six
buses arrived to transport the employees away from the tent
area. ExxonMobil representatives asked Respondent to provide
two supervisors for each employee bus. Williams explained
that she assumed that they were going to be bused back to the
trailer to have a meeting about the letter. The buses, however,
transported the employees to one of the refinery gates, which
led to an ExxonMobil parking lot. The first bus left the area
outside the FCC tent at approximately 8:16 a.m. ExxonMobil’s
gate log reflects that the employees began exiting the refinery
at approximately 8:19 a.m. When the employees exited the
buses, they passed through the gate in a single-file line. As the
employees exited the facility through the security gate, both
Respondent officials and ExxonMobil officials were present.
Fulton testified that ExxonMobil’s security and turnaround
management directed that the employees turn in their badges,
H2S monitors, and company radios when they exited the gate.
Fulton testified that he believed that Swango gave the direction
for the ExxonMobil items to be collected from the employees.
Chatagnier testified that he specifically heard Swango give the
direction for the badges, monitors, and radios to be collected
from the employees. Chatagnier also testified that neither he
nor Fulton protested the directive because it is ExxonMobil’s
facility and they were going to do what ExxonMobil asked
them to do. There is no dispute that some of Respondent’s
managers assisted in collecting the badges, monitors, and radi-
os. Although Swango did not deny that the items were collect-
ed from the employees, he denied that he personally told Re-
spondent to collect the employees’ badges and monitors.
Swango testified that the employees were refusing to go to
work and that is why ExxonMobil removed the employees from
the facility. Although Swango testified that he did not know
who actually requested that the employees turn in their badges
and monitors, he acknowledged that the direction could have
come from ExxonMobil’s security subcontractor. Swango
confirmed that a refusal to work by subcontractors’ employees
constitutes a reason for ExxonMobil to take the employees’
badges and limit their access to the premises.
6. The employees in the parking lot
After exiting the buses, the employees proceeded through the
gates to the ExxonMobil parking area. The employees did not
immediately leave, but, instead, remained in the parking lot.
Victor Salazar testified that the employees remained in the
parking lot because they were waiting for Respondent’s repre-
sentatives to come and to speak with them and to see what Re-
spondent was going to do for them. During the time that the
employees remained in the parking lot, some of the employees
told Exxon security personnel that they wanted their work tools
from the facility. The employees normally stored their tools
outside the FCC lunch tent in the area where the toolbox meet-
ings were conducted. Swango recalled that after the employees
were bused from the facility, he was notified that some of the
employees requested their tools. Normally, a contract employ-
ee must have a gate pass or authorization from ExxonMobil to
remove tools from the refinery. Swango made the necessary
arrangements for the return of the tools and authorized Re-
spondent to pick up the employee tools and take them to the
employees.
7. The employees’ contact with Respondent’s managers
and supervisors
While the employees were gathered in the parking lot, the
employees continued to communicate with Respondent’s su-
pervisors personally and telephonically. The record reflects a
wide disparity in the testimony concerning these conversations.
The General Counsel’s witnesses testified concerning conversa-
tions in which they either personally participated or conversa-
tions which they overheard involving Wall, Safety Manager
Derek Harvey, Dylan Fulton, or Regional Manager Chad King
while they were gathered in the parking lot.
While he was in the parking lot, Corral had three or four cell
phone conversations with Wall. Corral asserted that in one of
the conversations he asked Wall why their badges had been
taken and “what was going on.” Corral asserted that Wall ini-
tially responded that he didn’t know and he would have to get
with Chatagnier and Fulton; who were meeting with Exx-
onMobil. Corral acknowledged that during one of the conver-
sations Wall asked him what the employees wanted. Corral
asserted that he told Wall that the employees wanted a straight
raise of $2.50. Corral asserted that in a later conversation Wall
told him that Chatagnier agreed and that buses were going to be
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
846
sent to the parking lot to bring the employees back into the
facility. Corral testified that when the buses did not return Wall
told him that Fulton would take back only 75 percent of the
employees. Wall had allegedly asserted that 25 percent of the
employees had to stay out because ExxonMobil wanted “some-
body punished for what happened.” Corral admitted, however,
that during the cell phone conversation, Wall told him that Re-
spondent wanted the employees to come back to work.
Employee David Reyna testified that Derek Harvey, Re-
spondent’s safety manager, came to the parking lot while the
employees were gathered there. Reyna testified that he over-
heard Harvey talk with some employees about the incentive
raise that Respondent had planned to give employees. Reyna
asserted that at some point Harvey stated that employees were
going to get a straight raise rather than the incentive pay and
that buses were going to be sent to take employees back into
the facility. ExxonMobil’s ins-and-outs report for March 17,
2008, reflects, however, that Harvey entered the facility at 6:41
a.m. and did not exit the refinery until 10:41 p.m. on March 17,
2008.
Victor Corral, Jose Rangel, and David Reyna all recalled that
Regional Manager Chad King came out to the parking lot while
the employees were gathered there. Corral asserted that King
told Eduardo Salinas and him that the employees ought to take
the offer of 75 percent of the employees returning because he
had 80 employees coming in to replace them. Salinas did not
testify. When Corral gave an affidavit during the investigation
of the initial charge, he mentioned that King came to the park-
ing lot to talk with employees. He admitted in his testimony at
trial that he never mentioned anything in the affidavit about
King’s telling employees that only 75 percent of employees
could return. Rangel and Reyna did not overhear King’s con-
versation with any of the employees. Corral also testified that
when Fulton came to the parking lot to talk with employees he
mentioned that only 75 percent of the employees could return
because 25 percent had to be punished. Regina Williams is the
only other employee who testified that she heard Fulton state
that only 75 percent of the employees could return. She
acknowledged, however, that she only heard bits and pieces of
Fulton’s comments to employees while he was in the parking
lot. She further admitted that when she gave a prior affidavit to
the Board she failed to mention anything about Respondent
saying that only 75 percent of the employees could return to
work. Victor Salazar testified that he did not hear any of Re-
spondent’s supervisors or managers mention anything about a
75/25 percent split for employees returning to work. He testi-
fied that he only heard from fellow employees that only 75
percent of the employees could return to work.
In addition to the day-shift employees who had been bused
out of the facility, there were also a number of night-shift em-
ployees in the parking lot. Because these employees were
grouped with the day-shift employees on the buses, their badg-
es were collected as well. Swango confirmed that if any of the
night-shift employees who had not participated in the work
stoppage had turned in their badges, the badges were returned
to them for them to return to work. When David Reyna saw the
badges returned to the night-shift employees, he asked Esther
Sepulveda, an office employee with Respondent, if he could
have his badge as well. She told him that she could not give it
to him until “they” told her to do so. Reyna recalled that at that
point, ExxonMobil security was telling employees that they had
to leave the parking lot because they were terminated. Reyna
recalled that Respondent’s safety manager, Derek Harvey,
spoke up and told ExxonMobil security that the employees
were going back to work. ExxonMobil’s security personnel
then told Harvey that it was their understanding that the em-
ployees had been fired and they could not return to the facility.
Fulton testified that it was his understanding that the em-
ployees were required to board the buses because ExxonMobil
demanded that they leave the facility. He explained that his
plan had been to go to the parking lot to try to negotiate with
the employees. He recalled that when he went to the parking
lot, he urged the employees to “please come back to work.” He
told employees that ExxonMobil had indicated that they would
sit down and talk with Respondent, however, they (ExxonMo-
bil) would not simply allow the employees “not to go to work.”
Fulton believed that employees Eduardo Salinas and Juan Tre-
vino were acting as spokespersons for the employees in the
parking lot. When he stated this request to Salinas and Trevino,
they continued with their original demand of the $5 an hour
across-the-board raise and doubling their per diem. Fulton
recalled that the back-and-forth discussions with the employees
in the parking lot and with ExxonMobil continued for perhaps 2
to 3 hours. Fulton testified that he never told any employees in
the parking lot that they were fired or that only 75 percent of
the employees could return. He also denied hearing King make
any statement to the employees that only 75 percent of the em-
ployees could return.
8. The employees leave the vacant lot
After the employees had been in the parking lot for over an
hour, ExxonMobil security told the employees that they had to
leave ExxonMobil property. The group of employees then
moved to a vacant lot across the street from the refinery. In the
process of the employees moving to the vacant lot, approxi-
mately 20 to 30 employees left the group. Chatagnier denied
that Respondent had any involvement in having the employees
removed from the parking lot. At approximately 11:15 a.m.,
Wall received a call from Corral, asking him to come outside
the refinery to speak with the employees. Chatagnier was pre-
sent when Wall received the call and suggested that he accom-
pany Wall to the vacant lot. ExxonMobil’s in-and-outs report
for March 17 reflects that Wall and Chatagnier exited the facili-
ty at 11:38 a.m.
Chatagnier estimated that approximately 60 to 70 employees
were gathered in the vacant lot. When Chatagnier spoke to the
employees in the group, he spoke with Eduardo Salinas as their
representative. He did so because Salinas was bilingual and he
offered to speak for the group. Chatagnier presumed that he
was acting as spokesman for the group because he translated
Chatagnier’s comments to the other employees. The employees
asked Chatagnier about the status of their employment. He
reminded them that they had given Respondent a deadline of
noon to “come up with a decision” on their raise and Exx-
onMobil had bused them out of the property.
ATLANTIC SCAFFOLDING CO.
847
Corral testified that Chatagnier told the employees that he
wanted 75 percent of them to return to work. When asked if
Chatagnier identified the employees who would be included in
the 25 percent who would not return, Corral identified Victor
Salazar and Jacinto Chapa. He contended that Chatagnier iden-
tified only these two employees as employees who could not
return to work. Corral acknowledged that during the meeting
with Chatagnier and Wall he understood that he was welcome
to return to work. David Reyna recalled that Chatagnier and
Wall told the employees that they could select the 75 percent
who would return and it didn’t matter who was selected. Reyna
added that only 25 percent had to remain out in order for Exx-
onMobil to see that someone had paid for what happened.
Chatagnier recalled that employees asked him whether Exx-
onMobil would globally blackball them and whether Exx-
onMobil was only going to allow 75 percent of the employees
to return. Chatagnier testified that this was the first that he had
heard anything about a 75/25 plan or about their being black-
balled by ExxonMobil. Chatagnier testified that he did not tell
the employees that only 75 percent could return. He also added
that during the time that they were in the vacant lot Wall tried
to get the workers to return to work as a whole group. When
asked about ExxonMobil’s blackballing them, he told the em-
ployees that would be an issue that they would have to discuss
with ExxonMobil. He also testified that while they were in the
vacant lot with the employees some of the employees asked if
they were fired. Chatagnier told them that as far as Respondent
was concerned they were not. Chatagnier also recalled that
employees told him that if they were not going to get the pay
raise they would find other jobs. He specifically recalled that
Victor Corral and Eduardo Salinas told him that they had other
jobs lined up.
Although Fulton and Chatagnier denied that they told any
employees that only 75 percent of the employees could return,
Wall acknowledged that he did so. Wall testified that he told
Corral and Salinas that only 75 percent of the employees could
return to work because of an earlier conversation that he had
with Chatagnier. Wall did not indicate that he made this state-
ment to any other employees. He also testified that he did not
tell any employees that they were terminated. Victor Salazar
testified that while Chatagnier and Wall came to the vacant lot
and spoke with the employees, he did not speak with them and
was not “directly” present when they spoke. He acknowledged
that any information about the alleged 75/25 return-to-work
offer came only from his fellow employees. He did not hear
either Chatagnier or Wall talk about the offer. He testified that
the employees did not go back because the employees believed
that 100 percent of the employees should be given the oppor-
tunity to go back to work and not just 75 percent.
Wall and Chatagnier left the vacant lot and returned through
the refinery gate at 12:07 p.m. After they left the vacant lot,
Wall again telephoned Corral. He asked Corral if any of the
employees wanted to return to work and Corral told him that
they did not. Corral did not testify concerning this last conver-
sation with Wall on March 17 and he did not rebut Wall’s tes-
timony concerning this conversation. He acknowledged, how-
ever, that even after March 17, 2008, he talked with Wall and
Chatagnier about returning to work. He testified that he had
declined to return to work because the alleged 75/25 offer was
still in place.
9. The employees are removed from the vacant lot
Corral estimated that after the employees remained in the va-
cant lot for 40 minutes to an hour ExxonMobil security and the
Beaumont police asked the employees to leave the vacant lot
because the lot was ExxonMobil property. Chatagnier testified
that Respondent did not request the removal of the employees
from either the parking lot or from the vacant lot. After leaving
the vacant lot, a number of the employees went to a public park
that was near the refinery. While the employees were in the
park, they contacted Michael Doggett, a representative of the
Carpenters union. Doggett came to the park and met with the
employees. Corral recalled that Doggert collected their names
and addresses and suggested that he would help the employees
to talk with Respondent and ExxonMobil. Corral’s narrative
description of the employees’ discussion with Doggert is
somewhat ambiguous. It is unclear as to whether the employ-
ees told Doggert they were fired or whether Doggert opined
that they were fired.
10. Respondent’s actions following the work stoppage
At 3:42 p.m., Fulton sent an email to Swango with a list of
the employees, identifying them as the employees who walked
out during the morning. Fulton explained in the email that the
badges were being turned into ExxonMobil security for “Non
Entry” classifications for the ExxonMobil facilities. Fulton
further explained in the email that he had approximately 100
employees who were located at various sites along the Gulf
Coast and who had experience with Respondent. Fulton con-
firmed that he was in contact with ExxonMobil security to co-
ordinate expedited site specific training for replacement em-
ployees and he had 40 employees on schedule for ISTC training
on the following Wednesday. ISTC training is the training that
is required to allow access to the refinery. Fulton assured
Swango that Respondent would over-hire to ensure that ade-
quate manpower requirements were met. Fulton also explained
in the email that Respondent had not been given the opportuni-
ty to resolve the issues with the employees and that it appeared
that a number of individuals orchestrated the entire group. He
also explained that a large majority of the employees had been
in favor of coming back in if the entire group was allowed.
Fulton confirmed that Respondent was firmly against allowing
the organizers re-entry under any circumstances.
11. Employees return to work
Chatagnier recalled that a foreman whose name was Rodri-
guez did not participate in the work stoppage and remained at
the facility on March 17, 2008. At approximately 9:30 a.m. or
10 a.m., he contacted his crew that had been bused out of the
facility. He told them to stay behind in the parking lot. When
everything cleared, the employees in his crew went to the con-
tractor’s entry gate to obtain re-entry to the facility. Chatagnier
recalled that he spoke with Fulton and then Fulton contacted
Swango to get permission for their re-entry. After Respondent
obtained permission from ExxonMobil, the employees were
given their badges and allowed re-entry into the facility.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
848
Fulton confirmed that all of the night-shift employees re-
turned for their next shift following the work stoppage. On
March 18, 2008, Chatagnier received a telephone call from
Respondent’s Nederland office concerning Foreman Antonio
Montelongo. Chatagnier was informed that Montelongo and
his crew appeared at the Nederland office, reporting that they
had not wanted to participate in the walkout. They reported
that they had done so because they felt intimidated and they
wanted to return to work. ExxonMobil’s gate entry and exit
report (ins and outs report for March 18, 2008) reflects that
Montelongo and his crew were given access to the refinery
during the afternoon of March 18, 2008.
Fulton testified that when the employees left the refinery on
March 17, 2008, there was no decision made as to their em-
ployment status. When the employees had not returned to work
by March 19, Respondent determined that they had abandoned
their jobs. On March 19, 2008, Respondent sent separation
notices to the employees who they believed to have engaged in
the work stoppage and had not returned to work. On March 19,
2008, Fulton also sent an email to Swango and other Exx-
onMobil representatives with a final list of the employees and
their employment status in connection with the March 17, 2008,
work stoppage. The March 19, 2008, list was an update to the
original list sent by Fulton to ExxonMobil on the afternoon of
March 17 and referenced above. Chatagnier testified that the
list was prepared and given to ExxonMobil at the request of
ExxonMobil. He explained that ExxonMobil wanted a list of
the employees that were not going to return in order that the
employees’ names could be put into their global database for
restricted access to any ExxonMobil facility. Swango also
confirmed that he and other ExxonMobil representatives made
the decision that the employees would be placed on a denied-
access list and that the ExxonMobil security subcontractor
placed these individuals’ names on the denied access list for
any ExxonMobil property.
Following March 17, 2008, Respondent telephoned many of
the employees who had participated in the work stoppage in an
attempt to rehire the employees for the turnaround. Corral
acknowledged that on April 9, 2009, Chatagnier talked with
him about coming back to the job and also offered him an hour-
ly raise. Chatagnier even told him that he would be protected
from layoff and he could work through the end of the turna-
round. Corral also admitted that Chatagnier additionally told
him about other employees who had participated in the work
stoppage who was brought back to work during the turnaround.
E. Conclusions Concerning the Work Stoppage
Counsel for the General Counsel submits that the overall
record proves that Respondent discharged the workers in retali-
ation for their protected concerted activity, thereby violating
Section 8(a)(1) of the Act. Respondent asserts that the General
Counsel’s allegations should be dismissed in their entirety for
two reasons. Respondent submits that first of all, the General
Counsel has not shown that Respondent terminated the em-
ployees in retaliation for the March 17, 2008 work stoppage.
Secondly, Respondent argues that the work stoppage “was not
protected activity because the timing and manner in which the
employees conducted it was abusive, indefensible, excessively
disruptive of other workers, and therefore, unprotected” by
Section 7 of the Act.
1. Whether the work stoppage was protected by the Act
The law is well settled that employees may engage in pro-
tected work stoppages to protest their terms and conditions of
employment. In its landmark decision in NLRB v. Washington
Aluminum Co., 370 U.S. 9 (1962), the Court upheld the Board’s
decision in finding that an employer unlawfully discharged
unrepresented employees for leaving their work to protest their
working conditions. It has become well established that em-
ployees who concertedly refuse to work in protest over wages,
hours, or other working conditions are engaged in “concerted
activities” for “mutual aid or protection” within the meaning of
Section 7 of the Act. Odyssey Capital Group, L.P., 337 NLRB
1110, 1111 (2002); Jasper Seating Co., 285 NLRB 550, 551
(1987).
In their posthearing briefs, both the General Counsel and Re-
spondent refer to the Board’s ruling in Cambro Mfg. Co., 312
NLRB 634, 636 (1993). In Cambro, the Board noted that when
an in-plant work stoppage is peaceful, is focused on a specific
job-related complaint, and causes little disruption of production
by those employees who continue to work, employees are enti-
tled to persist in their in-plant protest for a reasonable period of
time. Citing TPA, Inc.,5 a 2001 Board decision that follows
Cambro, General Counsel asserts that the employees are pro-
tected by Section 7 of the Act because they briefly engaged in a
peaceful work stoppage when they presented their concerted
complaint letter to Respondent. The General Counsel main-
tains that the work stoppage caused minimal disruption to the
other employees who desired to work and occurred for a rea-
sonable period of time.
Respondent, however, submits that there was extreme dis-
ruption caused by the work stoppage at the refinery. Respond-
ent asserts that the work stoppage impacted nearly 1000 work-
ers’ ability to accomplish their work that day, and idled hun-
dreds of contractor employees aside from those employed by
Respondent. Fulton testified that because March 17, 2008, was
the first day of the turnaround, it was critical for employees to
get their tools and begin work the first thing that morning.
Fulton also explained that because millions of dollars of pro-
duction was affected by the multiple shutdown of the FCC unit,
Respondent and other contractors had only a “small window”
of time to accomplish the turnaround. Respondent provided all
the scaffolding for the turnaround. Without Respondent to
update the scaffolding according to OSHA regulations and
ExxonMobil’s policies, no other craft employees or contractors
could access any of the temporary work platforms used in the
turnaround. Swango verified that with 13 units out of opera-
tion, ExxonMobil lost millions of dollars a day during the turn-
around period. While Swango could not say with certainty that
ExxonMobil lost millions of dollars because of a delay of sev-
eral hours, he estimated that the loss was in “that range.” Vic-
tor Corral also admitted that the work stoppage was intended to
take place on the first day of the turnaround in order that it
would have the maximum impact. Corral further admitted that
5 337 NLRB 282, 282 (2001).
ATLANTIC SCAFFOLDING CO.
849
the employees knew that by staging the walkout at that time
would put Respondent in a “very uncomfortable position” with
ExxonMobil and thereby would result in some sort of wage or
compensation increase.
In its argument that the employees only engaged in a brief
work stoppage, The General Counsel cites two Board cases in
which the work stoppage was found to have lasted a reasonable
time. In TPA, Inc., supra, a 20-minute work stoppage was
found to be protected and in HMY Roomstore, Inc., 344 NLRB
963 (2005), the protected work stoppage lasted for less than an
hour. I am also mindful that in a very recent decision,6 the
Board found a concerted work stoppage to be protected when
the employer began suspending employees for their failure to
return to work or go home after only an hour. Relying on the
recall of employee witnesses,7 counsel for the General Counsel
submits that the extent of the work stoppage in this instance
was reasonable, asserting that the work stoppage lasted for
approximately only 30 minutes. Had the employees presented
their concerted complaint letter to the Respondent and only
delayed going to work for only a 30-minute period, such argu-
ment could be given greater weight. This case is somewhat
unique, however, in that there was a significant and independ-
ent intervening occurrence. Prior to Respondent reaching a
resolution of the matter with the employees, ExxonMobil inde-
pendently determined that the employees’ refusal to begin work
posed a safety threat to its operation and removed the employ-
ees from ExxonMobil property. On their own initiative or in
response to the requests of Wall, Chatagnier, or Fulton, the
employees had to specifically request to return to the worksite
after their removal by ExxonMobil. As evidenced by what
occurred with Foremen Rodriguez and Montelongo, employees
requesting to return to the refinery were allowed to do so after
Respondent received the necessary authorization from Exx-
onMobil. The majority of the employees, however, did not
request to come back into the facility. Wall and Chatagnier left
their final meeting with the employees and returned to the re-
finery at 12:07 p.m. Wall testified without dispute that follow-
ing his departure from the vacant lot he telephoned Corral one
last time that day to ask if any of the employees wanted to re-
turn to work. Corral rejected his request. Thus, the record
evidence reflects that the work stoppage on March 17, 2008,
continued as long as 5 hours after the employees presented their
letter to Wall.
The facts of the Cambro case discussed above reflect that the
alleged 11 discriminatees in that case ceased working between
2:30 and 3 a.m. on the day in question. The employees de-
clined to return to work until they spoke with the plant manager
or the owner. The employees were aware that neither official
normally appeared at the plant during that particular shift. The
supervisor urged them to return to work, explaining that either
the plant manager or the owner would arrive early in the morn-
6 Fortuna Enterprises, 354 NLRB 202 (2009).
7 Employee witnesses gave various estimates of the length of time
between the presenting of the letter and their removal by ExxonMobil.
ExxonMobil’s electronic exit log reflects that employees began passing
through the entry gate at 8:19 a.m., approximately an hour after they
would normally have begun their work.
ing for a meeting with them. The employees declined to do so.
Although the employees were again encouraged to either return
to work or to clock out and return at 7:30 a.m. for a meeting
with the plant manger the employees continued their work
stoppage. The plant manager arrived at the plant at 6 a.m. and
conferred with the supervisor and then with the employees. At
the conclusion of his meeting with the employees, he suspend-
ed them for failing to follow instructions. In deciding the case,
the Board noted that the work stoppage was peaceful, focused
on several specific job-related complaints, and caused little
disruption of productive for those employees who continued to
work. The Board further noted that in such circumstances, the
employees were entitled to persist in their in-plant protest for a
reasonable period of time. The Board found, however, that the
work stoppage exceeded a reasonable period. Even though the
employees were given assurances that the plant manager would
meet with them and they would be able to present their griev-
ances they nevertheless continued their work stoppage. The
Board found that the employees’ failure to return to work or to
leave the plant after the supervisor’s second directive resulted
in the forfeiture of the Act’s protection. Cambro at 636. In a
more recent case8 in which the majority relied on Cambro, the
Board found that an employer lawfully discharged 83 employ-
ees who refused to vacate its parking lot and who engaged in a
peaceful work stoppage to protest their terms and conditions of
employment. The Board noted that there were a number of
factors that weighed in favor of the employees’ rights. These
factors included the fact that the employees engaged in a peace-
ful work stoppage at all times and there was no evidence that
they ever tried to block ingress or egress to the employer’s
facility. They did not disrupt the employer’s operation or pre-
vent other employees from performing their duties. The em-
ployees did not seek to deprive the employer of the use of its
property and they were at all times on the outside of the em-
ployer’s facility, rather than the inside. The employees congre-
gated together to present their work-related complaints to the
employer in a concerted fashion and the employees were unrep-
resented without access to any formalized grievance procedure.
Notwithstanding the factors that weighed in the employee’s
favor, the Board nevertheless gave greater weight to the em-
ployer’s property interests based on the circumstances of the
case.
In Waco, Inc., 273 NLRB 746, 746 (1984), the Board af-
firmed the judge in finding that an employer lawfully dis-
charged nine unrepresented employees who refused to begin
their work after arriving at the employer’s facility. The em-
ployer offered to meet with the employees individually to ad-
dress their grievances; however, he declined to participate in a
mass meeting. The employees did not begin their work and
were terminated 3-½ hours after the employer offered to meet
with them individually. In dismissing the allegation that the
discharge of these employees violated the Act, the Board noted:
“[A]lthough employees who are unrepresented and are work-
ing without an established grievance procedure have a right to
engage in spontaneous concerted protests concerning their
8 Quietflex Mfg. Co., 344 NLRB 1055 (2005).
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
850
working conditions, the precise contours within which such
activity is protected cannot be defined by hard-and-fast rules.
Instead, each case requires that many relevant factors be
weighed. [Id. at 746.]
The Board’s reasoning follows the Supreme Court in its earlier
decision in Hudgens v. NLRB, 424 U.S. 507, 522 (1976), in
which the Court noted that the “locus of the accommodation”
between Section 7 rights and private property rights “may fall
at differing points along the spectrum depending upon the na-
ture and strength” of the respective rights in any given context.
Id. at 522.
2. Whether the employee’s were terminated on March 17, 2008
Counsel for the General Counsel asserts in his brief that the
present circumstances are distinguishable from those in Cam-
bro above. Counsel for the General Counsel argues that in the
instant case, the employees did not refuse to leave the facility
and did not refuse to return to work. In asserting that employ-
ees did not refuse to go to work, the General Counsel relies on
the testimony of David Reyna and Victor Corral. Reyna testi-
fied that he did not hear either Fulton or Chatagnier tell the
employees to return to work while Respondent tried to work
out a solution with ExxonMobil. In explaining why he did not
hear such a statement, he added that there were a “whole bunch
of crew people” assembled in the group. Corral admitted that
when Fulton spoke with the employees, he told them that he
needed to talk with ExxonMobil about the letter. Corral assert-
ed, however, that Fulton never told the employees to go to work
while he spoke with ExxonMobil. During cross-examination,
Corral was asked why the employees were milling about out-
side the lunch tent instead of going to their assigned work-
stations if they had not refused to go to work. In response,
Corral contended that the employees could not go to their as-
signed work area because they had not had their toolbox meet-
ing. In contrast to Corral’s testimony, however, David Reyna,
Victor Salazar, and Regina Williams testified that the toolbox
meeting did, in fact, occur on the morning of March 17, 2008.
Later in his testimony, however, Corral admitted that Fulton
asked the employees to return to work prior to ExxonMobil’s
busing the employees from the facility. Regina Williams also
admitted that Fulton asked employees to go to work and he told
them that he would see what he could do in response to their
letter. In her sworn affidavit to the Board, Williams acknowl-
edged that Respondent asked the employees to give Respondent
a day to work out a solution and the employees said, “No.” She
added that Respondent then asked to have until noon to work
out a solution and the employees also replied, “No.” Based on
the entire record, I find the testimony of Reyna, Salazar, and
Williams in this regard to be more credible than that of Corral
with respect to whether employees had participated in the
toolbox meeting. As discussed more fully below, Corral’s tes-
timony was not only inconsistent, but the testimony appeared in
parts to be somewhat contrived.
Aside from the fact that both Corral and Williams admitted
that Fulton asked employees to return to work prior to Exx-
onMobil’s removing them from the property, it is incredible
that Fulton would not have done so. This entire scenario oc-
curred on the first day of a very large and costly turnaround for
ExxonMobil. Respondent was given only a limited time to
construct and certify the readiness of scaffolding that was to be
used for the inspection and repair of 13 refinery units, including
its third largest fuel-producing refinery unit in the United
States. In addition to Respondent’s employees, there were
1000 additional employees who were scheduled to work on the
maintenance turnaround for the other maintenance contractors.
When faced with the fact that almost all of its day shift em-
ployees were not reporting to their scheduled work assign-
ments, it would have been inconceivable that Respondent
would not have asked the employees to go to work until Re-
spondent could work out a solution to the problem. With Exx-
onMobil representatives standing just inside the tent waiting for
their turnaround project to begin, it is unimaginable that Fulton
or Chatagnier would have spoken with the employees about
anything else other than their returning to work. Although
Victor Salazar testified that he did not recall hearing Fulton ask
the employees to go back to work, he admitted that he heard
from other employees that Fulton had asked the employees to
do so.
Additionally, there is no dispute that after the employees
were bused to the parking lot, Fulton went out to the parking lot
and spoke with the employees. When ExxonMobil removed
the employees from the parking lot, Wall and Chatagnier went
to the vacant lot to talk with the employees. And finally, even
after Wall and Chatagnier left the vacant lot, Wall telephoned
Corral again to talk about the employees’ returning to the facili-
ty. The undisputed evidence of Respondent’s supervisors
reaching out to the employees even after they left the facility
totally contradicts the employees’ assertions that they were
never asked to return to work. Additionally, I note that the
credible record evidence reflects facts not that dissimilar from
those in Quietflex Mfg. Co., involving the lawful discharge of
work stoppage employees even though they were outside the
employer’s facility.
3. Whether the record establishes a prima facie case of dis-
criminatory discharge
Under its landmark decision in Wright Line, 251 NLRB 1083
(1980), enfd. 662 F.2d 899 (1st Cir. 1981), cert. denied 455
U.S. 989 (1982), the Board adopted a framework to evaluate
alleged 8(a)(3) violations when the case turns on the employ-
er’s motive. In the instant case, General Counsel alleges that
the alleged discriminatees were discharged in violation of Sec-
tion 8(a)(1) of the Act and because of their having engaged in
protected concerted activity. In its decision in Phoenix Transit
System, 337 NLRB 510, 510 (2002), the Board explained that a
Wright Line analysis is not required in cases where it is undis-
puted that the employer took an adverse action against an em-
ployee for his or her engaging in protected concerted activity
and the action is alleged as a violation of Section 8(a)(1) of the
Act. As discussed above, Respondent not only disputes that the
employees engaged in protected concerted activity, but also
disputes that they were terminated for their actions. Thus, in-
asmuch as the present discharge issue turns on motive, the
Wright Line analysis may nevertheless be used. Alton H.
Piester, 353 NLRB 369, 373 (2008).
ATLANTIC SCAFFOLDING CO.
851
To establish a violation under Wright Line, the General
Counsel bears the burden of showing by a preponderance of the
evidence that the employees’ protected concerted activity was a
motivating or substantial factor in an adverse employment ac-
tion. The usual elements that are required to make such a
showing are protected activity by the employee, employer
knowledge of that activity, animus on the part of the employer,
as well as actual adverse action toward the employee.
Willamette Industries, 341 NLRB 560, 562 (2004). Once the
General Counsel has demonstrated such factors, the burden
then shifts to the employer to show that it would have taken the
same action even in the absence of the employee’s protected
activity. Manno Electric, 321 NLRB 278 fn. 12 (1996). In the
instant case, there is an issue with respect to all of the elements
that are necessary to establish a prima facie case. Respondent
not only asserts that it did not terminate the employees in re-
sponse to their work stoppage, but Respondent also asserts that
the employees were not engaging in protected activity.
In light of the total record evidence, Respondent’s argument
has merit. Arguably, when the employees presented their letter
to the Respondent on the morning of March 17, 2008, the em-
ployees were engaged in protected concerted activity that
would otherwise be protected by the Act. While the employees
were described as frustrated and agitated, there is no evidence
that they engaged in any physical violence or overtly disruptive
behavior that would have initially forfeited the protection of the
Act. Timekeeping Systems, Inc., 323 NLRB 244, 248 (1997).
Credible record evidence reflects, however, that Respondent
took no adverse action toward the employees in response to
their engaging in the protected concerted activity. There is no
dispute that both Fulton and Chatagnier spoke with the assem-
bled employees and assured the employees that Respondent
would speak with ExxonMobil in response to the employees’
demands. There is also no dispute that, as the ExxonMobil
official with responsibility for the turnaround procedure, Swan-
go made the decision that the employees could no longer re-
main on ExxonMobil property as they posed a safety risk to the
facility. Furthermore, there is no evidence that Swango did so
at Respondent’s urging or suggestion. Respondent’s desire for
the employees to return to their jobs is clearly demonstrated by
the fact that Fulton, Chatagnier, Wall, and King went out to talk
with the employees after ExxonMobil ejected the employees
from the facility.
Although Respondent’s supervisors and managers assisted
ExxonMobil security in the orderly evacuation of the employ-
ees and the retrieval of badges and monitors, they did so in
compliance with ExxonMobil’s exit procedure for the employ-
ees. The fact that Respondent’s supervisors assisted Exx-
onMobil with the employees’ exit does not support a finding
that in doing so Respondent terminated the employees. Had the
employees been sent out of the refinery because they were ter-
minated, there would have been no reason for Fulton,
Chatagnier, Wall, or King to go outside the refinery to meet
with the employees. Additionally, employee Reyna’s testimo-
ny contradicts the assertion that Respondent fired the employ-
ees. Although ExxonMobil’s entry and exit log does not reflect
that Safety Manager Harvey ever left the facility during the
morning of March 17, 2008, Reyna nevertheless recalled that
Harvey came to the parking lot. Reyna testified that when Exx-
onMobil security told the employees that they were fired, Har-
vey contradicted security, asserting that they were not fired.
Although it appears that Reyna was mistaken as to who made
this statement, Reyna obviously associated the comment with
Respondent’s management and may have erroneously credited
Harvey with the statement, rather than one of the other manag-
ers who came to the parking lot.
Although there is no dispute that Respondent issued termina-
tion notices to employees on March 19, 2008, Respondent did
so because there was no indication that the employees were
going to return to work. The General Counsel attributes much
significance to Fulton’s email to Swango on March 17, 2008,
after the work stoppage. Although Fulton identified for Swan-
go the employees who participated in the work stoppage, there
is nothing to indicate that Respondent had already terminated
the employees or that they were terminated for having partici-
pated in the work stoppage. Additionally, there is nothing to
indicate that Respondent was terminating 25 percent of the
employees as asserted by some of the employee witnesses.
The record also reflects that Victor Corral was one of the
principal participants in the work stoppage. The fact that an
undisputed supervisor engaged in a work stoppage of this mag-
nitude might be sufficient, in itself, to provoke an employer’s
animosity. Clearly, this did not appear to be the situation in the
instant case. Corral admitted that he understood that he could
return to work on March 17. He did not rebut Wall’s assertion
that Wall called him after 12:07 p.m. to ask one last time if any
of the employees wanted to return to work. Corral also
acknowledged that Respondent continued to maintain contact
with him after he left the facility on March 17, and even offered
him a raise if he would return to work. Although I note that the
date of the job offer occurred after the filing of the charge, Re-
spondent’s overall interaction with Corral was not consistent
with the kind of animus necessary to demonstrate a discrimina-
tory termination.
Thus, I do not find that the General Counsel has established
by a preponderance of the evidence that the employees’ work
stoppage was a motivating factor in the employees’ discharge.
The evidence reflects that ExxonMobil independently removed
the employees from the refinery with no direction from Re-
spondent. There is no evidence that ExxonMobil was a joint
employer with Respondent or even acted as an agent of Re-
spondent.
Despite the urging of Fulton, Chatagnier, and Wall, the em-
ployees did not attempt to return to the facility. One of the
more conflicting areas of testimony among all the witnesses is
the portion of testimony involving Respondent’s alleged state-
ment that only 75 percent of the employees could return to
work. Only Corral and Regina Williams testified that Fulton
told employees in the parking lot that only 75 percent of the
employees would be allowed to return to work. Employee
David Reyna denied however, that Fulton ever came out to the
parking lot to talk with employees. Victor Salazar didn’t recall
that any management officials came out to talk with employees
after their removal from the facility. He also recalled that em-
ployees were gathered in various separate areas outside the
facility.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
852
Both Chatagnier and Fulton denied that they ever told em-
ployees that only 75 percent of the employees could return to
work. Swango also denied telling Fulton or Chatagnier that
ExxonMobil would only allow 75 percent of the employees to
return to the facility. Wall is Respondent’s only supervisor
who admits talking with employees about the 75/25 ratio. Alt-
hough Wall asserts that he told Corral and Salinas that only 75
percent of the employees would be allowed to return to their
jobs, there is no evidence that Wall repeated this to any other
employees. Corral testified that Wall told him about the 75/25
ratio during a cell phone conversation. Wall, however, denied
that he told Corral about the ratio during the cell phone conver-
sation and asserts that the conversation occurred when he spoke
with Corral in the vacant lot.
Corral testified that when Chad King came out to the parking
lot, he mentioned that the employees should take the offer of 75
percent of the employees going back to work. David Reyna,
however, denied that Chad King made this statement to em-
ployees. Jose Rangel did not hear King mention that only 75
percent of the employees could return. Although David Reyna
testified that Respondent’s safety manager, Derek Harvey said
that only 75 percent of the employees could go back to work,
ExxonMobil’s gate entry records reflect that Harvey never left
the facility during the entire day on March 17, 2008.
Based on the entire record testimony, it is apparent that there
were discussions among employees concerning the alleged
return of only 75 percent of the employees. The fact remains,
however, that this rumor originated with the lowest- ranking
supervisor who spoke with the employees on March 17, 2008.
There is no credible evidence that either Fulton or Chatagnier
ever presented this option to the employees. Of the five em-
ployees who testified, only Corral and Williams attribute this
statement to Fulton. Additionally, I note that while Corral as-
serted that Chatagnier said that not everyone could return, he
allegedly only identified Victor Salazar and Jacinto Chapa as
the two employees who would not be allowed to return. Alt-
hough David Reyna asserts that Fulton and Chatagnier said that
only 75 percent could return, he contends that they told em-
ployees that they could select the 75 percent who would come
back and the 25 percent who would not. The allegation that
Respondent would allow employees to choose who would be
terminated is simply not credible. Overall, the record reflects
that while such a rumor may have initiated with a low level
supervisor, the credible record evidence does not support a
finding that Respondent terminated the employees on March
17, 2008, as alleged. I found both Fulton and Chatagnier’s
testimony to be consistent, plausible, and overall credible.
Wall’s testimony was contradictory in part. Although he alleges
that he told two employees that he had heard that only 75 per-
cent of employees could return to work, he also testified repeat-
edly that he urged Corral and others to return to work. The idea
that Chatagnier and Fulton would simply leave it up to the em-
ployees to determine who retained their jobs and who did not is
not plausible. While there was clearly some confusion among
the employees with regard to their employment status, the con-
fusion appeared to have resulted from rumors and mis-
information circulating among the disorganized group of em-
ployees. The confusion was further exacerbated by the fact that
employees were gathered in separate groups and conversing in
more than one language. A number of the employees obviously
depended on their fellow employees to not only communicate
with, but also to speak on their behalf, with Respondent’s non-
Spanish speaking officials.
In contrast to the variation in testimony concerning the limi-
tation of 75 percent of the employees returning, the overall
testimony confirms that employees were not told that they were
fired. Regina Williams testified that Fulton and Chatagnier
never told employees that they were fired. David Reyna also
denied that Chatagnier told employees that they were fired.
Although employees may have acted on misinformation and
rumor, there is insufficient evidence to show that Fulton and
Chatagnier told employees that they were fired when they
spoke with them on March 17, 2008. Based on the total record
evidence, I credit the testimony of Fulton and Chatagnier. Ad-
ditionally, Corral admitted that when Fulton, Chatagnier, and
Wall spoke with employees inside the facility, they never told
employees that they would be fired if they did not go to work.
Corral also acknowledged that even when Wall came to the
vacant lot to speak with the employees, he did not tell them that
they were fired. Corral further admitted that when he talked
with Wall by telephone from the parking lot, Wall indicated
that Respondent wanted the employees to return to work. Thus,
the total record evidence does not support a finding that Re-
spondent terminated the employees on March 17, 2008, as al-
leged.
Moreover, the record evidence also supports a finding that at
some point in time and prior to the employees’ termination on
March 19, 2008, the work stoppage, which began as protected
concerted activity, lost the protection of the Act. Accordingly,
the evidence is not sufficient to show that the employees’ par-
ticipation in the work stoppage was a motivating factor in the
employees’ discharge and I find no merit to the allegation that
these employees were discriminatorily discharged under Sec-
tion 8(a)(1) of the Act.
F. Supervisory Status of Respondent’s Foremen
1. The parties’ positions
The parties do not dispute that as general foremen Victor
Corral, and Jared LaJeune are excluded from the protection of
the Act as supervisors. Respondent asserts, however, that the
foremen on the turnaround are also supervisors under Section
2(11) of the Act. The General Counsel, however, submits that
Alfonso Garcia is a foreman and not a general foreman and that
he along with all the other foremen are not supervisors and are
fully protected by the Act.
2. The prevailing case law
Under Section 2(11) of the Act, a supervisor “means any in-
dividual having authority, in the interest of the employer, to
hire, transfer, suspend, layoff, recall, promote, discharge, as-
sign, reward, or discipline other employees, or responsibly to
direct them or to adjust their grievances, or effectively to rec-
ommend such action, in connection with the foregoing the ex-
ercise of such authority is not of a merely routine or clerical
nature, but requires the use of independent judgment.” The
enumerated powers in Section 2(11) are to be read in the dis-
ATLANTIC SCAFFOLDING CO.
853
junctive. Possession of one or more of the stated powers, how-
ever, does not convert an employee into a 2(11) supervisor
unless the exercise of such authority is not of a merely routine
or clerical nature, but requires the use of independent judgment.
Adco Electric Inc., 307 NLRB 1113, 1120 (1992). The Board
does not construe supervisory authority too broadly because the
employee who is deemed a supervisor loses his protected right
to organize. The Board has long held that the burden of prov-
ing that an individual is a supervisor is placed on the party al-
leging that supervisory status exists. Dean & Deluca New
York, Inc., 338 NLRB 1046, 1047 (2003); Masterform Tool
Co., 327 NLRB 1071, 1071 (1999). In Oakwood Healthcare,
Inc., 348 NLRB 686 (2006), and in accord with the Supreme
Court’s decision in NLRB v. Kentucky River Community Care,
532 U.S. 706 (2001), the Board reiterated that the burden of
proving supervisory status rests on the party asserting it. Addi-
tionally, the party seeking supervisory status must establish it
by a preponderance of the evidence. Dean & Deluca, supra at
1047; Bethany Medical Center, 328 NLRB 1094, 1103 (1999).
3. Respondent’s rationale and the record evidence
(a) Job description and organizational status
Respondent submits that as immediate supervisors for all
members of the crews, the foremen “shoulder the overall re-
sponsibility for erection of scaffolding at the job site.” In as-
serting that the foremen’s responsibility equates to supervisory
authority, Respondent points to the foremen’s job description
and to the fact that foremen are included as supervisors on the
Respondent’s organizational chart. Respondent’s job descrip-
tion for its foremen specifies that the foremen are responsible
for directing and supervising “lead carpenters, carpenters, and
carpenter helpers in the proper, timely, and safe installation of
scaffolding on the jobsite.” The job description also provides
that the foremen will train and instruct the crew members and
know and enforce all company policies and procedures as well
as all safety regulations on the job.
Although the portions of the job description upon which Re-
spondent relies may describe duties that could support a finding
of supervisory status, such description alone is not dispositive
of the exercise of such duties. A finding of supervisory status
cannot be based solely on a job description. Like a job title, the
job description is not determinative of supervisory status. The
issue is whether the individual actually possesses any of the
powers enumerated in Section 2(11) of the Act. Western Union
Telegraph Co., 242 NLRB 825, 826 (1979). Through the tes-
timony of Fulton, Respondent offered into evidence a copy of
its organizational chart. Fulton testified that the document was
prepared prior to Respondent’s hiring its full complement of
workers for the turnaround. The chart lists nine individuals in
the organizational “box” beneath Wall’s name and identifies
those individuals as foremen. Neither Victor Corral nor any
other designated foreman on the chart is designated as a “gen-
eral foremen.” Additionally, there is a listing of five individu-
als identified only as “yard crew” under the authority of the
manager for QA/QC Inventory. Although Fulton confirmed
that the chart reflects the supervisory or management team for
Respondent at the Beaumont facility, the arrangement of the
chart appears to place the foremen on the same level as the
“yard crew.” Additionally, I note that tables of organization
and job descriptions have not been found to be sufficient to vest
supervisory powers. NLRB v. Security Guard Service, 384 F.2d
143, 149 (5th Cir. 1967). As the Fourth Circuit Court of Ap-
peals pointed out in a very early decision, “It is equally clear
that the employer cannot make a supervisor out of a rank and
file employee simply by giving him the title and theoretical
power to perform one or more of the enumerated supervisory
functions. The important thing is the possession and exercise
of actual supervisory duties and authority and not the formal
title.” NLRB v. Southern Bleachery & Print Works, Inc., 257
F.2d 235 (4th Cir. 1958), cert. denied 359 U.S. 911 (1959).
Accordingly, I do not find the job description for foremen or
the organizational chart to be dispositive of supervisory status.
(b) Authority to hire, fire, and discipline employees
While authority to hire and fire employees is not a requisite
element of supervisory status,9 the exercise of such authority is
certainly determinative in establishing supervisory status. The
instant record contains no evidence that foremen either hire or
fire other employees and Foremen David Reyna and Jose
Rangel both testified that they did not have the authority to hire
employees or to discipline employees. Although Wall testified
that foremen have the authority to discipline employees for
engaging in misconduct, he gave no specific examples of their
having done so. Foreman Reyna testified that if he saw a crew
member failing to ‘tie off” before getting on scaffolding, he
could correct the worker to work safely and he would tell the
worker to tie off before getting on the scaffolding. Respondent
asserts that such authority supports a finding that foremen have
the authority to discipline crew members. I note, however, that
while Reyna acknowledged that he could tell a crew member
that he needed to tie off without first getting the permission of
the general foreman; he also testified that his doing so would
involve only a minor safety violation that required a reminder
to the crew member to do the right thing before mounting the
scaffold.
Foreman Rangel also testified that if he observed a crew
member engaging in a very serious safety violation, he had the
right to go to the general foreman and report the violation. Alt-
hough Rangel asserted that he could recommend that the person
be removed from the job if the employee were “violating safety
rules left and right,” there is no evidence that he has done so or
evidence to show whether a general foreman has acted on the
recommendation without independent investigation. Fulton
also asserted that if a foreman observed a crew member work-
ing in an unsafe manner, he had the authority to pull the crew
member aside and talk to him about his work. Fulton testified
that a foreman could counsel a crew member about their work
habits or safety issues without getting advance permission from
the general foreman. Fulton further asserted that a foreman
could give the employee a verbal warning or a written repri-
mand. Respondent presented no documentary evidence, how-
ever, to demonstrate that foremen have issued verbal or written
warnings to other employees.
9 Angeli’s Super Valu, 197 NLRB 85 (1972).
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
854
(c) The daily toolbox meetings
Respondent asserts that foremen generally led the daily
toolbox safety meetings, with input from all crew members.
Respondent presented a number of documents that were identi-
fied as daily safety meeting sign-in sheets. The individual
sheets identify the date, the date of the week, and the shift. The
sheets contain 30 separate lines for employees to list their
printed name, classification, signature, badge number, and the
time at which they signed the sheet. The name of the foreman
is also completed at the top of the sheet. On the individual
sheets, the foreman identified at the top of the sheet is also
included in the listing of employees, along with signature, time
of signing in, and other requisite information. Fulton testified
because the foremen identified on the sheet had the highest
level classification, they would have been the person who
would have conducted the safety meetings. Fulton asserted that
if a general foreman conducted the meeting, he would have
been required to sign the sheet as well. Foreman Reyna, how-
ever, testified that he had never conducted a safety meeting. He
asserted that the forms were merely a means by which the gen-
eral foremen determined who was present that day and the
forms were not used to document the safety meeting. Reyna
explained that each contractor held their own toolbox meetings
and that the meetings were conducted by the general foremen
and never by the foremen. Foreman Rangel additionally testi-
fied that the general foreman conducted the toolbox meetings.
Despite Respondent’s assertions that the foreman led these
meeting, Respondent presented no evidence to show that the
foremen independently selected the topics or information to be
discussed. There is, in fact, nothing to show that foremen con-
veyed any information to employees that had not already been
covered in the larger contractorwide meeting with ExxonMobil
or that had not been received by the foreman from the general
foremen. A foreman’s simply passing along or communicating
assignments or information that has been directed by the gen-
eral foreman or higher management does not reflect the type of
discretion indicative of supervisory status. Somerset Welding
& Steel, Inc., 291 NLRB 913, 914 (1988). Thus, even if the
foremen held the highest level classification during these meet-
ings, there is insufficient evidence to show that they exercised
any independent judgment in presenting assignments or safety
information to the other employees.
(d) Recommendations and evaluations
In asserting that its foremen have the authority to recom-
mend the advancement or promotion of their crew members,
Respondent relies on Fulton’s testimony concerning evalua-
tions. Fulton testified that foremen have the authority to com-
plete employee evaluations and are required to do so every 90
days. Although Turnaround Supervisor Wall testified that
foremen have the authority to conduct employee evaluations, he
could not give any specific examples of their having done so.
During direct examination, General Foreman Victor Corral
testified that Respondent’s foremen did not conduct employee
evaluations. During cross-examination, however, Corral con-
firmed that foremen prepare evaluations on their crew members
and the evaluations are used to move an employee into a higher
pay classification. During redirect examination, Corral testified
that he was unaware of any of the alleged foremen having pre-
pared an evaluation of other employees. Both Reyna and
Rangel testified that they did not have the authority to conduct
employee evaluations. Despite all of the contrasting infor-
mation with respect to foremen evaluations, Respondent sub-
mitted no documentary evidence to support its assertion that
foremen conduct employee evaluations.
Wall asserted that foremen have the authority to approve an
employee leaving the worksite as an “early out.” Corral, how-
ever, testified that an employee’s request for an early out must
be reported to the general foreman; who in turn reports the
request to Wall for a final decision. On cross-examination,
Corral explained that he would take into account the foreman’s
recommendation or information about whether the employee is
dispensable to the job and then he would formulate a recom-
mendation to Wall based on his general knowledge of all of the
work being performed on the job. On redirect examination,
however, Corral denied that he made any recommendation to
Wall when he reported an employee’s request for an early out.
Corral acknowledged that if a project is winding down and
some of the employees must be laid off, he would get feedback
from the foremen about the employees’ skills in order to rec-
ommend employees for layoff. Corral was not asked to provide
any specific examples of when he has done so and Respondent
did not provide documentation to support such recommenda-
tions. Fulton testified that if an employee has more skills than
necessary for the job for which he was hired, the foreman could
go to the general foreman and superintendent and recommend
the employee for a higher classification. Although Fulton as-
serted that this happens often during a turnaround, he provided
no specific examples of when this has occurred.
(e) Assignment and direction of work
Respondent asserts that the “foremen were responsible for
assigning each crew member to the particular duties they need-
ed to perform to build, modify, or demolish a particular scaf-
fold.” Turnaround Supervisor Wall testified that the general
foremen spend their day rotating from foreman to foreman to
review the progress of each crew. He further asserted that the
foremen are responsible for directing and assigning work to the
individual crews. General Foreman Victor Corral testified that
once a general foreman approved any modifications for particu-
lar scaffolding, the general foreman assigned the lead carpenter,
the carpenter, and the carpenter’s helper to their respective
duties to accomplish those modifications. Corral acknowl-
edged that it was the foreman’s responsibility to oversee that
the modification was performed correctly. Regina Williams
was hired as carpenter’s helper for the 2008 turnaround. She
testified that the foreman not only gave the work assignments
to the crew members, but also checked on the progress of the
work.
Wall testified after receiving the work schedule from the
general foremen, the foremen then explain the daily work
schedule to the three-man crews. Wall also asserted that in
carrying out the work schedule, the foreman could transfer
employees from one crew under his direction to another crew
under his direction without getting permission from the general
foreman. The foreman is responsible for deciding the order of
ATLANTIC SCAFFOLDING CO.
855
the work performed by each crew. Wall also testified that if an
ExxonMobil contractor or a representative of ExxonMobil re-
quested a modification in a scaffold directly from the foreman,
the foreman could make the modification without getting the
approval of the general foreman. The foreman would then
instruct the crew as to how to effect the modification.
Respondent submits that the foreman’s supervisory respon-
sibilities involve completing daily activity reports (DAR’s.)
The DAR’s record the hours worked by employees on the crew
and also all activities that the crew performs each day. Re-
spondent asserts that the DAR’s are “some of the most im-
portant documents that Atlantic maintains on a job site, and,
therefore, are entrusted only to supervisors at the foreman level
and above to complete.” The DAR’s submitted into evidence
are captioned “Beaumont Refinery Daily Activities Report.”
The form contains the name of the contractor for ExxonMobil
along with the date of the activity. The form contains the
names and signatures of employees, along with the total num-
ber of hours worked by each employee for the specific date.
There is also a section of the form for a narrative description of
the daily work completed, scope changes, delays, and revisions.
At the bottom of each form, there is a line for the signature of
the contract foreman and the ExxonMobil contract representa-
tive. General Foreman Victor Corral, along with Foremen
Reyna and Rangel, all testified that all of the entries listed un-
der “daily work completed” on the forms were based on work
assignments give by the general foremen to the foremen. Ful-
ton also acknowledged that if the foremen needed approval of
the general foreman or if the work was completed at the general
foreman’s direction, the general foreman would not sign the
DAR and there would be no indication on the form itself that
the general foreman approved or assigned the work. Wall also
testified that a general foreman, a foreman, or “anyone” could
fill out the forms. He explained that he also completes the
forms on occasion. Accordingly, while a foreman’s name and
signature may appear on the form, the record is insufficient to
show that the work described or the hours worked by the listed
employees was solely authorized or directed by the foremen
whose names appear on the form.
4. Conclusions concerning the supervisory status of foremen
There is no dispute that the individual crew members re-
ceived their work assignments from the foreman assigned to
their crew. The evidence reflects that the foreman is the con-
duit for instructions to employees from the general foreman as
well as from ExxonMobil and their other contractors. There is
no evidence that employees receive assignments, notice of nec-
essary modifications, or even correction from individuals other
than the foremen. The issue, however, is the extent to which
the foremen exercise the requisite independent judgment in
making assignments and directing the work of the individual
crew members.
On September 29, 2006, the Board decided three cases which
dealt specifically with the issue of whether a purported supervi-
sor either “assigns” or “responsibly directs” other employees.10
10 Oakwood Healthcare, Inc., 348 NLRB 686 (2006); Croft Metals,
Inc., 348 NLRB 717 (2006); and Golden Crest Healthcare Center, 348
NLRB 727 (2006).
Using the Board’s interpretation in Oakwood Healthcare, Inc.,
the authority “responsibly to direct” exists when an individual
decides “what job shall be undertaken next or who shall do it
. . . provided the direction is both ‘responsible’ . . . and carried
out with independent judgment.” Oakwood Healthcare at 691.
In its interpretation of “responsible” direction, the Board ex-
plained “the person performing the oversight must be account-
able for the performance of the task . . . such that some adverse
consequence may befall the one providing the oversight if the
tasks performed are not performed properly.” Id. at 692. Ac-
cordingly, “to establish accountability for responsible direction,
it must be shown that the employer delegated to the putative
supervisor the authority to direct the work and the authority to
take corrective action, if necessary. It also must be shown that
there is a prospect of adverse consequences for the putative
supervisor if he/she does not take these steps.” Id. at 692.
While the record may reflect that the foremen are responsible
for organizing and executing the work, Respondent has pre-
sented no evidence of “actual accountability” to prove that the
foremen “responsibly direct” the work of the crews. There is
no documentary evidence to show that any foremen has been
disciplined, demoted, or in any way adversely affected by his
performance in directing the individual crew members. Id. at
731.
In its decision in Oakwood Healthcare, Inc., the Board also
clarified that “independent judgment” means that “an individual
must at a minimum act, or effectively recommend action free of
the control of others and form an opinion or evaluation by dis-
cerning and comparing data” provided that the act is “not of a
merely routine or clerical nature.” 348 NLRB at 9. In the in-
stant case, the foremen direct the work of their crews based
upon the pre-established work schedule provided to them by the
general foremen. There is no dispute that foremen receive the
daily work schedule directly from the general foremen. Wall
testified that after the morning safety meeting and toolbox
meeting, it is the responsibility of the general foreman to go
into the field and to make sure that the foremen have placed
their crews in the right places. The general foremen then com-
municate with the contractors and supervisors to determine if
anything has changed in work scope for the day. If there are
any changes that cause a shift in work priority, the general
foreman directs his foremen to move crew members to address
the priority. Thereafter, the general foremen rotate from fore-
man to foreman to review the work progress.
Respondent asserts that determining the type of a scaffold to
build, as well as the proper job setup requires the foremen to
use their independent discretion and judgment. In its decision
in Oakwood Healthcare Inc., the Board noted that for an indi-
vidual to responsibly direct with independent judgment, the
individual needs to exercise “significant discretion and judg-
ment in directing others,” Oakwood Healthcare Inc., supra at
fn. 38. As the Board has also noted in its decision in Franklin
Home Health Agency, 337 NLRB 826, 830 (2002), the burden
is on the party alleging supervisory status to establish that the
putative supervisor exercises independent judgment by submit-
ting “concrete evidence showing how the decisions are made.
Ibid.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
856
Respondent also submits that the foremen were responsible
for assigning each crew member to the particular duties they
needed to perform to build, modify, or demolish a particular
scaffold. Although the Respondent acknowledges that the
foremen receive the daily work schedule from the general
foremen, Respondent contends that the foremen are permitted
to deviate from that schedule and to identify and execute modi-
fications that are needed. In asserting this kind of independ-
ence in identifying and executing modifications, Respondent
relies on the testimony of Swango, who did not supervise the
work of Respondent’s foremen. When asked if the foremen can
modify the scaffolds without getting authorization from the
other contractors or from ExxonMobil, Swango simply con-
firmed that the scaffolds belong to Respondent and Respondent
can make those modifications without approval of ExxonMobil.
Swango also clarified that he did not know whether foremen
required the approval of the site superintendent or the general
foremen before making those modifications. General Foreman
Corral acknowledged, however, that the foremen assigned the
crew members the duties needed to accomplish a modification
after receiving the authorization from the general foreman.
In its decision in Oakwood Healthcare, Inc., 348 supra at
689, the Board also clarified how it would analyze the authority
to “assign” with respect to determining supervisory status for
an individual. The Board explained that it would construe the
term “assign” to refer to the “act of designating an employee to
a place (such as location, department, or wing), appointing an
employee to a time (such as a shift or overtime period), or giv-
ing significant overall duties, i.e., tasks, to an employee.” The
Board went on to note, however, that simply determining the
order in which an employee will perform discrete tasks within
those assignments would not be indicative of exercising the
authority to ‘assign.’” Id. at 689.
With respect to the assignment of work in general, Regina
Williams testified that the foreman gives the work orders to the
lead carpenter, the carpenter, and the helper. The foreman also
gives instructions and guidance as to whether to build the scaf-
fold or whether to dismantle the scaffold. She also explained
that if the foreman was not on the jobsite with the crew, the
crew leader had the authority to send crew members to pick up
materials and supplies in the same way that a foreman would
send employees for these items. Although Wall and Chatagnier
testified that the foremen have the authority to assign work to
the crew members, Respondent provided no testimony or doc-
umentary evidence to show how foremen made the decisions to
assign the respective crew members to the scaffold-building
duties. The Board has long recognized that purely conclusion-
ary evidence, without specific explanation that the purported
supervisor in fact exercised independent judgment does not
establish supervisory authority. Voltaire Contractors, Inc., 341
NLRB 673, (2004); Dynamic Science, Inc., 334 NLRB 391,
393 (2001); Sears, Roebuck & Co., 304 NLRB 193, 194 (1991).
Thus, the overall record demonstrates that the foremen
communicate the work assignments to the crews and are re-
sponsible for carrying out the assignments. There is not, how-
ever, evidence to show that the foremen are disciplined for the
work performed by the crew members or documentation to
show that foremen evaluate, discipline, or reward crew mem-
bers for the work performed. Overall, the record evidence does
not establish that any direction or assignment by foremen is
based upon anything other than experience and knowledge of
the craft skills necessary to erect the scaffolding. North Shore
Weeklies, Inc., 317 NLRB 1128 (1995). The foremen’s as-
signments of different jobs to their respective crews demon-
strates nothing more than the knowledge expected of experi-
enced persons regarding which employees can best perform
particular tasks. Quadrex Environmental Co., 308 NLRB 101
(1992).
Accordingly, the record does not support a finding that the
foremen employed by Respondent during the ExxonMobil
turnaround project functioned as supervisors within the mean-
ing of Section 2(11) of the Act.
G. Alfonso Garcia’s Status
Respondent asserts that Alfonso Garcia is precluded from the
protection of the Act because he was a general foreman during
the 2008 turnaround. Victor Corral testified, however, that
only he and Jared LeJuene were general foremen on the day
shift. Foreman David Reyna also confirmed that only Corral
and LeJeune were general foremen. Corral, Reyna, and Salazar
all identified Garcia as a foreman on the turnaround. Salazar,
in fact, testified that Garcia was his foreman on the job. Corral
testified that Garcia was a foreman who reported directly to
him on the job and was assigned two to three crews. Respond-
ent submitted no evidence to support its contention that Garcia
was a general foreman rather than a foreman. Accordingly,
based upon the total record evidence, I do not find that Alfonso
Garcia functioned as a general foreman during the 2008 turna-
round in issue.
CONCLUSIONS OF LAW
1. Atlantic Scaffolding Company is an employer engaged in
commerce within the meaning of Section 2(2), (6), and (7) of
the Act.
2. Respondent did not engage in conduct violative of the Act
as alleged in the complaint.
On these findings of fact and conclusions of law and on the
entire record, I issue the following recommended11
ORDER
The complaint is dismissed.
11 If no exceptions are filed as provided by Sec. 102.46 of the
Board’s Rules and Regulations, the findings, conclusions, and recom-
mended Order shall, as provided in Sec. 102.48 of the Rules, be adopt-
ed by the Board and all objections to them shall be deemed waived for
all purposes.