358 NLRB 116
UNITE HERE Local 1 (The Ritz-Carlton Chicago)
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
358 NLRB No. 22
116
Unite Here Local 1 and Ritz-Carlton Water Tower
Partnership. Case 13–CB–019622
March 23, 2012
DECISION AND ORDER
BY CHAIRMAN PEARCE AND MEMBERS FLYNN
AND BLOCK
On November 29, 2011, Administrative Law Judge
Paul Buxbaum issued the attached decision. The Re-
spondent filed exceptions and a supporting brief, the Act-
ing General Counsel filed an answering brief, and the
Charging Party Employer filed a brief in opposition to
the Respondent’s exceptions. Thereafter, the Respondent
filed a reply brief in support of exceptions.
The National Labor Relations Board has delegated its
authority in this proceeding to a three-member panel.
The Board has considered the decision and the record
in light of the exceptions and briefs and has decided to
affirm the judge’s rulings, findings,1 and conclusions and
to adopt the recommended Order as modified.2
1 In September 2009, the Respondent and the Employer entered into
a “me-too” agreement generally binding them to the terms of a collec-
tive-bargaining agreement to be negotiated between the Respondent
and the Sheraton Chicago Hotel, but carving out, in par. III of the
agreement, certain issues to be bargained directly. The judge found
that the agreed-upon carve-out encompassed nine issues, and that the
Respondent subsequently refused to bargain about six of them. The
judge found that the Respondent thereby violated Sec. 8(b)(3), and then
rejected the Respondent’s contention that the parties’ dispute should be
deferred to arbitration under Collyer Insulated Wire, 192 NLRB 837
(1971). The Respondent excepts, inter alia, to the judge’s failure to
consider whether deferral was appropriate before he decided the merits
of the 8(b)(3) allegation. We find that any error in this regard was
harmless. Considering the deferral issue first, we find that deferral is
not appropriate for the reasons that the judge stated as to why the issue
is not eminently well suited to resolution by arbitration. Second, we
find that the Respondent violated the Act for the reasons that the judge
set out in his discussion of the substantive 8(b)(3) issue.
2 Relying on Doubletree Guest Suites Santa Monica, 347 NLRB 782
(2006), the Respondent contends that if the Board decides that deferral
is not appropriate, it should remand the case to the judge to afford the
Respondent an opportunity to present evidence regarding the meaning
of the “me-too” agreement. We find this argument without merit.
Doubletree is readily distinguishable. In that case, the fact that the
respondent entered into a settlement agreement with the General Coun-
sel obviated the need to litigate certain complaint allegations. When
the Board set aside that settlement agreement, the respondent’s pre-
settlement conduct became relevant, and the Board remanded the pro-
ceeding to the judge to permit the parties to litigate the reinstated alle-
gations. In the present case, by contrast, the Respondent was not pre-
cluded from litigating the substantive 8(b)(3) issue, but chose not to do
so, opting instead to rely solely on its deferral defense. In these cir-
cumstances, we find that a remand is not appropriate.
We shall modify the judge’s recommended Order to conform to the
Board’s standard remedial language, and we shall substitute a new
notice to conform to the Order as modified.
ORDER
The National Labor Relations Board adopts the rec-
ommended Order of the administrative law judge as
modified below and orders that the Respondent, UNITE
HERE Local 1, Chicago, Illinois, its officers, agents, and
representatives, shall take the action set forth in the Or-
der as modified.
1. Substitute the following for paragraph 1(c).
“(c) In any like or related manner restraining or coerc-
ing members and employees in the exercise of the rights
guaranteed them by Section 7 of the Act.”
2. Substitute the following for paragraph 2(c).
“(c) Within 14 days after service by the Region, deliv-
er to the Regional Director for Region 13 signed copies
of the notice in sufficient number for posting by the Em-
ployer at its Chicago, Illinois facility, if it wishes, in all
places where notices to employees are customarily post-
ed.”
3. Substitute the attached notice for that of the admin-
istrative law judge.
APPENDIX
NOTICE TO MEMBERS AND EMPLOYEES
POSTED BY ORDER OF THE
NATIONAL LABOR RELATIONS BOARD
An Agency of the United States Government
The National Labor Relations Board has found that we vio-
lated Federal labor law and has ordered us to post and obey
this notice.
FEDERAL LAW GIVES YOU THE RIGHT TO
Form, join, or assist a union
Choose representatives to bargain on your behalf
with your employer
Act together with other employees for your bene-
fit and protection
Choose not to engage in any of these protected
activities.
WE WILL NOT repudiate our Memorandum of Agree-
ment with the Ritz-Carlton Water Tower Partnership.
WE WILL NOT fail and refuse to bargain with the Ritz-
Carlton Water Tower Partnership regarding the topics
that are subject to collective bargaining under the terms
of our memorandum of agreement.
WE WILL NOT in any like or related manner restrain or
coerce you in the exercise of the rights listed above.
WE WILL, on request, bargain with the Ritz-Carlton
Water Tower Partnership regarding the topics that are
subject to collective bargaining under the terms of our
memorandum of agreement, and if an understanding is
UNITE HERE LOCAL 1 (RITZ-CARLTON WATER TOWER )
117
reached WE WILL embody the understanding in a signed
agreement.
UNITE HERE LOCAL 1
Kevin McCormick, Esq., for the General Counsel.
Kristin L. Martin, Esq., of San Francisco, California, for the
Respondent.
Thomas J. Posey, Esq., of Chicago, Illinois, for the Charging
Party.
DECISION
STATEMENT OF THE CASE
PAUL BUXBAUM, Administrative Law Judge. This case was
tried in Chicago, Illinois, on August 1, 2011. The charge was
filed January 7, 2011, and the complaint was issued on March
25.
The complaint alleges that the Union, Unite Here Local 1,
violated the Act by failing and refusing to bargain over certain
terms and conditions of its members’ employment that it had
previously agreed were subject to such bargaining. This con-
duct is alleged to violate Section 8(b)(3) of the Act. The Union
filed an answer to the complaint denying the material allega-
tions of wrongdoing and asserting as a procedural defense that
the Board’s policies required that the matter be deferred to
arbitration.
For the reasons that I will describe in detail in this decision, I
find that the Union did violate the bargaining obligation im-
posed on it by the Act. I further conclude that the Board’s poli-
cies regarding deferral to arbitration are not intended to be ap-
plicable to the circumstances presented in this case.
On the entire record,1 including my observation of the de-
meanor of the witnesses, and after considering the briefs filed
by the General Counsel, the Charging Party, and the Respond-
ent, I make the following
FINDINGS OF FACT
I. JURISDICTION
The Charging Party, a corporation, operates a hotel at its fa-
cility in Chicago, Illinois, where it annually derives gross reve-
nues in excess of $500,000 and purchases and receives at its
Chicago facility goods and materials valued in excess of
$50,000 directly from points outside the State of Illinois. The
Respondent admits,2 and I find, that the Charging Party is an
employer engaged in commerce within the meaning of Section
2(2), (6), and (7) of the Act and that the Respondent is a labor
organization within the meaning of Section 2(5) of the Act.
1 The transcript of the proceedings is quite accurate. The only mate-
rial correction is the erroneous use of the word “form” in three loca-
tions where the intended term was “forum.” (See Tr. at p. 74, L. 20; p.
75, L. 18; and p. 79, L. 11.) Any other errors of transcription are not
significant.
2 See Respondent’s answer to the complaint, pars. II and III. (GC
Exh. 1(e), p. 1.)
II. ALLEGED UNFAIR LABOR PRACTICES
A. The Facts
Before setting out my findings of fact, it is appropriate to
discuss the state of the evidentiary record. The General Coun-
sel and the Employer produced the testimony of two witnesses,
Kyle Johansen and Thomas Posey, both of whom are attorneys.
Johansen represented the Ritz-Carlton in labor relations from
2004 through 2010. Posey took over those matters from Johan-
sen during the summer of 2010. While the Respondent pre-
sented certain documentary evidence in its case, it chose not to
call any witnesses. As a consequence, the testimony of Johan-
sen and Posey is uncontroverted.
In evaluating the probative value of the witnesses’ testimony,
its uncontroverted status is obviously significant. Nevertheless,
I recognize that both logic and Board precedent teach that addi-
tional analysis is required. See Jupiter Medical Center Pavil-
ion, 346 NLRB 650, 652 (2006) (Board upholds trial judge’s
rejection of uncontroverted testimony which the judge deemed
to be incredible). In this case, I found the manner of presenta-
tion of the two witnesses to be clear and persuasive. I was also
impressed by the fact that there were no significant internal or
external contradictions in their accounts. Most compellingly, I
found their description of the key events to be powerfully cor-
roborated by documentary evidence that was created contempo-
raneously with the unfolding events at the heart of the contro-
versy. The Board has acknowledged that this is a weighty con-
sideration in evaluating evidence. See Domsey Trading Corp.,
351 NLRB 824, 836 (2007) (a finding that contemporaneously
created documentary evidence is “entitled to greater weight
than contradictory testimonial evidence is consistent with
Board law”). For all of these reasons, I have concluded that the
testimony of Johansen and Posey was reliable.
I will now describe the sequence of events that led to this lit-
igation. Unite Here Local 1 has represented employees of the
Ritz-Carlton Water Tower Hotel for decades.3 Prior to 2006,
the parties engaged in collective bargaining through the mecha-
nism of a multiemployer bargaining group involving many
hotels in the Chicago area. However, in 2006, the Union ad-
vised that it would no longer bargain with the group if it in-
cluded hotels owned by Hilton. After that, certain major hotel
chains withdrew from the multiemployer group. Still other
hotels, including the Ritz-Carlton, chose a different approach.
This was described by Johansen, who testified that the Ritz-
Carlton and a number of other hotels, “adopted a ‘me too’ ap-
proach, meaning that they would adopt the collective-
bargaining agreement between the Sheraton Chicago and Unite
Here.” (Tr. 65.)
3 Counsel for the Respondent reported that the bargaining repre-
sentative for those employees is technically the Chicago Joint Execu-
tive Board whose members consist of Unite Here Local 1 and Unite
Here Local 450. No party deemed it necessary to amend the complaint
in this regard.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
118
Following this procedure, the Union and the Ritz-Carlton
agreed to adopt the collective-bargaining agreement negotiated
by the Sheraton and the Union. This procedure was imple-
mented, leading to a collective-bargaining agreement between
the parties that commenced on September 1, 2006 and was
scheduled to expire on August 31, 2009. (Jt. Exh. 1.)
During the summer of 2009, the Union and the various hotel
employers began the process of negotiating new agreements.
In July, the Union suggested to various hotels, including the
Ritz-Carlton, that they enter into written “me too” agreements
that would bind them to the terms of the collective-bargaining
agreement that it would eventually negotiate with the Sheraton.
The template for such “me too” agreements was drafted by the
Hotel Employers Labor Relations Association (HELRA) and its
subordinate arm, the Chicago Area Hotel Group (CAHG).
Johansen explained that the Ritz-Carlton clearly intended to
subscribe to the “me too” method of proceeding for the upcom-
ing round of collective bargaining. Nevertheless, the hotel had
some unique concerns that it wished to address with the Union.
Management of the hotel raised this matter with Johansen and
presented him with a chart listing the topics of concern and
describing both the current established practice and the desired
modifications. (GC Exh. 2.)
Management’s list of established practices for which it
wished to negotiate changes with the Union contained nine
such topics. These topics were:
1. Reduce the fee paid to employees assigned to carv-
ing or other specialty stations and change the applicable
scheduling procedures. Reduce the fee paid in lieu of a
gratuity to bell attendants for delivery of luggage to vacant
rooms.
2. Reassign the two staff cafeteria cooks to the main
kitchen. Increase the number of private in-room bars that
are to be serviced per shift.
3. Increase the work schedule for housekeepers from
7.5 to 8 hours per shift, including elimination of the paid
15 minute break.
4. Reduce the payments for making up roll-away and
sofa beds and limit those payments to room attendants on-
ly.
5. Lower the room credit reduction for housekeepers
based on the number of “check-out” rooms per shift.
6. Pay all new employees at the union contract rate in-
stead of the “Ritz Rate.”
7. Eliminate the bargaining unit’s beverage manager
position.
[GC Exh. 2.]
As requested by his client, in late July 2009, Johansen ap-
proached Henry Tamarin, the president of the Union. His pur-
pose was to “discuss the possibility of having discussions over
items that the hotel wanted to negotiate over that were not nec-
essarily part of the collective-bargaining agreement that would
have to be negotiated between Local 1 and the Sheraton.” (Tr.
69.) Johansen testified that, as outlined in the chart he was
given by management, there were nine such items that the hotel
wished to discuss. Each of them concerned a situation where
the Ritz was providing greater pay or improved working condi-
tions compared to those established in the “me too” collective-
bargaining agreement.
Johansen explained the legal background supporting this ap-
proach to the Union. He noted that the hotel was “looking for
relief on, not to change the [parties’ eventual “me too”] contract
but to change the practice essentially.” (Tr. 70.) This concern
arose from the fact that the current collective-bargaining
agreement contained a “Maintenance of Existing Privileges”
section that provided:
No employee shall, as a result of the signing of this Agree-
ment, suffer a reduction in his wages nor be deprived of any
established and recognized benefits or privileges in excess of,
or more advantageous than, the contract provisions.
(Jt. Exh. 1, sec. 11, p. 7.) Johansen reported that he anticipated
that the new “me too” agreement would contain the same lan-
guage.
Beyond potential liability for breach of contract, I note that
the Employer’s concern regarding this issue reflects an accurate
appreciation of the principles of labor law applicable to unilat-
eral changes in terms and conditions of employment. Thus, the
Board holds that an established practice becomes an implied
term and condition of employment even if it is not included in
the parties’ collective-bargaining agreement. When this occurs,
a unilateral change to such a practice would generally constitute
an unfair labor practice within the meaning of Section 8(a)(5)
of the Act. Lafayette Grinding Corp., 337 NLRB 832, 832
(2002).4 Thus, the hotel recognized that, in order to alter its
established practices in the nine areas of concern, it would be
required to afford the Union an opportunity to engage in bar-
gaining.
Johansen reported that, before he had a chance to raise the
matter with the Union, he was approached by Tamarin regard-
ing the Ritz’s failure to sign the HELRA “me too” agreement.
Tamarin asked if there was going to be a problem with the Ritz
joining in the “me too” arrangement for the current round of
contract negotiations. Johansen explained that there was not a
problem, but that the Ritz was not “necessarily” prepared to
sign the HELRA “me too” agreement that had been provided to
the various hotels. (Tr. 74.) He told Tamarin that, “there were
a number of items that we all knew that the Ritz was paying
beyond the contract, and that we wanted a forum to sit down
and try and work through these issues.” (Tr. 74.)
Tamarin responded that the Union was “more than willing to
sit down and talk . . . but that he wanted my assurance that,
ultimately, that the Ritz would be going along with a Me Too
agreement in some form.” (Tr. 76.) He also raised an addition-
al concern about the Ritz’s request, noting that he “wanted to
avoid any appearance that the Ritz may be getting a better deal
than the other hotels.” (Tr. 76.) Thus, he wished to avoid giv-
ing other hotels “an incentive or a roadmap on how to try and
extract more from the union.” (Tr. 76.) Having aired these
4 For an example of this principle applied to a hotel employer, see
Rosdev Hospitality, Secaucus, LP, 349 NLRB 202, 203 (2007) (in
successorship case, new owner could not unilaterally modify estab-
lished seniority accrual practice even though the modification “tracked
the literal terms” of the predecessor’s collective-bargaining agreement).
UNITE HERE LOCAL 1 (RITZ-CARLTON WATER TOWER )
119
considerations, the two men agreed to meet on September 1, the
day after the expiration date of the current collective-bargaining
agreement between the parties.
On September 1, the parties held their scheduled meeting at
the Ritz. The Employer was represented by Johansen and
Michele Grosso, who was at that time the hotel’s general man-
ager. Present for the Union were Tamarin and Karen Kent, the
Union’s vice president. Johansen testified that he brought the
chart describing the items the Hotel wished to discuss that had
been previously provided to him by management. He did not,
however, disclose the chart to the union officials.5 The parties’
meeting lasted a bit more than an hour.
Johansen testified that he began the meeting by pointing out
the long history of positive labor relations between the parties
and their prior ability to “work together to resolve a number of
disputes in the recent past.” (Tr. 78.) He expressed the hope
that they would maintain a “positive relationship . . . going
forward.” (Tr. 78.) In reply, Tamarin agreed that the parties
“had a good relationship and that they were able to work
through some challenging issues in the past.” (Tr. 89.)
As the meeting progressed, Johansen explained that the ho-
tel’s goal was not to reach any agreements about the specific
issues at this initial meeting, but rather “to come to an under-
standing, to essentially agree to a forum to negotiate in the
future, and to not be precluded by the current version of the Me
Too agreement.” (Tr. 79.) Specifically, he told Tamarin and
Kent that “what we needed was an agreement to carve out and
to have the ability of, after the Sheraton contract settled, that
the Ritz would still have the ability to negotiate these issues.”
(Tr. 79.)
In order to provide context regarding the Hotel’s perceived
need to obtain concessions as to the nine established practices,
Johansen next provided the Union with “detailed information
about the financial condition of the Ritz-Carlton at that point.”
(Tr. 80.) After presenting this background, Johansen read
through the list of issues that he had brought with him to the
meeting and “walked through all of the issues.” (Tr. 80.) He
informed Tamarin and Kent that “[o]ur general comment on all
of these items is we’d like to go back to the contract rate or
what the contract required.” (Tr. 86.) In making this assertion
of the hotel’s position, Johansen was referring to the terms of
the anticipated future contract between the Union and the Sher-
aton.
During their discussion, Tamarin questioned whether the ho-
tel was “saying all or nothing, you’re asking for all or noth-
ing?” (Tr. 82.) Johansen testified that he reassured Tamarin
that they were not presenting a fait accompli, but that “these are
issues we need help with, we want to work and reach an agree-
ment and negotiate over these issues so we can close some of
the competitive gaps.” (Tr. 88.) Tamarin stated that the Union
was “willing to bargain over those issues.”6 (Tr. 90.)
5 This has some significance because Posey later mistakenly asserted
that Johansen had provided a copy of the chart to the Union’s repre-
sentatives. (See GC Exh. 7.) To clarify, I asked Johansen to confirm
his testimony on this point and he responded, “They never saw the
document. I did not hand it to them.” (Tr. 142.)
6 To underscore the point, counsel for the General Counsel, referring
to the existence of nine separate topics, asked Johansen whether Tama-
Once the Union had expressed its consent to the procedure
proposed by the hotel to permit separate negotiations over the
nine established practices, the discussion turned to the mechan-
ics of implementing their agreement to negotiate. They dis-
cussed, “the challenge of how to reduce to writing what we
were agreeing to.” (Tr. 90.) In that connection, Tamarin made
two requests. First, he asked the hotel to draft the proposed
agreement, “since we were the ones that had asked for it.” (Tr.
90.) Second, he told Johansen that “he did not want a specific
list of the things in there.” (Tr. 90.) His rationale was the same
that he had expressed to Johansen during their initial discussion
of the problem. He did not want to provide any “roadmap” for
other hotels to make similar demands for concessions. (Tr. 90.)
They then engaged in some discussion about how to draft lan-
guage that would express their intent without providing such a
roadmap. In that conversation, Johansen and Grosso used the
term “unique” to describe the issues that were to be addressed
by the parties outside the confines of the Sheraton agreement.
(Tr. 103.)
The parties left the meeting with the understanding that Jo-
hansen would prepare a draft agreement that would memorial-
ize and preserve the hotel’s right to negotiate changes to the
established practices that had been discussed. Johansen testi-
fied that, overall, it had been a “very cordial, friendly meeting.”
(Tr. 91.)
After the meeting, Johansen prepared a draft of a memoran-
dum of agreement that would reduce the parties’ understanding
to written form. On September 16, 2009, he sent this draft and
a cover letter to Tamarin. In that cover letter, he explained that,
“[a]ttached is the ‘me too’ agreement for the Ritz. It incorpo-
rates the parties’ agreement reached during our September 1
meeting to continue our discussions regarding the issues we
raised with you.”7 (GC Exh. 3, p. 1.) The draft memorandum
began by confirming the parties intention to enter into a new
collective-bargaining agreement by “adopting in its entirety”
the agreement negotiated between the Union and the Sheraton.
(GC Exh. 3, p. 2.)
Paragraph III of the draft contained the heart of the matter
raised by the hotel at the September 1 meeting. It provided:
Specifically, the parties agree to continue their negotiations in
good faith regarding the specific side letters and operations is-
sues unique or pertaining to the Employer that were raised
during the parties’ September 1, 2009 meeting notwithstand-
ing the execution of this Memorandum of Agreement. The
parties further agree to keep open those provisions of the Suc-
cessor Collective Bargaining Agreement that pertain to the
specific unique operational issues raised at the September 1,
2009 meeting until those issues are fully resolved.
(GC Exh. 3, p. 2.)
rin made this statement about “[a]ll of them?” Johansen responded,
“Yes.” (Tr. 90.)
7 Johansen then proceeded to list seven issues. He testified that he
did not include the in-room bar stocking issue or the bell attendant
luggage delivery fee reduction in his list because those matters were
“pretty insignificant.” (Tr. 93.)
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
120
Additional paragraphs of the draft included the parties’ promis-
es to each other that they would not engage in any work stop-
page or lockout. The draft also contained an arbitration clause
and a final paragraph noting that “this Agreement may not be
rescinded or modified by either the Employer or the Union, at
any time or for any reason, except by mutual agreement of the
Employer and the Union.” (GC Exh. 3, p. 3.)
Johansen testified that he had a discussion with Tamarin,
who informed him that he had only one objection to the draft
language. He took strong exception to the sentence that explic-
itly stated that the parties would “keep open” the provisions of
the successor collective-bargaining agreement that related to
the topics that were to be subject to negotiation. (GC Exh. 3, p.
2.) He told Johansen that he opposed this language because it
would prevent the parties from concluding a “final collective
bargaining agreement.” (Tr. 100.) He expressed the strength of
his opposition by asking Johansen a rhetorical question—“are
you [expletive] kidding me with that language?” (Tr. 99.)
Johansen reported that he and his client decided to accom-
modate Tamarin’s rejection of the offending sentence and, with
this deletion, Tamarin told him that, “we’re good to go.” (Tr.
104.) They also agreed that they would begin the process of
negotiations after the Sheraton negotiations “count[ed] down.”
(Tr. 104.)
The final revised version of the memorandum of agreement
(MOA) was signed on behalf of the hotel by Grosso on Sep-
tember 16, 2009. Tamarin signed it for the Union on the next
day. The signed version is contained in the record as Jt. Exh.
2.8 With the signing of the MOA, the parties put matters in
abeyance until the Sheraton negotiations were completed.
Those negotiations took far longer than the parties had ex-
pected.
In the meantime, as of July 2010, Johansen accepted a new
job and Posey took over his duties as labor relations counsel for
the Ritz, including matters related to the MOA. During this
period, Grosso transferred to a new position for the Employer
that is located outside the United States. He was replaced as
general manager by Patrick Ghielmetti.
Posey testified that, although the Sheraton negotiations had
still not been concluded, he decided that it was time to contact
the Union regarding the MOA negotiations. Thus, on the anni-
versary of the signing of the MOA in the preceding year, Posey
sent an email to Kent on the subject of, “Ritz-Carlton Negotia-
tions—Hotel Proposals.” (GC Exh. 4, p. 1.) In the body of this
cover letter, he informed Kent that he was attaching proposals
from the Employer that “all relate to matters that have already
been discussed.” (GC Exh. 4, p. 1.) He noted that the parties
were scheduled to meet on September 24, 2010 and requested
that the Union provide a “written response” to the attached
proposals at that meeting. (GC Exh. 4, p. 1.) The attached
proposals contained detailed language implementing changes to
the established practices regarding each of the nine specific
topics that had been listed on management’s original chart pre-
pared for Johansen’s use.
8 The copy reproduced in the record contains a pencil-marked brack-
et that was not part of the original document. This has been ignored.
Posey testified that he received a telephone call from Kent to
confirm the September 24 negotiating session. Significantly,
he reported that Kent did not indicate any disagreement with
the list of issues that had been sent to her in preparation for the
meeting.
As planned, the parties met at the Ritz on September 24.
The Employer’s representatives were Posey, Ghielmetti, and
Cecilia Moore, the Hotel’s human resource director. Kent
served as the Union’s principal spokesperson and was accom-
panied by a bargaining committee including various Hotel em-
ployees. Posey testified that he began the meeting by referring
to the Hotel’s written proposals that had previously been
emailed to Kent. He reported that he “discussed each of the
proposals and referred back to this list of nine items.” (Tr.
165.) He noted that, during the course of his presentation, Kent
“asked a number of questions and made information requests
regarding each of those proposals.” (Tr. 165.) He also testified
that Kent never offered any indication that the Union objected
to negotiations over any of the nine topics. The parties did not
resolve any substantive issues at the meeting but did agree to a
second meeting on October 21, 2010.
Posey next communicated with Kent by email on October 7,
2010. He began by confirming the date and place of the par-
ties’ next negotiating session. He then made the following
request to Kent:
As we discussed at the last session, please forward us the un-
ion’s initial proposals prior to that date so that we can make
the most productive use of our time on the 21st.
(GC Exh. 5, p. 1.)
Kent replied to Posey’s email on October 11, 2010. Her re-
sponse contained an attachment that she explained was “a writ-
ten request for information that we outlined in our last ses-
sion.”9 (GC Exh. 5, p. 1.) She requested that the information
be provided to her in advance of the October 21 meeting date.
In my view, Kent’s attachment is compelling evidence di-
rectly related to the key substantive issue in this case. As will
be discussed later in this decision, the Union’s position as to the
substance is that the parties never reached an agreement to
negotiate regarding all nine topics that were of interest to the
Employer. Instead, the Union contends that the agreement only
extended to a duty to negotiate over a certain subset of those
nine topics. This argument is gravely undermined by the de-
tailed content of Kent’s email attachment. She begins this letter
by noting that, during the parties’ September 24 meeting, “I
outlined a number of questions that the Union had related to the
Company’s proposal. The following is an outline of the infor-
mation that we requested.” (GC Exh. 5, p. 2.) The remainder
of the attachment consists of the list of detailed questions. It is
divided into nine paragraphs. Each of those paragraphs ad-
dresses topics regarding which the hotel intended to negotiate
with the Union.10
9 On the first page of the copy of this attachment reproduced in the
record there is a hand-written notation reading, “$125.” This was add-
ed later and should be ignored.
10 To be clear, while the hotel had nine topics and the Union divided
its questions into nine topics, the parties adopted different groupings.
The bottom line, however, is that the Union posed detailed questions
UNITE HERE LOCAL 1 (RITZ-CARLTON WATER TOWER )
121
Examining the contents of this detailed information request
reveals that the Union posed 13 questions, divided into 2 sec-
tions, regarding the carving station topic. It posed four ques-
tions about the proposed transfer of the cafeteria cooks. Six
questions were asked about the plan to eliminate the beverage
manager position. Ten questions were addressed regarding the
roll-away bed topic. Five questions were listed regarding the
room credit proposal. Seven questions were posed concerning
the hotel’s desire to eliminate the paid 15-minute break. Kent
asked another four questions about the luggage delivery gratui-
ty. Six more interrogatories were directed toward the in-room
bar service requirement. Finally, eight questions were raised
regarding the hotel’s negotiating proposal concerning compen-
sation for newly hired employees.
The Union has never presented any explanation as to why
Kent felt it necessary to make these detailed information re-
quests as to each and every topic that the hotel asserts was sub-
ject to negotiation under the parties’ MOA. I readily infer that
the reason for the requests was the Union’s belief that it was
required by the MOA to address each of those topics in good
faith bargaining with the Employer.
The parties next met on October 21 as planned. Posey noted
that the Employer had already provided certain information that
had been requested and then proceeded to provide, “a little bit
more of that information at the start of the meeting.” (Tr. 172.)
In addition, he observed that, “we had not received any written
responses to our September 24th proposals yet.” (Tr. 172.) At
this juncture, the Union requested a break which lasted approx-
imately 40 minutes.
When the session resumed, Kent informed Posey that, “it
was the Union’s position that there were not nine items on the
table to be bargained over and it was, in fact, less than that.”
(Tr. 172.) Posey testified that, “[a]t that time, [Kent] said five
items but, as she got into more detail and explained which
items the Union would and would not bargain over, I actually
only counted three.” (Tr. 172.)
In his testimony, Posey reported that Kent provided the Un-
ion’s rationale for its refusal to continue negotiations over all
nine topics. Kent explained that paragraph III of the MOA
provided that, “it was only issues that were unique or pertaining
to the Ritz and, that a number of the proposals did not fall un-
der that category.” (Tr. 173.) She did offer to continue to ne-
gotiate over the beverage manager position, the cafeteria cook
transfer, and the quota for in-room bar servicing. Finally, she
stated that, “although she didn’t believe they were obligated to,
that they may consider also discussing one part of the carving
station issue, specifically the carving station scheduling.” (Tr.
174.) Lastly, Kent raised a tenth topic, cross-training for the
hotel’s cooks. The Union also presented written proposals to
the hotel regarding the cafeteria cook reassignment and its own
newly raised cross-training proposal. On hearing the Union’s
position, Posey stated that, “we strongly disagreed,” asserting
that “you’ve already agreed that we [are] going to negotiate”
over all of the nine topics. (Tr. 175.)
about each and every topic that the hotel was raising in the negotiations
under the parties’ MOA.
On November 3, 2010, Posey sent a letter to Kent containing
a formal statement of the Hotel’s position regarding the Un-
ion’s refusal to negotiate over all nine topics. He asserted that,
“there is no basis for the Union’s argument that only some, but
not all, of the issues that were raised during the parties’ Sep-
tember 1, 2009 meeting are subject to the Memorandum.” (GC
Exh. 7, p. 2.)
The parties next met on November 11, 2010. Shortly before
the time set for the meeting, Kent sent an email response to
Posey.11 She reported that the Union was working on its pro-
posals and would provide them to the hotel by the start of the
meeting. She added, “[r]egarding our ‘Me Too’ agreement, it is
clear that we have a disagreement. Hopefully that will not
stand in way of us amicably resolving our differences.” (GC
Exh. 8.)
At their meeting later on this day, Posey told the union nego-
tiators that, based on Kent’s email, the hotel “looked forward to
receiving the Union’s proposals regarding each of the nine
items.” (Tr. 194.) Kent explained that Posey had misunder-
stood the meaning of Kent’s email and that the Union would
not be making proposals as to all nine topics. The majority of
the subsequent discussions related solely to the in-room bar
stocking issue.
On November 23, 2010, Kent sent a letter to Posey that she
characterized as the Union’s “formal” response to the hotel’s
contention that the MOA required the parties to engage in ne-
gotiations regarding all nine topics that were of interest to the
Employer. (GC Exh. 9, p. 1.) She explained that the Union’s
view was that only a subset of the nine topics was subject to a
bargaining requirement under the language of the MOA. Re-
ferring to the MOA’s reference to the parties’ commitment to
bargain over “specific side letters and operations issues unique
or pertaining to the Employer that were raised during the par-
ties’ September 1, 2009 meeting,” she asserted that this phra-
seology was intended as an agreement to limit bargaining to
only a subset of management’s nine topics of interest.
According to Kent’s proposed interpretation, the term
“unique” meant “things that are only true at Ritz-Carlton and
not elsewhere,” while the term “pertaining” signified “a matter
that is not a standard item throughout the industry but is some-
thing that specifically, although not uniquely, pertains to Ritz-
Carlton.” (GC Exh. 9, p. 2.) Thus, she concluded that this
language from the MOA constituted “a limiting qualification:
that this promise [to bargain] extended only to those of the nine
issues that are ‘unique or pertaining to the Employer.’” (GC
Exh. 9, p. 2.)
On December 8, 2010, the parties held their next meeting.
The discussion was largely confined to an exploration of the in-
room bar issue. Similarly, at the following meeting on Decem-
ber 22, the topics were limited to the same in-room bar issue
and the Union’s proposal regarding cross-training of cooks.
The Union took the occasion to present a written proposal re-
garding its cross-training plan.
11 Kent’s email makes reference to Posey’s letter of October 3, 2010.
The parties all agree that this was an error and that Kent was referring
to Posey’s letter sent on November 3, 2010.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
122
Posey testified that, during 2011, the parties have held 4 or 5
additional bargaining sessions. These involved negotiations
over the three topics that the Union asserted as the entirety of
the topics it was required to discuss under the MOA. In addi-
tion, the parties continued to discuss the Union’s cross-training
issue.12 Posey summarized the course of these discussions as
follows:
[I]n general, at those sessions, I’ve reiterated the hotel’s posi-
tion that the other six items or six-and-a-half, depending on
how you count them, should also be on the table and the Un-
ion has responded that they’re not.
(Tr. 206.) He added that Kent, “maintained the consistent posi-
tion that those items are off the table.” (Tr. 208.) The parties
reached a tentative agreement as to the transfer of the cafeteria
cooks but have not been able to agree on any other item.
On January 7, 2011, the hotel filed its initial charge in this
matter, alleging that the Union had violated the MOA by refus-
ing to bargain over issues that were subject to bargaining under
the terms of that agreement. (GC Exh. 1(a).) On April 12,
2011, the Union and the Sheraton successfully concluded their
lengthy negotiations for a new collective-bargaining agreement.
As of the time of trial, Posey outlined the status of the contrac-
tual relationship between the Ritz-Carlton and the Union in his
testimony:
[T]he full or formal agreement [between the Union and the
Sheraton] has yet to be prepared . . . . At the moment, there’s
a summary of the terms of the new agreement that’s been
drafted and signed by the Sheraton’s attorney, which is my-
self, and the Union’s representative, Henry Tamarin. I don’t
believe that summary has been formally presented to the Ritz
yet. So, until the time that’s presented, the Ritz is not bound
by those new terms. Although, as a practical matter, I believe
they may be following those right now, anyway.
(Tr. 149.) Later in his testimony, Posey reported that he had
spoken with the Ritz’s human resources director and her assis-
tant and they confirmed that the Ritz had not yet received the
new collective-bargaining agreement.
The Regional Director issued his complaint and notice of
hearing on March 25, 2011. The parties confirm that through-
out this matter the Union has continued its refusal to bargain
over all of the nine topics that the Employer contends are man-
dated for such bargaining by the parties’ MOA.
B. Legal Analysis
I have already indicated that resolution of this case requires
assessment of both a substantive legal dispute and a procedural
defense raised by the Union. Ordinarily, one would expect that
the procedural matter should be resolved first. However, on the
particular circumstances presented in this case, I have conclud-
ed that the proper methodology requires a dissection of the
substantive issue before the procedural defense can be fully
addressed. In order to explain this conclusion, it is necessary to
outline some of the history of this litigation.
12 Posey reported that, ultimately, the hotel rejected the cross-
training plan.
It will be recalled that the complaint issued on March 25,
2011. The Union filed its answer on April 4. In that answer, it
contended that, “[t]he unfair labor practice alleged in the Com-
plaint should be deferred to arbitration pursuant to Collyer In-
sulated Wire, 192 NLRB 837 (1971).” (GC Exh. 1(e), p. 3.)
Quite properly, the Union followed up this assertion by filing a
motion for summary judgment on the deferral issue. (GC Exh.
11.) Both the General Counsel and the hotel filed oppositions
to the motion. (GC Exhs. 1(i) and (l).) On July 29, 2011, the
Board issued an order denying the Union’s motion for summary
judgment in the following terms:
The Respondent has failed to establish that there are no genu-
ine issues of material fact regarding its argument that the
complaint allegations should be deferred to the parties’ griev-
ance and arbitration procedure pursuant to Collyer Insulated
Wire, 192 NLRB 837 (1971). This denial is without prejudice
to the Respondent renewing its deferral argument before the
administrative law judge.
(GC Exh. 1(q).)
At trial, the Union did continue to assert its deferral defense.
As its counsel explained, “our position is this is a Collyer, real-
ly should be Collyerized and we feel very strongly about that.”
(Tr. 236.)
I have given particular attention to the wording of the
Board’s Order denying the summary judgment motion without
prejudice. I conclude that the Board’s language, cited above,
mandates that the ultimate resolution of the deferral issue must
proceed from a comprehensive assessment of the “material
fact[s]” as developed through the trial process. (GC Exh. 1(q).)
Otherwise, there would be no point in the Board’s specific au-
thorization for the Union to renew the argument before me. In
light of the Board’s position, I will therefore begin by assessing
the facts underlying the parties’ dispute and the legal conclu-
sions that flow from those facts. Having performed this analy-
sis, I will next turn to the procedural argument and determine
whether the Board’s deferral policies are properly applied to
this dispute.
1. The alleged bargaining violation by the Union
In Section 8(b)(3) of the Act, Congress made it an unfair la-
bor practice for a union representing employees in a bargaining
unit to “refuse to bargain collectively” with their employer.
The General Counsel alleges that, by failing to bargain over all
of the nine issues that the hotel viewed as encompassed in the
parties’ MOA, the Union has violated this statutory require-
ment.
In response, the Union has stated as its “formal” position that
the parties’ MOA merely required it to bargain over a “subset”
of the nine issues of concern to the Employer, namely those
issues “unique or pertaining to the Employer.” (GC Exh. 9, pp.
1–2.) It has chosen to define those issues as being limited to
the hotel’s proposed reassignment of the two cafeteria cooks,
the work quota for the servicing of in-room bars, and the elimi-
nation of the beverage manager position.13 As a result, it has
13 Kent also told the hotel’s negotiators that, although not obligated
to bargain about the topic under the MOA, the Union “may consider
also discussing . . . the carving station scheduling.” (Tr. 174.) Howev-
UNITE HERE LOCAL 1 (RITZ-CARLTON WATER TOWER )
123
refused to engage in bargaining over the fee for work on spe-
cialty stations, reduction of the gratuity paid to bell attendants
for delivering luggage to vacant rooms, elimination of the paid
15-minute break for housekeepers, reduction of the payment for
making up roll-away and sofa beds, lowering of the room credit
reduction for check-out rooms, and payment of the contract rate
for all new employees.
In determining whether the Union’s conduct violates the Act
as alleged, I will first outline the evidence regarding the parties’
decision to enter into the MOA. It will be recalled that the
hotel’s management presented its lawyer with a chart detailing
the nine topics that it wished to reserve for bargaining with the
Union. The lawyer was instructed to seek an understanding
with the Union that the hotel would sign a “me too” commit-
ment binding it to the eventual terms of the Sheraton collective-
bargaining agreement in exchange for the Union’s promise to
bargain over this list of nine issues.
Following his client’s instructions, Johansen met with union
officials on September 1, 2009. He presented uncontroverted
and credible testimony that, during this meeting, he “walked
through all of the issues” listed by his client on the chart. (Tr.
80.) Union President Tamarin expressed the Union’s agree-
ment to bargain over these items in return for the hotel’s com-
mitment to follow the “me too” process. Under examination by
counsel, Johansen clearly affirmed that the agreement to bar-
gain covered, “[a]ll of them.” (Tr. 90.) [Counsel’s choice of
wording.] The parties also agreed that counsel for the hotel
would draft the MOA and that, at the request of the Union, it
would not include a “specific list of the things in there.” (Tr.
90.)
After this meeting, Johansen proceeded to prepare a draft
MOA. Tamarin limited his comments to one sentence which he
found unacceptable. When the hotel withdrew this sentence,
Tamarin advised Johansen that they were “good to go.” (Tr.
104.) The parties then proceeded to execute the MOA. After
this, matters remained in limbo for approximately a year while
the Sheraton negotiations dragged on. In September 2010,
Posey replaced Johansen as the hotel’s counsel. On September
16, he sent an email to Kent containing the hotel’s specific
proposals regarding the nine issues of concern to the Employer.
(GC Exh. 4.) Posey provided credible and undisputed testimo-
ny that Kent responded by telephone. During their conversa-
tion, she confirmed the date for upcoming negotiations and did
not express any reservations regarding the topics to be dis-
cussed.
The parties held their first bargaining session under the
MOA on September 24, 2010. Posey testified, without contra-
diction, that he “discussed each of the proposals and referred
back to this list of nine items.” (Tr. 165.) He reported that,
“Ms. Kent asked a number of questions and made information
requests regarding each of those proposals.” (Tr. 165.) On
October 11, Kent followed up her information requests with a
detailed and highly specific list of questions regarding each of
the hotel’s nine items. (GC Exh. 5.) Not until the parties were
assembled for the next bargaining session on October 21 did
er, she specifically rejected any bargaining about the carving station
fees.
the Union express any limitation on the topics that it was pre-
pared to discuss. At that session, Kent took the position that
the Union’s agreement in the MOA only required bargaining
over three of the nine topics. Since that time, the Union has
maintained its insistence that the parties’ MOA requires bar-
gaining only as to those topics.
I conclude that the clear and undisputed evidence demon-
strates that both parties entered into the MOA for valuable con-
sideration. The hotel sought and obtained a mechanism for
seeking concessions about nine issues involving established
past practices that were more favorable to its employees than
the terms of the Sheraton collective-bargaining agreement. The
Union sought and obtained the hotel’s agreement to follow the
“me too” format for the parties’ successor collective-bargaining
agreement, something that Tamarin had raised as an important
objective during his first conversation about the issue with Jo-
hansen in July 2009.14
The private parties both agree that the MOA is a valid and
enforceable contract between them. At trial, I confirmed this
point by asking the lawyers for the Employer and Union
whether, “everyone agrees there’s a contract here.” (Tr. 13.)
Both expressed assent to this proposition.15 They have a dis-
pute regarding the scope of their contract and the resolution of
that dispute is vital to the adjudication of the unfair labor prac-
tice alleged in this case. The Board has noted that its authority
to engage in interpretation of contractual agreements in the
course of adjudicating unfair labor practices is “well settled.”
Electrical Workers Local 11 (Los Angeles NECA), 270 NLRB
424, 425 (1984), enfd. 772 F.2d 571 (9th Cir. 1985).
I will now turn to the task of interpreting the parties’ MOA.
The Board requires that this process be “fact specific.” Shaw’s
Supermarkets, 343 NLRB 963, 963 (2004). The key analytical
principles have been outlined by the Board as follows:
In contract interpretation matters like this, the parties’ actual
intent underlying the contractual language in question is al-
ways paramount, and is given controlling weight. To deter-
mine the parties’ intent, the Board normally looks to both the
contract language itself and relevant extrinsic evidence, such
as a past practice of the parties in regard to the effectuation or
14 The MOA also contained another important set of mutual promis-
es representing valuable consideration for each side. Par. V of the
MOA provides for “mutual promises between the Union and the Em-
ployer” that they will refrain from engaging in any strike or lockout
against each other following the expiration of their current collective-
bargaining agreement.
15 Counsel for the General Counsel did voice some concern that
there may have been an issue of “contract formation.” (Tr. 26.) In my
view, this was a shortsighted tactical argument that represented an
effort to counter the Union’s insistence that the matter be deferred to
arbitration. As I stated to counsel for the General Counsel, “what
you’re saying . . . is you can’t defer this to arbitration because there
wasn’t a contract, therefore, we’re going to have a trial. At that trial,
you’re going to insist that there was a contract and that [the Union]
broke it.” (Tr. 30.) Having now had the opportunity to review the
entire record, I readily conclude that the private parties are correct in
agreeing that they did enter into a valid and binding contract. The only
matter in dispute is the extent of the bargaining obligation they under-
took in that contract.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
124
implementation of the contract provision in question, or the
bargaining history of the provision itself.
Mining Specialists, 314 NLRB 268, 268–269 (1994).
Turning first to the language of the MOA, the parties agree
that the critical provision in dispute is par. III, which contains
the following key sentence:
Specifically, the parties agree to continue their negotiations in
good faith regarding the specific side letters and operations is-
sues unique or pertaining to the Employer that were raised
during the parties’ September 1, 2009 meeting notwithstand-
ing the execution of this Memorandum of Agreement.
(Jt. Exh. 2, p. 1.) It is obvious to the parties and to me that this
language is ambiguous on its face, particularly since it refer-
ences “issues . . . that were raised during the parties’ September
1, 2009 meeting” without providing a list of such issues.
While the Board does not permit the introduction of extrinsic
evidence to contradict a contract’s unambiguous terms, it does
allow consideration of such parole evidence to facilitate analy-
sis in circumstances where “an ambiguity arises, or the intent or
object of the instrument cannot be ascertained from the lan-
guage employed therein.”16 Sansla, Inc., 323 NLRB 107, 109
(1997), citing 30 Am. Jr. 2d, Section 1069 (1967). See also
Don Lee Distributor, Inc., 322 NLRB 470, 484–485 (1996),
enf. 145 F.3d 834 (6th Cir. 1998), cert. denied 525 U.S. 1102
(1999).
The parole evidence in this case, consisting of the credible
and uncontroverted testimony and the documentary evidence
including the Union’s detailed information request regarding all
nine of the hotel’s topics, clearly demonstrates that the issues
raised during the parties September 1, 2009 meeting and in-
tended for inclusion in the MOA were the nine matters that I
have previously listed at page 3 of this decision. The MOA
commits the parties to negotiate about each of those items.
In reaching this conclusion, I have considered the Union’s
argument to the contrary. That argument centers on the parties’
use of certain descriptive language regarding the issues that
were raised at the September 1, 2009 meeting. Thus, the MOA
provides that those issues consist of “specific side letters and
operations issues unique or pertaining to the Employer.” (Jt.
Exh. 2, p. 1.) The Union argues that these descriptive words
represent a limitation on the scope of its agreement to negotiate
about the issues raised at the September 1 meeting.17
In the first place, the Union contends that, in context, the
word “unique” means that the issues to be negotiated must
16 In this case, it is particularly appropriate to consider parole evi-
dence. It will be recalled that the MOA’s ambiguity was created at the
specific demand of the Union. Tamarin had insisted that the agreement
omit a precise list of the topics to be negotiated because he did not want
to provide a “roadmap” for other hotel managers to use in an effort to
seek concessions from the Union. (Tr. 90.) Having demanded the use
of elliptical language in the MOA, the Union cannot (and does not)
complain about the use of extrinsic evidence to shed light on the par-
ties’ intent.
17 It is interesting to note that Kent’s formal statement of the Union’s
position concedes one key matter of fact. In her statement she
acknowledges that the parties did discuss “all nine of the items” during
the September 1, 2009 meeting. (GC Exh. 9, p. 2.)
represent “things that are only true at Ritz-Carlton and not
elsewhere.” (GC Exh. 9, p. 2.) Second, the Union asserts that
the word “pertaining” means “a matter that is not a standard
item throughout the industry but is something that specifically,
although not uniquely, pertains to the Ritz-Carlton.” (GC Exh.
9, p. 2.) In some undefined process of alchemy, it concludes
that application of these definitions to the nine items of concern
to the hotel results in a requirement that the parties’ negotiate
about three, but need not discuss the remaining six. Thus, for
example, they must discuss the number of in-room bars that
employees are required to service per shift but need not address
the number of rooms the housekeepers must make up during a
shift. I cannot discern any substantive difference between these
topics and the Union has not provided any explanation for the
proposed distinction.
It is evident from the totality of circumstances that the use of
the terms “unique” and “pertaining” was simply to express the
concept that these matters have been subject to an established
practice that differs from the requirements of the parties’ col-
lective-bargaining agreement. The Union’s strained effort to
interpret them as something else founders on the rock repre-
sented by the parties use of a tiny but important additional dis-
junctive term, “or.” The use of this term vitiates any limitation
that may conceivably derive from the word “unique.” In order
to be covered by the MOA, a practice that was discussed at the
September 1 meeting need not be unique. It need only be a
matter that pertains to the Ritz-Carlton, so long as it was dis-
cussed at the key September 1 meeting.
Lastly, in presenting the Union’s rationale for its refusal to
bargain about the majority of the nine topics, Kent argued that
the Employer’s position that all nine of the items raised at the
September 1, 2009 meeting were subject to a bargaining obliga-
tion, “deprives much of Paragraph III of any meaning, in viola-
tion of one of the most important rules of contract construc-
tion.” (GC Exh. 9, p. 2.) This is inaccurate because it fails to
acknowledge Johansen’s actual reason for using the words
“unique or pertaining to the Employer.” (Jt. Exh. 2, p. 1.)
In reality, Johansen chose those words to express the concept
that the nine items that would be subject to the parties’ negotia-
tions under their MOA all involved matters on which the past
practice of the Employer and the Union had been different from
(and more favorable to the Union than) the terms of the “me
too” collective-bargaining agreement then in effect and any
anticipated successor “me too” agreement. Thus, the nature of
the topics was hardly unique. These were topics common in
the hospitality industry such as the quantity of work performed
by housekeepers and the amount of gratuities owed to bell at-
tendants. What was unique and pertained only to the Ritz were
the particular established practices that were in effect regarding
each of the topics.18 For this reason, I reject the Union’s
strained effort to suggest that Johansen’s contract language was
a limitation on the number of items subject to negotiation, as
opposed to an attempt to explain why each of those items was
18 Thus, as Johansen testified, his choice of language meant, “differ-
ent, paying above scale and a level above scale, any number of things
that were beyond the [Sheraton] contract. And we were only talking
about the Ritz.” (Tr. 103.)
UNITE HERE LOCAL 1 (RITZ-CARLTON WATER TOWER )
125
appropriately subject to such negotiation despite the parties’
adherence to the “me too” arrangement for their successor col-
lective-bargaining agreement.19
It is beyond question that each of the nine topics of concern
to management does “pertain” to the Ritz-Carlton. Further-
more, each of those topics was specifically raised during the
parties’ September 1, 2009 meeting. In consequence, the MOA
commits the parties to negotiate about each of those nine items.
The Union’s attempt to pick and choose among the nine
items and negotiate about only those that it arbitrarily selects
represents a fundamental repudiation of the MOA. This is fur-
ther illustrated by examination of the Union’s overall behavior
in its negotiations with the Employer. It has taken four posi-
tions regarding the subject matter of those negotiations. First,
the Union has agreed that it is required by the MOA to bargain
over reassignment of the cafeteria cooks, servicing of in-room
bars, and elimination of the beverage manager position. Se-
cond, it has flatly refused to bargain over the carving station
fees, gratuity for bell attendants, elimination of the housekeep-
ers’ paid break, fees for making up roll-away or sofa beds,
room credits for check-out rooms, and compensation of new
employees. Third, it has agreed to bargain over scheduling
procedures for carving station work, but has specified that this
is a voluntary decision that is not compelled by the parties’
MOA. Fourth, it has raised an entirely new issue to be subject
to bargaining outside the confines of the “me too” agreement.
That issue is its proposal for cross training of cooks.20 Viewed
in the entirety, this course of conduct leads to the conclusion
that the Union has placed no reliance on any obligation to bar-
gain created under the MOA. Instead, it has chosen to proceed
as if that MOA did not impose any obligations on it. Essential-
ly, in the Union’s view, the MOA has ceased to exist. In its
eyes, bargaining between the parties is entirely an ad hoc mat-
ter, free of any contractual limitations or obligations.
The Union’s acts and statements go beyond the confines of a
contract dispute or minor breach of the contract. They consti-
tute a repudiation of the MOA. As Comment 2(b) to the Re-
statement of Contracts 2d, § 250 notes, “language that under a
fair reading amounts to a statement of intention not to perform
except on conditions which go beyond the contract constitutes a
repudiation.”21 [Internal punctuation omitted.] Such conduct
19 Indeed, it is a bit ironic that the evidence leads me to the strong in-
ference that Johansen actually included the “unique or pertaining”
language to reassure the hotel’s employees and the Union that the hotel
was precluded under the MOA from seeking concessions that were less
favorable than the working conditions specified in the parties’ collec-
tive-bargaining agreement or its eventual successor.
20 In his brief, counsel for the hotel correctly notes that during the
trial I wondered aloud about the rationale for the Union’s cross training
proposal. (CP Br., at fn. 2.) At that time, I speculated that it may have
borne some relationship to the cafeteria cooks’ transfer issue. Posey
responded with uncontroverted testimony that established that the Un-
ion stated that the purpose was to give all 25 to 30 of the hotel’s cooks
“maximum opportunities for advancement and increase of their earn-
ings.” (Tr. 210.) There was no evidence presented to indicate that the
Union saw this proposal as related to any of the nine topics covered by
the MOA.
21 The Restatement cites § 2-610 of the Uniform Commercial Code
and its official comments. Those comments note that repudiation con-
violates Section 8(b)(3) of the Act. See Electrical Workers
Local 3 (Burroughs Corp.), 281 NLRB 1099 fn. 2 (1986) (un-
ion’s repudiation of existing contract violates Sec. 8(b)(3)).
2. The Union’s deferral argument
As part of their MOA, the parties in this case provided that,
“[t]he provisions of this Agreement shall be enforceable in
accordance with the procedures set forth in Section 46 of the
Current Collective Bargaining Agreement between the Em-
ployer and the Union.” (MOA, par. VI, Jt. Exh. 2, p. 2.) Citing
this language, the Union has throughout this litigation rested
the bulk of its defense on the argument that the Board’s policies
require that the controversy be deferred to the arbitral process.
As I have already indicated, in its pretrial order denying sum-
mary judgment, the Board rejected this argument but authorized
the Union to raise it again before me.22
The Board’s leading case on deferral of unfair labor practice
charges and complaints to arbitration is, of course, Collyer
Insulated Wire, 192 NLRB 837 (1971). As the Board ex-
plained:
[E]ach such case compels an accommodation between, on the
one hand, the statutory policy favoring the fullest use of col-
lective bargaining and the arbitral process and, on the other,
the statutory policy reflected by Congress’ grant to the Board
of exclusive jurisdiction to prevent unfair labor practices.
192 NLRB at 841.
Very recently, the Board reiterated the following list of its
criteria used to assess the competing policy interests and arrive
at a decision:
The Board considers six factors in deciding whether to defer a
dispute to arbitration: (1) whether the dispute arose within the
sists of statements or actions that constitute “a demonstration of a clear
determination not to perform.” Comment 5. The evidence as to the
Union’s behavior in this case certainly falls within that description.
22 In denying the summary judgment motion, the Board held that the
Union “has failed to establish that there are no genuine issues of mate-
rial fact” related to the deferral argument. (GC Exh. 1(q).) As a result,
I have waited until the development of the full trial record before final-
ly addressing the deferral defense. However, I do recognize that this
methodology, while consistent with the Board’s Order in this case, is in
tension with the Board’s directive in Servomation Corp., 271 NLRB
1112 fn. 7 (1984), where it held that, “[t]he maintenance of a meaning-
ful and effective deferral policy . . . requires that the initial deferral
decision under Collyer be made on the basis of the complaint, the Re-
spondent’s defense, and the applicable contract provisions. Thus, it
serves few, if any, of Collyer’s stated objectives to make a decision
regarding deferral that is based on evidence and legal theories that are
outside the specifically pleaded complaint allegations. In short, the
Board and its judges ought not to first decide the case and then deter-
mine whether deferral is appropriate.” I can only concur with the ob-
servations of a colleague who noted that application of Collyer “is often
a challenging task, however, because of the variety of pronouncements
by the Board on the subject and the uniqueness of each new case in
which deferral contentions are raised.” Live Oak Skilled Care & Manor
Hosp., 300 NLRB 1040, 1044 (1990). On balance, I believe that the
procedure I have adopted in the circumstances of this case has permit-
ted a full and fair examination of the deferral issue consistent with the
Board’s intentions as expressed in its pretrial Order and without the
imposition of an undue burden on the parties.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
126
confines of a long and productive collective-bargaining rela-
tionship; (2) whether there is a claim of employer animosity
to the employees’ exercise of protected rights; (3) whether the
agreement provides for arbitration in a very broad range of
disputes; (4) whether the arbitration clause clearly encom-
passes the dispute at issue; (5) whether the employer asserts
its willingness to resort to arbitration for the dispute; and (6)
whether the dispute is eminently well-suited to resolution by
arbitration. [Citations and internal punctuation omitted.]
San Juan Bautista Medical Center, 356 NLRB 736, 737 (2011).
In that case, the respondent was an employer. Here, the Re-
spondent is a labor organization. As a result, the criteria must
be adapted to address the Union’s behavior and willingness to
arbitrate.
Applying this test, I note first that there is ample evidence in
the record to establish that these parties have enjoyed a lengthy
and, usually, productive collective-bargaining relationship. In
their discussions with each other, they have often made refer-
ence to this history. While I certainly suspect that the events
involved in this case have placed a strain on their relationship, I
still conclude that the first criterion for deferral is met.
It is not entirely clear to me how the Board would apply the
second criterion in these circumstances involving a union as the
respondent seeking deferral to arbitration. Clearly there is
nothing about this case that suggests that the Union is hostile to
“employees’ exercise of protected rights.” Supra at 737. On
the other hand, if one takes a broader view of what is intended
by this criterion, there is evidence to suggest that the Union is
hostile to the principles of collective bargaining that are an
equally important component of the policies underlying the
Act. I do not view this as decisive because there is no evidence
in the record to indicate that the Union’s conduct in this case is
part of a pattern of recidivist violations of the Act. Thus, appli-
cation of the second criterion to this case does not preclude
deferral.
I will examine the next two criteria together as they are
closely related in the circumstances of this case. The parties’
arbitration clause appears on its face to provide broad coverage
for any dispute involving, “[t]he provisions of this Agreement.”
(Jt. Exh. 2, p. 2.) The more difficult question is whether the
clause encompasses the dispute at issue. Both the General
Counsel and the hotel argue that the clause does not encompass
the dispute at issue since they contend that the Employer “does
not have access to the contractual grievance procedure.” (CP
Br., at p. 18. See also GC Br., at p. 13 (“the grievance proce-
dure is not available” to the Employer).)
The basis for the contention that the hotel cannot avail itself
of the MOA’s arbitration clause is the fact that the clause in-
corporates a reference to Section 46 of the parties’ collective-
bargaining agreement. That lengthy provision sets forth a de-
tailed procedure for “Adjustment of Grievances.” The proce-
dure culminates in arbitration as a last step. Naturally, this
procedure anticipates that such grievances would only be filed
by employees or their union representative. Therefore, the
Employer and General Counsel argue that the arbitration pro-
cess is only available to the Union or an employee who has
proceeded through the prior steps of the grievance process.
Because the Employer cannot file a grievance, it is asserted that
it cannot avail itself of arbitration of disputes arising under
either the collective-bargaining agreement or the MOA.
I conclude that this line of reasoning is mistaken, both be-
cause of the specific language in the MOA and the existence of
other language in the collective-bargaining agreement that has
not been cited by the parties. Turning first to the collective-
bargaining agreement, in addition to their grievance procedures,
the parties have established an arbitration process for another
class of potential disputes. Section 6 of their contract covers
issues related to subcontracting. It requires negotiations before
any subcontracting of work by the hotel. It goes on to direct
that:
In the event such negotiations fail to produce an agreement,
either party may invoke the arbitration provisions set forth in
Sections 45 and 46 of this Agreement. [Italics supplied.]
(CBA, sec. 6, Jt. Exh. 1, p. 5.) Obviously, this language dis-
poses of the claim that the Employer lacks any right of access
to arbitration under the terms of the parties’ collective-
bargaining agreement. Beyond that, it demonstrates that the
placement of the arbitration provisions in the contract section
governing grievances is merely a matter of convenience and
does not carry any substantive implications.
These conclusions are only reinforced when the language of
the MOA’s arbitration clause is examined closely. That clause
does not say that arbitration of disputes under the MOA shall be
performed under the terms of Section 46 of the collective-
bargaining agreement. Instead, it clearly provides that such
arbitration shall be performed “in accordance with the proce-
dures set forth in Section 46.” (Jt. Exh. 2, p. 2.) [Italics sup-
plied.] Thus, as with arbitration of subcontracting disputes, the
intent of the MOA’s arbitration clause was to utilize the proce-
dural mechanisms of Section 46. These mechanisms describe
the list of potential arbitrators, allocate the costs of arbitration,
provide timeframes for the process, and delineate other im-
portant procedural details. The MOA’s reference to Section 46
simply creates a shorthand method of fleshing out the details of
the arbitration process for disputes arising under the MOA. I
readily conclude that there is no impediment to the Employer’s
use of arbitration that would preclude deferral in this case.
The next issue is whether the Union has asserted a willing-
ness to subject the dispute to arbitration. Through its counsel, it
has repeatedly expressed its desire to do so. Indeed, counsel
added that, “we would very much respect that process because
our whole collective bargaining relationship depends on it.”
(Tr. 21.) There is nothing in the record to cast doubt on these
representations. I do not find that this factor precludes deferral.
Having determined that none of the first five criteria support
a refusal to defer this case to an arbitrator, I must assess the
final evaluative standard: whether the parties’ dispute is emi-
nently well suited to resolution by arbitration. In articulating
the proper considerations regarding suitability, the Board has
outlined two particular factors that persuade me that deferral is
inappropriate in this case.
First, in Collyer, the Board placed great reliance on an ar-
ticulation of policy from a prior case, Jos. Schlitz Brewing Co.,
UNITE HERE LOCAL 1 (RITZ-CARLTON WATER TOWER )
127
175 NLRB 141, 142 (1969), where the Board outlined the
proper use of deferral follows:
[W]here, as here, the contract clearly provides for grievance
and arbitration machinery, where the unilateral action is not
designed to undermine the union and is not patently erroneous
but rather is based on a substantial claim of contractual privi-
lege, and it appears that the arbitral interpretation of the con-
tract will resolve both the unfair labor practice and the con-
tract interpretation issue in a manner compatible with the pur-
poses of the Act, then the Board should defer to the arbitration
clause conceived by the parties.
Among the key analytical tests outlined in this language is the
requirement that the respondent’s position on the merits is “not
patently erroneous but rather is based on a substantial claim of
contractual privilege.” Supra at 142.
Webster defines “patency” as the “state of being obvious.”
Webster’s II New Riverside University Dictionary, 1994 edi-
tion, at p. 861. I have previously discussed my conclusions
regarding the erroneous nature of the Union’s position in this
litigation based on my review of the entire record of these pro-
ceedings. However, in order to demonstrate the obvious nature
of the Union’s error, I will simply refer to three documents that
convincingly demonstrate that the Union’s position is patently
wrong.
First, the parties’ MOA itself does not give any support to
the notion that the parties agreed to bargain over only a subset
of the issues that they discussed in their September 1, 2009
meeting. It would be ludicrous to suggest that they would enter
into such a bizarrely indeterminate undertaking. Second, lest
there be any doubt that the topics for bargaining were the nine
topics of interest to the hotel, Kent’s formal statement of posi-
tion concedes the issue. In that document she affirms that there
were, indeed, 9 items raised at the September 1 meeting. (See
GC Exh. 9, p. 2, par. 2.) Finally, any lingering concern that the
Union may have in some manner misunderstood that it had
agreed to bargain over nine items is eliminated by reference to
the extensive written list of information requests that demanded
answers to detailed questions about each and every one of those
nine topics. (GC Exh. 9, pp. 2–5.) This contemporaneous doc-
umentary evidence convincingly demonstrates that the parties
agreed to bargain over nine issues and the Union recognized its
obligation to engage in such bargaining as to those nine issues
by taking steps to become fully informed about each of them.
The Union’s belated claim that the parties actually only agreed
to negotiate about some undefined portion of the nine issues is
simply a makeweight argument designed to deflect its liability
for refusing to meet its contractual and statutory obligations.
In Borden, Inc., 196 NLRB 1170 (1972), the Board expressly
adopted the judge’s refusal to defer the case to arbitration
where the employer’s position on the merits was patently erro-
neous. In reaching this conclusion, the judge contrasted the
situation with the issue presented in Collyer. He noted that the
dispute in Collyer involved “an intricate, technical kind of issue
involving an interpretation of contract language covering prob-
lems peculiar to the employer involved.” 196 NLRB at 1175.
In contrast, in Borden, the issue was whether the parties “have
fallen short in their obligations to bargain collectively.” 196
NLRB at 1175. As the judge explained, this type of issue was
poorly suited to arbitration and one that was “of a kind that the
Board is especially well equipped to handle.” 196 NLRB at
1175.
In my view, the same factors are at work here. An experi-
enced arbitrator selected from the parties’ established panel
may well be ideally suited to resolve such disputes as when to
apply a room check-out credit or what circumstances should
give rise to an obligation to provide a fee to a bell attendant in
lieu of a gratuity. By contrast, an arbitrator’s experience and
expertise in the hospitality industry adds nothing to the task of
addressing the consequences of the Union’s utter refusal to
negotiate about the majority of the issues covered by the par-
ties’ MOA.23 As another judge has noted in a deferral decision
involving “a complete breakdown in contract renewal negotia-
tions, rather than a routine contract violation,” the Board’s
“statutory remedies available to treat with such issues are far
more comprehensive than those available in arbitration.” AMF,
Inc., 219 NLRB 903, 912 (1975). That judge’s analysis was
also adopted by the Board. I believe that these considerations
apply with equal force to the conduct of the Union in the case
before me. As a result, the issue presented is not well-suited to
arbitration.
In what is perhaps, under the facts of this case, another way
of saying the same thing, I conclude that the Board’s precedents
regarding deferral in the context of contract repudiation also
demonstrate that the matter is not suitable for arbitration. Thus,
the Board holds that where a party’s course of conduct “consti-
tutes a rejection of the principles of collective bargaining,”
deferral is not proper. Rappazzo Elec. Co., 281 NLRB 471 fn.
1 (1986). As the Board has explained, “the Board is not tres-
passing on forbidden territory when it inquires whether negotia-
tions have produced a bargain which [a respondent] refuses to
honor. The proper business of the Board is to remedy conduct
. . . that amounts to the repudiation of an obligation under the
collective-bargaining relationship.” New Mexico Symphony
Orchestra, 335 NLRB 896 fn. 8 (2001).
In the present case, I have already explained my conclusion
that the Union’s conduct constitutes a repudiation of the MOA.
This conclusion is well-summarized by counsel for the hotel,
who accurately characterizes the Union’s behavior as follows:
The Union has taken actions and adopted positions demon-
strating in no uncertain terms that it does not consider itself
bound by the parties’ Memorandum. In doing so, it has re-
nounced its collective bargaining obligations, thereby render-
ing deferral wholly inappropriate in this matter.
(CP opposition to summary judgment motion, p. 8, GC Exh.
1(l).) As the Board has noted, where a respondent’s actions:
23 Counsel for the Union’s own concise summary of the nature of the
issue presented in this case serves to demonstrate the inappropriateness
of arbitration as the means to resolve that dispute. Thus, she correctly
notes that, “[t]he only issue for the arbitrator is whether the parties
agreed to adopt the Sheraton contract or bargain directly about the six
issues about which Local 1 is refusing to bargain.” (R. Br. at p. 23.)
Resolution of this dispute calls into play the unique legal and policy-
making expertise of the Board, not the practical experience of an arbi-
trator.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
128
amount to a repudiation of the contract or strike at the very
heart of the collective-bargaining relationship, deferral is not
appropriate. Thus, the Board has stated that it will not defer in
instances where the respondent’s conduct constitutes a rejec-
tion of the principles of collective bargaining. In those in-
stances, it is unlikely that an arbitrator, whose function is lim-
ited to problems of contractual interpretation, would resolve
or remedy, if necessary, allegations of statutory wrongs . . . .
[Internal punctuation and citations omitted.]
United Cerebral Palsy of New York City, 347 NLRB 603, 606
(2006).
Because the Union’s position in this case is patently errone-
ous and its conduct represented a repudiation of both the MOA
and its statutory obligations to bargain in good faith, I find that
deferral of this matter to arbitration is inappropriate because the
issue is not eminently well suited to that process.
CONCLUSIONS OF LAW
1. The dispute underlying this litigation is not suitable for de-
ferral to the parties’arbitration process.
2. By repudiating its memorandum of agreement with the
Employer and failing and refusing to bargain over required
topics specified by that memorandum of agreement, the Union
has engaged in unfair labor practices affecting commerce with-
in the meaning of Section 8(b)(3) and Section 2(6) and (7) of
the Act.
REMEDY
Having found that the Respondent has engaged in certain un-
fair labor practices, I find that it must be ordered to cease and
desist and to take certain affirmative action designed to effectu-
ate the policies of the Act. I will also order the Respondent to
post the Board’s customary notice and to provide copies of the
notice for posting by the Employer if it so chooses.
At the beginning of this trial, I asked counsel for the General
Counsel if, “the only relief you’re seeking is an order for them
to bargain?” (Tr. 16–17.) He responded affirmatively.24 In
their posttrial briefs, neither the General Counsel nor the Em-
ployer has sought any additional relief. Nevertheless, I recog-
nize that the Board and its judges, “may grant such a remedy as
will effectuate the purposes of the Act, whether the remedy is
specifically requested or not.” Willamette Industries, 341
NLRB 560, 564 (2004). [Citations omitted.]
I have given the issue of remedy considerable thought as be-
fits the extent of the Union’s breach of its bargaining obliga-
tions under the Act. I am well aware that additional remedies
for bargaining violations exist, including an order mandating a
specific bargaining schedule or requiring the submission of
reports as to the course of such bargaining. On balance, out of
respect for the adversary process, I have decided to defer to the
moving parties’ position. They are best situated to gauge their
own needs. I will, however, urge that on final resolution of the
case, the Region’s staff maintain close communication with the
parties in order to promptly and effectively secure the Re-
spondent’s compliance with the Act’s bargaining requirements.
24 Somewhat paradoxically, however, counsel for the General Coun-
sel has characterized the Union’s misconduct as “egregious.” (Tr. 56.)
On these findings of fact and conclusions of law and on the
entire record, I issue the following recommended25
ORDER
The Respondent, Unite Here Local 1, Chicago, Illinois, its
officers, agents, and representatives, shall
1. Cease and desist from
(a) Repudiating its memorandum of agreement with the Ritz-
Carlton Water Tower Partnership (Jt. Exh. 2).
(b) Failing and refusing to bargain with the Ritz-Carlton Wa-
ter Tower Partnership regarding the following topics that are
subject to collective bargaining under the terms of the parties’
memorandum of agreement: reducing the fee paid to employ-
ees assigned to carving or other specialty stations and changing
the scheduling procedures for such employees; reducing the
gratuity paid to bell attendants for delivery of luggage to vacant
rooms; increasing the work schedule of housekeepers and elim-
inating their paid 15-minute break; reducing the payment for
making up roll-away beds or sofa beds and limiting those pay-
ments to room attendants only; lowering the room credit reduc-
tion for housekeepers based on the number of check-out rooms
per shift; and paying all new employees at the union contract
rate instead of the “Ritz rate.”
(c) In any like or related manner violating Federal labor law.
2. Take the following affirmative action necessary to effec-
tuate the policies of the Act.
(a) On request, bargain with the Ritz-Carlton Water Tower
Partnership about the topics listed in paragraph 1(b) above, and
if an understanding is reached, embody the understanding in a
signed agreement.
(b) Within 14 days after service by the Region, post at its un-
ion office in Chicago, Illinois, copies of the attached notice
marked “Appendix.”26 Copies of the notice, on forms provided
by the Regional Director for Region 13, after being signed by
the Respondent’s authorized representative, shall be posted by
the Respondent and maintained for 60 consecutive days in con-
spicuous places including all places where notices to members
are customarily posted. In addition to physical posting of paper
notices, notices shall be distributed electronically, such as by
email, posting on an intranet, or an internet site, and/or other
electronic means, if the Respondent customarily communicates
with its members by such means. Reasonable steps shall be
taken by the Respondent to ensure that the notices are not al-
tered, defaced, or covered by any other material.
25 If no exceptions are filed as provided by Sec. 102.46 of the
Board’s Rules and Regulations, the findings, conclusions, and recom-
mended Order shall, as provided in Sec. 102.48 of the Rules, be adopt-
ed by the Board and all objections to them shall be deemed waived for
all purposes.
26 If this Order is enforced by a judgment of a United States court of
appeals, the words in the notice reading “Posted by Order of the Na-
tional Labor Relations Board” shall read “Posted Pursuant to a Judg-
ment of the United States Court of Appeals Enforcing an Order of the
National Labor Relations Board.”
UNITE HERE LOCAL 1 (RITZ-CARLTON WATER TOWER )
129
(c) Sign and return to the Regional Director sufficient copies
of the notice for posting by the Ritz-Carlton Water Tower Part-
nership, if willing, at all places where notices to employees are
customarily posted.
(d) Within 21 days after service by the Region, file with the
Regional Director a sworn certification of a responsible official
on a form provided by the Region attesting to the steps that the
Respondent has taken to comply.