358 NLRB 737
International Brotherhood of Electrical Workers, Local 196 (Aldridge Electric, Inc.)
ELECTRICAL WORKERS LOCAL 196 (ALDRIDGE ELECTRIC)
737
358 NLRB No. 87
International Brotherhood of Electrical Workers,
Local 196 and Aldridge Electric, Inc. and Inter-
national Union of Operating Engineers, Local
150. Case 13–CD–068444
July 24, 2012
DECISION AND DETERMINATION OF DISPUTE
BY CHAIRMAN PEARCE AND MEMBERS HAYES
AND BLOCK
This is a jurisdictional dispute proceeding under Sec-
tion 10(k) of the National Labor Relations Act. Aldridge
Electric, Inc. (the Employer) filed a charge on November
8, 2011, alleging that the Respondent, International
Brotherhood of Electrical Workers, Local 196, violated
Section 8(b)(4)(D) of the Act by threatening to engage in
proscribed activity with an object of forcing the Employ-
er to assign certain work to employees it represents ra-
ther than to employees represented by International Un-
ion of Operating Engineers, Local 150. A hearing was
held on December 8, 2011, before Hearing Officer Kate
M. H. Gianopulos. Thereafter, Local 196 and Local 150
filed posthearing briefs.1 Local 150 also filed a motion
to quash the Section 10(k) notice of hearing.
The National Labor Relations Board has delegated its
authority in this proceeding to a three-member panel.2
The Board affirms the hearing officer’s rulings, find-
ing them free from prejudicial error. On the entire record,
the Board makes the following findings.
I. JURISDICTION
The parties stipulated that the Employer is an Illinois
corporation with its principal place of business in Liber-
tyville, Illinois. They also stipulated that during the 12-
month period preceding the hearing, a representative
period, the Employer purchased and received goods and
services valued in excess of $50,000 directly from enti-
ties located outside the State of Illinois. The parties fur-
ther stipulated, and we find, that the Employer is en-
gaged in commerce within the meaning of Section 2(6)
and (7) of the Act. We further find, based on the stipula-
tions of the parties, that Local 196 and Local 150 are
labor organizations within the meaning of Section 2(5) of
the Act.
1 We deny as moot the Employer’s March 29, 2012 motion for an
expedited decision in this matter, responded to by Local 150 on April
11, 2012. Cases alleging violations of Sec. 8(b)(4)(D) are accorded
statutory priority in Board processing pursuant to Sec. 10(l) of the Act,
and we have so treated this case.
2 Member Griffin is recused and did not participate in the considera-
tion of this case.
II. THE DISPUTE
A. Background and Facts of Dispute
The Employer specializes in electrical industry con-
struction. The project at issue involves installation of
approximately 400 miles of underground cable and aerial
cable infrastructure for iFiber, an organization dedicated
to bringing broadband internet to underserved areas in
northern Illinois. Before it bid on the project, the Em-
ployer signed a memorandum of understanding with Lo-
cal 196 setting preferential wage rates and benefits for
employees working for it on the iFiber project.
Pursuant to a March 21, 1988 letter of assent, the Em-
ployer has been signatory to the agreement between Lo-
cal 196 and the American Line Builders Chapter of the
National Electrical Contractors Association. The current
agreement is effective from March 7, 2011, through
March 2, 2014. The American Line Builders Agreement
covers the following work:
Outside utility and commercial power, high voltage
pipe type cable, highway lighting, street lighting, air-
port lighting, government parks, traffic signals and all
electrical underground work which is within the juris-
diction of the local union, as well as excavating and
placing underground facilities, including electric, gas,
telephone and cable television for telephone and elec-
tric utility companies when in a joint trench with elec-
tric and required by the customer.
(Electrical underground construction shall include ex-
cavation of earth related to all electrical equipment in-
cluding, laying of conduits, ducts, cables and bases for
street lights, traffic signals, transformers, pad mounted
switch gear and excavation for manholes.)
Pursuant to an October 20, 1970 memorandum of
agreement, the Employer has been signatory to the Rock-
ford Heavy and Highway Agreement between Local 150
and the Northwestern Illinois Contractors Association.
The current agreement is effective from June 1, 2011,
through May 31, 2014. The Rockford agreement covers,
in pertinent part, “pile driving and all other underground
utility work, heavy construction work of all types, . . .
and all assembly and disassembly of all production
equipment on the jobsite coming under the jurisdiction of
the Operating Engineers.”
On June 17, 2011,3 after the Employer had been
awarded its portion of the iFiber project, Local 150 sent
the Employer a letter requesting that it schedule a pre-job
conference regarding the iFiber project. On June 20, the
Employer sent Local 196 a letter stating its intent to use
3 All dates are in 2011 unless stated otherwise.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
738
Local 196 for “underground and aerial infrastructure and
cabling within [Local 196’s] jurisdiction.” On June 22,
Local 196 sent the Employer a letter acknowledging the
Employer’s June 20 letter. Having learned of Local
150’s interest in the work, Local 196 further stated in its
June 22 letter that the work was properly assigned to
Local 196, and that “Local 196 will undertake it’s [sic]
own action (including picketing) if work is improperly
taken away from IBEW Local 196 based on the actions
of other unions.”
In July, before construction had begun, Employer Vice
President Wayne Gearig met representatives from Local
150 for a pre-job meeting. Gearig told Local 150’s rep-
resentatives that the Employer was assigning all the work
to Local 196. Local 150’s representatives disagreed with
the assignment and stated that they thought the operating
equipment work belonged to Local 150. In October, the
Employer filed a charge against Local 150 alleging that
Local 150 claimed the disputed work and that Local 196
threatened it would picket if the disputed work were re-
assigned. After being informed that the charge needed to
be filed against the party threatening unlawful action, the
Employer withdrew its charge against Local 150 and
filed the instant charge against Local 196.
B. Work in Dispute
The parties did not stipulate to the work in dispute.
The notice of hearing described the disputed work as
follows:
[I]nstalling a series of 144 count fiber optic links
throughout the following Illinois counties: Joe Davies
[sic], Stephenson, Whiteside, Carroll, Lee, Ogle,
Boone, Winnebago, and LaSalle, pursuant to the iFiber
project. Type of work covered is the installation of
duct or conduit, installation of hand holes, installation
of fiber optic cable along roadways, overhead and un-
derground, fiber splicing, installation of splice boxes,
and all related work to complete construction of fiber
install using manual installation methods, cable plows
and other heavy machinery such as bulldozers.
The Employer and Local 196 agree with this description.
Local 150 contends that the work in dispute is limited to the
use of heavy machinery, including mini excavators, trench-
ers, bulldozers, directional boring rigs, locators, plows, and
skidsters, to install fiber optic cable. We find, based on the
record, that the work in dispute is as follows: the installa-
tion of cable using mini excavators, trenchers, bulldozers,
directional boring rigs, locators, plows, skidsters, and other
heavy machinery for the Employer pursuant to the iFiber
project located in Jo Daviess, Stephenson, Whiteside, Car-
roll, Lee, Ogle, Boone, Winnebago, and LaSalle counties.
See Laborers Local 317 (Grazzini Bros.), 307 NLRB 1290,
1290 fn. 4 (1992) (finding work in dispute was limited to
the finishing work associated with a ceramic tile installation
project where one of the unions claimed only the finishing
work).
C. Contentions of the Parties
Local 150 contends that the notice of hearing should
be quashed. It contends that it has not claimed the dis-
puted work. Relying on Laborers (Capitol Drilling Sup-
plies), 318 NLRB 809 (1995), Local 150 argues that it
has pursued only contractual grievances against the Em-
ployer for breaching the subcontracting clause of their
collective-bargaining agreement. Local 150 further ar-
gues that Local 196’s threat to picket was simply a sham
designed to trigger a 10(k) hearing. Finally, Local 150
contends that the parties agreed to submit this dispute to
an agreed-upon method for voluntary adjustment. On the
merits of the award, assuming they are reached, Local
150 asserts that the work in dispute should be awarded to
employees represented by Local 150 based on the factor
of relative skills and training.
The Employer4 and Local 196 contend that there is
reasonable cause to believe that Section 8(b)(4)(D) has
been violated because of Local 196’s letter threatening
picketing. They further contend that there are competing
claims to the disputed work, and therefore the notice of
hearing should not be quashed. Both the Employer and
Local 196 assert that there is no agreed-upon method for
voluntary adjustment of the dispute. On the merits, Lo-
cal 196 asserts that the work in dispute should be award-
ed to employees represented by it based on the factors of
collective-bargaining agreements, employer preference,
current assignment and past practice, area and industry
practice, relative skills, and economy and efficiency of
operations.
D. Applicability of the Statute
The Board may proceed with a determination of a dis-
pute under Section 10(k) of the Act only if there is rea-
sonable cause to believe that Section 8(b)(4)(D) has been
violated. This standard requires finding that there is rea-
sonable cause to believe that there are competing claims
to the disputed work among rival groups of employees,
and that a party has used proscribed means to enforce its
claim to the work in dispute. Additionally, there must be
a finding that the parties have not agreed on a method for
the voluntary adjustment of the dispute. See, e.g., Oper-
ating Engineers Local 150 (R&D Thiel), 345 NLRB
4 Although the Employer did not file a posthearing brief, at the hear-
ing, the Employer’s representative adopted Local 196’s statement re-
garding the applicability of the Act.
ELECTRICAL WORKERS LOCAL 196 (ALDRIDGE ELECTRIC)
739
1137, 1139 (2005). On this record, we find that these
requirements have been met.
1. Competing claims for work
We find that there is reasonable cause to believe that
both Unions have claimed the work in dispute for the
employees they represent. By its own admission, Local
196 has done so, and those employees have been per-
forming the work. Despite its protestations to the contra-
ry, Local 150 has claimed the work as well. In its June
17 letter to the Employer, Local 150 requested a pre-job
conference regarding the iFiber project. According to the
Rockford Heavy and Highway Agreement, the purpose
of a pre-job conference is to provide Local 150 with the
information necessary for the employees it represents to
prepare to do the work at issue, including the employer’s
requirements for workmen, the probable starting date of
the work, the duration of the job, and the machines to be
used. In addition, at the pre-job conference, Local 150’s
representatives said that they thought the operating
equipment work belonged to Local 150. See J. P. Patti
Co., 332 NLRB 830, 832 (2000) (finding reasonable
cause to believe union claimed work where business
agent asked employer to assign it to his union). Unlike
the union in Capitol Drilling, supra, Local 150 has done
more than peacefully pursue grievances against a general
contractor for violating the subcontracting clause of its
collective-bargaining agreement with the general con-
tractor. Thus, this dispute is “a traditional 10(k) situation
in which two unions have collective-bargaining agree-
ments with the employer, and each union claims that its
contract covers the disputed work assigned and con-
trolled by the employer.” Laborers Local 81 (Kenny
Construction Co.), 338 NLRB 977, 978 (2003).
2. Use of proscribed means
We also find that there is reasonable cause to believe
that Local 196 used means proscribed under Section
8(b)(4)(D) to enforce its claim. Local 196’s June 22 let-
ter to the Employer, threatening it with picketing “if
work is improperly taken away from IBEW Local 196
based on the actions of other unions,” constituted a threat
to take proscribed coercive action in furtherance of a
claim to the disputed work. Further, Local 196 testified
that it was planning to follow through on the threats
made in this letter.
Local 150 urges the Board to find that Local 196’s
threat was in fact a sham in order to secure the work as-
signment through a 10(k) proceeding. We reject that
argument. First, Local 150 points to Local 196’s collec-
tive-bargaining agreement with the Employer, which
prohibits strikes or work stoppages, as evidence that Lo-
cal 196 did not intend to follow through on its threats. A
threat to strike or picket is not a sham, however, simply
because the threatened action would have violated a no-
strike clause. Laborers Local 265 (AMS Construction),
356 NLRB 306, 309 (2010); Lancaster Typographical
Union No. 70 (C.J.S. Lancaster), 325 NLRB 449, 450–
451 (1998). Second, Local 150 points to evidence of
cooperation between the Employer and Local 196 during
these 10(k) proceedings as evidence that the threat was
the product of collusion. Specifically, Local 150 notes
that the Employer first filed a charge against Local 150,
that the Employer gave exhibits to Local 196’s counsel
to use at the hearing, that the Employer’s vice president
met with Local 196’s counsel before the hearing, and that
Local 196’s business agent said that he would work with
the Employer to have the 10(k) hearing resolved in its
favor. Contrary to Local 150’s contention, this evidence
of cooperation is not affirmative evidence that Local
196’s threat was the product of collusion. See generally
R&D Thiel, supra at 1140 (finding no affirmative evi-
dence of collusion where the Teamsters told the employ-
er’s president that it wanted him “to file a 10(k)”).
3. No voluntary method for adjustment of dispute
We further find, in agreement with the Employer and
Local 196, that there is no method for voluntary adjust-
ment of the dispute to which all parties are bound. Local
150 asserts that all parties are bound by the AFL–CIO
Building and Construction Trades Department’s Plan for
the Settlement of Jurisdictional Disputes in the Construc-
tion Industry (the Plan). All parties to the dispute must
be bound to the Plan for it to constitute an agreed-upon
method of voluntary adjustment. See, e.g., Laborers
Local 1184 (High Light Electric), 355 NLRB 167, 169
(2010). The Board carefully scrutinizes the agreements
at issue in order to determine if the parties are bound. Id.
Local 150 submitted into evidence a copy of a Decem-
ber 6 arbitrator’s decision finding that the Employer and
Local 150 were bound under the Plan. As Local 150
points out, the arbitrator noted in his decision that
“[t]here is no dispute that IBEW is stipulated to the
Plan.” However, the arbitrator’s decision cannot bind
Local 196 to the Plan inasmuch as Local 196 was not
party to the arbitral proceeding and did not agree to be
bound by its results.5 High Light Electric, supra at 169.
5 The International Brotherhood of Electrical Workers did participate
in the December 6 arbitral hearing, but Local 196 did not. Even if the
arbitrator’s decision establishes that the International is bound under
the Plan, it does not necessarily follow that Local 196 was so bound.
Local 196 Business Agent Eric Patrick testified, without contradiction,
that only “inside” IBEW locals are bound under the Plan, that Local
196 is an “outside” local, and that Local 196 is not affiliated with the
Building and Construction Trades Department. See Electrical Workers
Local 357 (Western Diversified Electric), 344 NLRB 1239, 1240
(2005) (finding no agreed-upon method for voluntary adjustment exist-
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
740
Furthermore, the documents on which the arbitrator
based his decision were not put into evidence in this pro-
ceeding. See id. Without those documents, the Board
will not broadly interpret the arbitrator’s statement to
mean that Local 196 bound itself to the Plan. Finally, the
collective-bargaining agreement between the Employer
and Local 196 does not support a finding that Local 196
was bound by the Plan because it makes no reference to
the Plan. See id. In these circumstances, we find that
Local 150 has not established that Local 196 is bound
under the Plan.6
Based on the foregoing, we find that there is reasona-
ble cause to believe that Section 8(b)(4)(D) has been
violated, and that there is no agreed-upon method for the
voluntary adjustment of the dispute. We accordingly find
that the dispute is properly before the Board for determi-
nation, and we deny Local 150’s motion to quash the
notice of hearing.
E. Merits of the Dispute
Section 10(k) requires the Board to make an affirma-
tive award of disputed work after considering various
factors. NLRB v. Electrical Workers Local 1212 (Co-
lumbia Broadcasting), 364 U.S. 573, 577 (1961). The
Board’s determination in a jurisdictional dispute is an act
of judgment based on common sense and experience,
reached by balancing the factors involved in a particular
case. Machinists Lodge 1743 (J. A. Jones Construction),
135 NLRB 1402 (1962). The following factors are rele-
vant in making the determination of this dispute.
1. Board certifications and collective-bargaining
agreements
Both Local 196 and Local 150 have binding contracts
with the Employer. Language in each contract arguably
covers the work in dispute. Therefore, the factor of col-
lective-bargaining agreements does not favor an award to
employees represented by either union. See High Light
Electric, supra at 169.
2. Employer preference, current assignment, and
past practice
The Employer assigned the disputed work to employ-
ees represented by Local 196 and prefers that they con-
tinue to perform the work. The Employer has a past
practice of assigning similar work to employees repre-
sented by Local 196. Although the Employer has as-
ed where IBEW local testified that Plan only applied to work claimed
under the inside agreement). The record is devoid of documentary
evidence tending to show otherwise.
6 We find it unnecessary to reach whether Local 150 established that
the Employer was bound under the Plan because all parties to the dis-
pute must be bound if an agreement is to constitute an agreed-upon
method of voluntary adjustment. High Light Electric, supra at 169.
signed similar work to Local 150 in the past, that work
was performed by the Employer’s power division, and a
different division is performing the work on the iFiber
project. Therefore, we find that the factors of employer
preference, current assignment, and past practice favor
awarding the disputed work to employees represented by
Local 196.
3. Industry and area practice
Local 196 submitted letters from J. F. Edwards Con-
struction Company, Michels Corporation, Trench-It,
Gaffney’s PMI, and CCS Utilities asserting that their
companies perform the same type of cabling work in and
around Illinois and that their companies use employees
represented by Local 196 to perform that work. Local
150 Business Representative Michael Kresge testified,
without contradiction, that Pirtano, Kirby Cable, and
Midwest Underground are currently performing cabling
work for the iFiber project with employees represented
by Local 150. Kresge further testified that Illinois Hy-
draulic, Electric Conduit, Aspen Utilities, Mid-America
Underground, RJ Underground, and Henkels & McCoy
perform similar cabling work with employees represent-
ed by Local 150.
Based on the record evidence, we find that it is an area
practice to assign this type of cabling work to employees
represented by Local 196 and to employees represented
by Local 150. Accordingly, we find that the industry and
area practice factor does not favor an award of the dis-
puted work to employees represented by either union.
4. Relative skills and training
Local 196 presented evidence that employees it repre-
sents have the training and skills necessary to perform
the disputed work. Local 196 Business Agent Eric Pat-
rick testified that Local 196 apprentices are trained in
fiber optic, underground, and overhead cabling at the
American Line Builders Apprenticeship Training facility
in Medway, Ohio. After apprentices complete this pre-
liminary training, they receive further training on the job,
in the classroom, and by using books.
Local 150 presented no specific evidence of the train-
ing received by employees it represents. Business Rep-
resentative Kresge did testify, however, that employees
represented by Local 150 are performing similar cabling
work on other portions of the iFiber project. And the
Board has recognized that “Operating Engineers repre-
sents employees who are skilled in the operation of
heavy equipment.” Operating Engineers Local 825
(Cruz Contractors), 239 NLRB 490, 493 (1978).
Given these considerations, we find that the relative
skills and training factor does not favor an award of the
ELECTRICAL WORKERS LOCAL 196 (ALDRIDGE ELECTRIC)
741
disputed work to employees represented by either union.
See id.
5. Economy and efficiency of operations
Employer Vice President Gearig testified that it is
more efficient to use equipment operators represented by
Local 196 because the Employer can use the same em-
ployees to perform other work on the iFiber project, in-
cluding setting hand-holes, pulling cable, and operating
other machines. He further testified that, to his
knowledge, employees represented by Local 150 or any
other union could not engage in the same multitasking.
Gearig also testified that there have been no safety or
quality issues on the portions of the iFiber project al-
ready completed using employees represented by Local
196.
Local 150 took no position on the economy and effi-
ciency of operations factor. Based on the uncontroverted
testimony presented by the Employer, we find that the
factor of economy and efficiency of operations favors
awarding the disputed work to employees represented by
Local 196. See, e.g., Laborers (Eshbach Bros., LP), 344
NLRB 201, 204 (2005) (finding that economy and effi-
ciency favored award of disputed work to “more versa-
tile” employees who can perform work on a project in
addition to the disputed work).
Conclusions
After considering all of the relevant factors, we con-
clude that employees represented by Local 196 are enti-
tled to continue performing the work in dispute. We
reach this conclusion relying on the factors of employer
preference, current assignment, and past practice and
economy and efficiency of operations. In making this
determination, we award the work to employees repre-
sented by Local 196, not to that labor organization or to
its members. The determination is limited to the contro-
versy that gave rise to this proceeding.
DETERMINATION OF DISPUTE
The National Labor Relations Board makes the follow-
ing Determination of Dispute.
Employees of the Employer, Aldridge Electric, Inc.,
represented by International Brotherhood of Electrical
Workers, Local 196, are entitled to perform the installa-
tion of cable using mini excavators, trenchers, bulldoz-
ers, directional boring rigs, locators, plows, skidsters, and
other heavy machinery for the Employer pursuant to the
iFiber project located in Jo Daviess, Stephenson, White-
side, Carroll, Lee, Ogle, Boone, Winnebago, and LaSalle
counties.