359 NLRB 724
Laborers' International Union of North America, Local 860 (McNally/Kiewit)
724
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
359 NLRB No. 89
Laborers’ International Union of North America
(AFL–CIO), Laborers Local No. 860 and
McNally/Kiewit ECT JV and International Un-
ion of Operating Engineers, Local 18. Case 08–
CD–086140
April 8, 2013
DECISION AND DETERMINATION OF DISPUTE
BY CHAIRMAN PEARCE AND MEMBER BLOCK
This is a jurisdictional dispute proceeding under Sec-
tion 10(k) of the National Labor Relations Act. McNal-
ly/Kiewit ECT JV (the Employer) filed a charge on July
27, 2012, alleging that the Respondent, Laborers’ Inter-
national Union of North America (AFL–CIO), Laborers
Local No. 860 (Laborers), violated Section 8(b)(4)(D) of
the Act by threatening to engage in proscribed activity
with an object of forcing the Employer to assign certain
work to employees it represents rather than to employees
represented by International Union of Operating Engi-
neers, Local 18 (Operating Engineers). The hearing was
held on October 18 and 19, 2012, before Hearing Officer
Catherine A. Modic. Thereafter, the Employer, Labor-
ers, and Operating Engineers each filed a posthearing
brief. Operating Engineers also filed a motion to quash
the 10(k) notice of hearing.
The National Labor Relations Board has delegated its
authority in this proceeding to a three-member panel.1
The Board affirms the hearing officer’s rulings, find-
ing them free from prejudicial error. On the entire rec-
ord, we make the following findings
I. JURISDICTION
The parties stipulated that within the 12 months pre-
ceding the filing of the charge, the Employer purchased
and received at its Cleveland jobsite goods and services
valued in excess of $50,000 directly from points located
outside the State of Ohio. The parties also stipulated,
and we find, that the Employer is engaged in commerce
within the meaning of Section 2(6) and (7) of the Act and
that Laborers and Operating Engineers are labor organi-
zations within the meaning of Section 2(5) of the Act.
II. THE DISPUTE
A. Background and Facts of the Dispute
The Employer is a partnership that was formed to con-
struct the Euclid Creek Tunnel (ECT), an underground
sewer tunnel, in Cleveland, Ohio. The tunnel is intended
to carry, store, and treat water overflows from heavy
rains and to prevent raw sewage from draining into Lake
Erie and local rivers. The three job classifications in
1 Member Griffin, who is a member of the present panel, has recused
himself and took no part in the consideration of this case.
dispute, described more fully below, are ring builder 1
(RB1), ring builder 2 (RB2), and segment preparation
person (SPP).
To excavate the tunnel, the Employer uses a tunnel
boring machine (TBM), which was designed and built
specifically for the project. The TBM is 370 feet long
and 27 feet in diameter, and it moves on a rail line. As
the TBM bores a 27-foot-diameter hole, workers simul-
taneously construct the tunnel lining by connecting seg-
ments of precast concrete, brought there by rail car. The
TBM’s components include a hydraulic loader, used to
unload the tunnel lining support segments, and a segment
vacuum erector, used to assemble the segments into
rings. Each completely constructed ring of six segments
measures about 5 feet in length.
Employees in the SPP, RB1, and RB2 positions work
together to construct the tunnel lining. The SPP operates
the hydraulic loader. After unloading each segment, the
SPP inspects and cleans it and then moves it to a feed
table, where the segment is rotated into the appropriate
position for installation and then cleaned again. The SPP
hammers dowels into each segment to align it and hold it
in place. Once the segments form a ring, the SPP installs
foam weather stripping around it. Additionally, the SPP
works with two Laborers-represented employees to ex-
tend, or “leapfrog,” the TBM’s rail line. The SPP also
cleans the work area using brooms, shovels, and a water
hose.
After a new section of tunnel has been bored, the RB1
controls the hydraulics of the TBM’s thrust cylinders,
which are used to lift the ring segments into place. Each
time the TBM is stopped, the RB1 performs a final in-
spection of each ring segment before it is installed. The
RB1 works with the RB2 to verify, through identification
marks on each segment, the proper sequence for installa-
tion of the six segments. The RB1 jockeys the segments
into their proper positions using a hydraulic jack, cleans
and clears the area of the TBM where the rings are as-
sembled, and assists Laborers-represented employees
with drilling, grouting, cleaning, and moving rails for
both the segment-delivering rail car and the TBM.
The RB2 takes measurements to verify that the TBM
will not collide with each segment being delivered. After
the segments are in place, the RB2 bolts the segments
together using an impact wrench. The RB2 assists La-
borers-represented employees with grouting by drilling
verification holes and then patching those holes. The
RB2 is also responsible for keeping areas clean and as-
sists in moving rails for both the rail car and the TBM.
Ohio Contractors Association (OCA), of which the
Employer is a member, and Operating Engineers are par-
ties to the Ohio Heavy Highway Agreement (Highway
LABORERS’ INTERNATIONAL UNION OF NORTH AMERICA
725
Agreement). The Highway Agreement includes “Sewer,
Waterworks and Utility Construction” as work per-
formed under the Highway Agreement and identifies
“Tunnel Machines and/or Mining Machines” as equip-
ment covered by and subject to its terms and conditions.
The Highway Agreement also contains a work preserva-
tion clause: it mandates a specific economic penalty in
the event that a signatory employer assigns a piece of
equipment covered by the Highway Agreement to an
employee who is not represented by Operating Engi-
neers. Specifically, the Highway Agreement states, “If
the Employer assigns any piece of equipment to someone
other than an Operating Engineer, the Employer’s penal-
ty shall be to pay the first qualified registered applicant
the applicable wages and fringe benefits from the first
day of the violation.”
OCA and Laborers’ District Council of Ohio are par-
ties to the Ohio Highway-Heavy-Municipal-Utility State
Construction Agreement (Construction Agreement).2 The
Construction Agreement covers “Sewer, Waterworks,
[and] Utility Construction.” In addition, several sections
of the Construction Agreement employ the terms “tunnel
work,” “construction of sewers [and] tunnels,” and relat-
ed terms.
The Employer entered into a project labor agreement
with each union for the tunnel work. Each project labor
agreement incorporates the relevant OCA agreement.
The project labor agreement with Operating Engineers
was signed on February 2, 2011, and the agreement with
Laborers was signed on May 2, 2011. There is no men-
tion of the terms “Ring Builder 1,” “Ring Builder 2,” or
“Segment Preparation Person” in the Heavy Highway
Agreement, the Construction Agreement, or either of the
project labor agreements.
On February 7, 2011, Employer Project Manager Tom
Szaraz and Operating Engineers representatives signed a
prejob conference form, which indicated that mining
machines and Operating Engineers-represented TBM
workers and segmenters would be used for the project.
Szaraz testified that during the prejob conference, David
Russell, a field agent for Operating Engineers, orally
requested the work in dispute. Russell also gave Szaraz
a blank assignment form on which to designate Operat-
ing Engineers-represented employees who would be as-
signed the work and specific equipment for those em-
ployees to use. Szaraz declined to fill out the form. He
testified that he never told Russell that he would assign
the disputed work to Operating Engineers-represented
employees. Szaraz further testified that Russell again
2 There is no dispute that the Employer is bound by the terms of the
Highway Agreement and the Construction Agreement.
requested the work on two occasions in July 2012, when
the two men discussed the matter further.
No prejob conference was held between the Employer
and Laborers, although Laborers requested one in De-
cember 2010 and again after signing the project labor
agreement in May 2011. On July 23, 2012, Anthony
Liberatore, Laborers’ business manager and secretary-
treasurer, informed Szaraz that Laborers-represented
employees would strike if the Employer assigned the
tunnel project’s “pipe segment installation work” to Op-
erating Engineers. On July 27, 2012, the Employer filed
the instant charge.
In August 2012, based on its superintendents’ staffing
recommendations, the Employer assigned Laborers
members to the SPP, RB1, and RB2 positions. Soon
afterwards, Operating Engineers filed a grievance alleg-
ing that the assignment of work to Laborers violated Op-
erating Engineers’ collective-bargaining agreement with
the Employer.
B. Work in Dispute
The notice of hearing described the disputed work as
“the segment installation work performed by ring builder
1 and ring builder 2.” At the beginning of the hearing,
the Employer and Laborers moved to amend the notice to
include the work performed by the segment preparation
person (SPP). Although Operating Engineers declined to
stipulate to the addition, on the grounds that entering into
a stipulation would be an admission contrary to its legal
position that it never made a claim for the work, the tes-
timony dealt with all three positions. There is no dispute
that the Employer assigned all three positions to Labor-
ers, and, as further discussed below, the record supports a
finding that Operating Engineers claimed the work per-
formed by employees in all three positions. We therefore
find that the work in dispute includes the work of the
SPP as well as that of the RB1 and RB2.
C. Contentions of the Parties
Operating Engineers contends that it has not claimed
the disputed work and that the notice of hearing should
therefore be quashed. Operating Engineers further ar-
gues that its claim is one of work preservation rather than
work acquisition and that it has pursued only contractual
grievances against the Employer for breaching the work
assignment provisions of their collective-bargaining
agreement. Alternatively, if the notice of hearing is not
quashed, Operating Engineers asserts that employer pref-
erence should be disregarded in this case and that the
work in dispute should be awarded to employees repre-
sented by Operating Engineers, based on the factors of
collective-bargaining agreements and relative skills and
training.
726
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
The Employer and Laborers contend that, because
there are competing claims to the disputed work, the no-
tice of hearing should not be quashed. They further con-
tend that there is reasonable cause to believe that Section
8(b)(4)(D) has been violated because of Laborers’ threat
to strike. Both the Employer and Laborers assert that
there is no agreed-upon method for voluntary adjustment
of the dispute. On the merits, Laborers asserts that the
work in dispute should be awarded to employees it repre-
sents based on the factors of collective-bargaining
agreements, employer preference, current assignment and
past practice, area and industry practice, relative skills,
and economy and efficiency of operations. The Employ-
er also asserts that the work should be awarded to Labor-
ers, largely for the same reasons. In particular, the Em-
ployer emphasizes its preference and past practice, and it
further asserts that economy and efficiency of operations
favor continuing the assignment of the work to Laborers-
represented employees.
D. Applicability of the Statute
The Board may proceed with determining a dispute
pursuant to Section 10(k) of the Act only if there is rea-
sonable cause to believe that Section 8(b)(4)(D) has been
violated. Operating Engineers Local 150 (R&D Thiel),
345 NLRB 1137, 1139 (2005). This standard is met if
there is reasonable cause to believe that there are compet-
ing claims for the disputed work between rival groups of
employees and that a party has used proscribed means to
enforce its claim to the work. Ibid. Additionally, there
must be a finding that the parties have not agreed on a
method for the voluntary adjustment of the dispute. Ibid.
Those requirements have been met here.
1. Competing claims for work
We find that there is reasonable cause to believe that
both unions have claimed the work in dispute for the
employees they represent. By its own admission, Labor-
ers has done so, and employees it represents have been
performing the work.
Operating Engineers contends that its actions did not
constitute a competing claim for work. We reject this
argument. Operating Engineers representatives orally
requested the work on three occasions: during a prejob
conference with the Employer in February 2011, and on
two occasions in July 2012. Those requests are sufficient
to establish a competing claim for the work. See Electri-
cal Workers Local 196 (Aldridge Electric, Inc.), 358
NLRB 737, 739–740 (2012); J. P. Patti Co., 332 NLRB
830, 832 (2000).3 Accordingly, we find reasonable cause
3 In addition to its explicit claims for the work, Operating Engineers
filed a grievance against the Employer to enforce the damages provi-
to believe that there are two competing claims for the
disputed work.
2. Use of proscribed means
As described above, by letter dated July 23, 2012, La-
borers stated that its members would strike if the Em-
ployer assigned the tunnel project’s pipe segment instal-
lation work to Operating Engineers. Such a threat estab-
lishes reasonable cause to believe that Laborers used
means proscribed by Section 8(b)(4)(D) to enforce its
claim to the work in dispute. Electrical Workers Local
48 (Kinder Morgan Terminals), 357 NLRB 2217, 2219
(2011).
3. No voluntary method for adjustment of dispute
There is no evidence in the record of an agreed-upon
method for voluntary adjustment of the dispute.
4. Work preservation defense
Operating Engineers asserts that the dispute involves a
work preservation issue rather than a jurisdictional mat-
ter. If a dispute is fundamentally over the preservation of
work a union’s members have historically performed, it
is not a jurisdictional dispute. Machinists District 190
Local 1414 (SSA Terminal, LLC), 344 NLRB 1018, 1020
(2005), affd. 253 Fed.Appx. 625 (9th Cir. 2007); Seafar-
ers (Recon Refractory & Construction), 339 NLRB 825,
827 (2003), review denied sub nom. Recon Refractory &
Construction Inc. v. NLRB, 424 F.3d 980 (9th Cir. 2005).
The Board looks to the “real nature and origin of the dis-
pute” to determine whether it actually constitutes a dis-
pute between two unions or whether, instead, one union
is “attempt[ing] to retrieve the jobs’ of employees the
employer chose to supplant by reallocating their work to
others.” Teamsters Local 578 (USCP-Wesco), 280
NLRB 818, 820–821 (1986) (quoting Longshoremen
ILWU Local 26 (American Plant Protection), 210 NLRB
574, 576 (1974)), affd. sub nom. USCP-Wesco, Inc. v.
NLRB, 827 F.2d 581 (9th Cir. 1987). If the latter, the
dispute is outside the scope of Section 10(k).
To prevail on its work preservation defense, Operating
Engineers must show that the employees it represents
have previously performed the work in dispute and that it
is not attempting to expand its work jurisdiction. Car-
penters (Prate Installations, Inc.), 341 NLRB 543, 544
(2004); Stage Employees IATSE Local 39 (Shepard Ex-
position Services), 337 NLRB 721, 723 (2002). Operat-
sion of the Highway Agreement, which requires the Employer to pay an
Operating Engineers applicant contractual wages and fringe benefits in
lieu of employing him or her. We find that Operating Engineers’
grievance constitutes a claim for work in and of itself. See Laborers
Local 265 (AMS Construction), 356 NLRB 306, 309 (2010) (holding
that “pay-in-lieu” grievance constituted claim for work); Laborers
(Eshbach Bros.), 344 NLRB 201, 202 (2005) (same).
LABORERS’ INTERNATIONAL UNION OF NORTH AMERICA
727
ing Engineers fails to make that showing. Although Op-
erating Engineers-represented employees have filled crit-
ical roles on other tunnel projects, including operating
TBMs, there is no evidence that they have ever per-
formed work analogous to segment handling and ring
building. The Employer’s project manager, Szaraz, testi-
fied that the “tunnel job” in this case involved “a piece of
equipment of first impression.” The record shows that
neither union’s members had prior experience with the
TBM used here, which was in fact designed specifically
for this project. During their prejob conference, Operat-
ing Engineers representatives informed Szaraz that they
did not yet know of any “segmenters” among their mem-
bers; Operating Engineers Field Agent Russell testified
that he was unaware of any experienced ring builders.
The TBM operator and a ring builder for this project
were brought in from out of state because they had expe-
rience performing the required job tasks. The TBM
manufacturer provided training onsite for the employees
who were to perform the three jobs. Because the record
shows that Operating Engineers’ claim here encom-
passed work unlike any previously performed by em-
ployees it represents, Operating Engineers’ “objective
here was not that of work preservation, but of work ac-
quisition.” Prate Installations, above at 545 (emphasis
in original) (citing Stage Employees IATSE Local 39,
above at 723)). Accordingly, Operating Engineers fails
to establish a work preservation defense.
We therefore find that this dispute is properly before
the Board for determination, and we deny Operating En-
gineers’ motion to quash the notice of hearing.
E. Merits of the Dispute
Section 10(k) requires the Board to make an affirma-
tive award of disputed work after considering various
factors. NLRB v. Electrical Workers Local 1212 (Co-
lumbia Broadcasting), 364 U.S. 573, 577–579 (1961).
The Board’s determination in a jurisdictional dispute is
“an act of judgment based on common sense and experi-
ence,” reached by balancing the factors involved in a
particular case. Machinists Lodge 1743 (J. A. Jones
Construction), 135 NLRB 1402, 1410–1411 (1962).
The following factors are relevant in determining the
outcome of this dispute.
1. Certifications and collective-bargaining agreements
There is no evidence of a Board certification concern-
ing the job classifications or work involved in this dis-
pute.
As indicated above, the Employer is subject to collec-
tive-bargaining agreements with both Operating Engi-
neers and Laborers. Each contract contains language that
arguably encompasses the work in dispute. Operating
Engineers’ contract assigns sewer and underground work
and “tunnel machine” work to its covered employees;
Laborers’ contract refers to “tunnel work.”
“In interpreting collective-bargaining agreements, the
specific is favored over the general.” Laborers Local
1184 (Golden State Boring & Pipejacking), 337 NLRB
157, 159 (2001) (quoting Steelworkers Local 392 (BP
Minerals), 293 NLRB 913, 914–915 (1989)). In Labor-
ers Local 265 (AMS Construction), 356 NLRB 306
(2010), the Board found that the collective-bargaining
agreement factor weighed in favor of the union whose
contract specifically referred to the disputed work as well
as related work and equipment, as opposed to the union
whose contract was worded in more general terms. Id.,
slip op. at 6. In this case, each union’s contract contains
general language to describe the work within its jurisdic-
tion. Operating Engineers’ contract, however, explicitly
mentions tunneling equipment in addition to sewer and
underground work. Because Operating Engineers’ con-
tract describes its jurisdiction with greater particularity,
the collective-bargaining agreement factor weighs slight-
ly in favor of Operating Engineers.
2. Employer preference and past practice
The factor of employer preference is generally entitled
to substantial weight. See Iron Workers Local 1 (Goebel
Forming), 340 NLRB 1158, 1163 (2003). Project Man-
ager Szaraz consistently testified that it is the Employer’s
preference for Laborers to perform the three jobs in dis-
pute.4 Moreover, Laborers are currently performing this
work. Teamsters Local 259 (Globe Newspaper Co.), 327
NLRB 619, 623 (1999) (weighing employer’s stated
preference as well as employer’s assignment of work in
dispute). Szaraz also testified that, for each previous
tunnel construction project on which he has worked, La-
4 We reject Operating Engineers’ contention that the Employer’s
preference here should be treated with “skepticism” because it is not
“representative of a free and unencumbered choice.” See Longshore-
men ILWU Local 50 (Brady-Hamilton Stevedore Co.), 223 NLRB
1034, 1037 (1976), reconsideration granted and decision rescinded on
other grounds 244 NLRB 275 (1979). In Brady-Hamilton Stevedore,
the Board accorded little weight to the employer preference factor
where the employer’s preference changed after the respondent initiated
a work action. Ibid. Here, in contrast, the Employer has maintained a
consistent preference for Laborers-represented employees, even when
faced with a pay-in-lieu grievance filed by Operating Engineers.
Therefore, we shall accord this factor its customary weight. Moreover,
the other factors of skill, efficiency, and safety weigh in favor of the
Laborers.
In any event, the situation presented here is typical of a 10(k) case:
two unions’ contracts arguably cover the work in dispute, and the em-
ployer has expressed a preference for one union over the other. The
Board has the authority and the responsibility to assign disputed work
under such circumstances. Operating Engineers has provided no evi-
dence that would warrant disregarding the Employer’s stated preference
here.
728
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
borers performed tunnel construction tasks analogous to
those in dispute here. More specifically, although Oper-
ating Engineers have driven TBMs, Laborers have previ-
ously operated the components attached to them and
have used tools and techniques to install tunnel support
systems that are similar to the tools and techniques re-
quired to install the support system here.5 This factor
weighs in favor of awarding the work to Laborers.
3. Area and industry practice
Laborers Business Manager Liberatore testified that
Laborers have performed the tunnel lining work for eve-
ry construction project within Laborers’ jurisdiction, for
the Employer as well as for other contractors in the re-
gion. Employer Project Manager Szaraz also testified
that Laborers is the only union whose members have
performed tunnel lining installation on projects in the
region. There is no evidence in the record that a different
trade performed this type of work. Accordingly, this
factor weighs in favor of awarding the work in dispute to
Laborers.
4. Relative skills and training
The record shows that employees represented by La-
borers receive training at the Ohio Laborers’ Training
Center (Center) in subjects relevant to the instant project.
Indeed, Liberatore testified that the Center offers safety
courses as well as training on the subjects of soil identifi-
cation, rigging, fall protection, and confined space pro-
tection, all of which are relevant to the tunnel project
here. The Center also offers a tunneling course. Beyond
the Center, Laborers have received additional training for
the three jobs in dispute from the TBM manufacturer at
the jobsite.6 As for relative skills, there is ample evi-
dence in the record that employees represented by La-
borers regularly handle the tools required for the work in
dispute. The record evidence does not establish that em-
ployees represented by Operating Engineers have re-
ceived relevant training or that they possess the skills to
perform the work in dispute. Accordingly, this factor
favors awarding the disputed work to Laborers.
5 For instance, Laborers operated TBM components on the Westlake
Interceptor and Southwest Interceptor jobs, two tunneling projects in
the Cleveland area. On the Westlake Interceptor project, Laborers
operated the erector attached to the TBM to lift and install ribs. On the
Southwest Interceptor job, Laborers used a drill that was attached to the
TBM to install the tunnel lining. On that project, Laborers also used an
erector attached to the TBM to install steel ribs that formed the tunnel
support lining system.
6 Operating Engineers correctly notes that its members could also
participate in the TBM manufacturer’s onsite training for the work in
dispute. Operating Engineers, however, did not satisfactorily demon-
strate that employees it represents have done so.
5. Economy and efficiency of operations
The Employer and Laborers argue that assigning the
job classifications in dispute to Laborers results in great-
er efficiency of operations because Laborers-represented
employees perform other work on the jobsite that re-
quires similar skills; if Laborers-represented employees
fill the positions in dispute, these employees can assist or
fill in for other Laborers-represented employees when
downtime is experienced. See Operating Engineers Lo-
cal 825 (Walters & Lambert), 309 NLRB 142, 145
(1992) (factor of economy and efficiency of operations
favored union whose members possessed knowledge and
skills necessary to perform additional craft work when
not performing disputed work). The record supports this
argument. For instance, the SPP’s responsibilities in-
clude cleaning, hammering in dowels, and assisting in
“leapfrogging” the rail forward. Other Laborers-
represented employees working nearby perform similar
or related tasks. The RB1 and RB2 employees also per-
form tasks that other Laborers-represented employees at
the jobsite perform, such as cleaning, grouting, drilling,
and general tunnel labor. See Operating Engineers Lo-
cal 150 (Beverly Environmental), 358 NLRB 1346, 1348
(2012) (finding factor of economy and efficiency favored
union whose represented employees had already been
trained and were working on the site performing job
tasks in dispute).
There is no evidence in the record that Operating En-
gineers have experience performing these job tasks or
that the jobs Operating Engineers currently perform in-
clude these tasks. In fact, the record shows that Operat-
ing Engineers currently perform jobs that are distinct
from the other jobs and require them to be physically
removed from tunnel lining construction. For instance,
the TBM operator is more than 100 feet away from the
other workers and does not perform any cleaning or lin-
ing installation tasks. Project Manager Szaraz testified
that it is more efficient and economical for Laborers to
perform the work in dispute because assigning Operating
Engineers to these positions would require the Employer
to hire employees who could perform only one function
on the project, which would increase project costs.
There is no contrary evidence in the record.7 According-
ly, the factor of efficiency and economy favors Laborers.
7 Operating Engineers argues that assigning the work in dispute to
Laborers would not be economical because doing so would trigger
damages resulting from the breach of the Employer’s contract with
Operating Engineers. This argument is flawed because the mainte-
nance of a pay-in-lieu grievance after the Board has awarded the work
in dispute violates Sec. 8(b)(4)(ii)(D). Iron Workers Local 433 (Otis
Elevator), 309 NLRB 273, 274 (1992), enfd. 46 F.3d 1143 (9th Cir.
1995). Moreover, when analyzing economy and efficiency in a 10(k)
LABORERS’ INTERNATIONAL UNION OF NORTH AMERICA
729
Conclusions
After considering all of the relevant factors supported
by record evidence, we conclude that employees repre-
sented by Laborers are entitled to perform the work in
dispute. We reach this conclusion relying on the factors
of employer preference, past practice, area and industry
practice, relative skills and training, and economy and
efficiency of operations, all of which favor Laborers-
represented employees. Consideration of these factors
outweighs collective-bargaining agreements, the only
factor that favors Operating Engineers. In making this
dispute, the Board does not consider whether a successful grievance
would subject an employer to financial liability for breach of contract.
See Beverly Environmental, above at 1348; AMS Construction, 356
NLRB 306, 310–311.
determination, we are awarding the work to employees
represented by Laborers, not to that union or its mem-
bers. The determination is limited to the controversy that
gave rise to this proceeding.
DETERMINATION OF DISPUTE
The National Labor Relations Board makes the follow-
ing Determination of Dispute.
Employees of McNally/Kiewit ECT JV, represented
by Laborers’ International Union of North America
(AFL–CIO), Laborers Local No. 860, are entitled to per-
form the jobs of ring builder 1, ring builder 2, and seg-
ment preparation person on McNally/Kiewit’s Euclid
Creek Tunnel project in Cleveland, Ohio.