360 NLRB 903
INTERNATIONAL UNION OF OPERATING ENGINEERS LOCAL 18 AND ITS BRANCHES (DONLEYS INC)
LABORERS’ LOCAL 310 (DONLEY’S, INC.)
903
360 NLRB No. 113
International Union of Operating Engineers, Local 18
and
Donley’s, Inc. and
Hunt Construction
Group and Precision Environmental Co. and
Construction Employers Association and B&B
Wrecking and Excavating and Cleveland Ce-
ment Contractors and Laborers’ International
Union of North America, Local 310.
Laborers’ International Union of North America,
Local 310 and Donley’s, Inc. and B&B Wrecking
and Excavating, Inc. and Cleveland Cement
Contractors, Inc. and Hunt Construction Group
and Precision Environmental Co. and Construc-
tion Employers Association and International
Union of Operating Engineers, Local 18. Cases
08–CD–091637, 08–CD–091683, 08–CD–091684,
08–CD–091686, 08–CD–091770, 08–CD–091773,
08–CD–091643, 08–CD–091677, 08–CD–091678,
08–CD–091682, 08–CD–091687, and 08–CD–
091689
May 15, 2014
DECISION AND DETERMINATION OF DISPUTE
BY CHAIRMAN PEARCE AND MEMBERS MISCIMARRA
AND JOHNSON
This is a consolidated jurisdictional dispute proceeding
under Section 10(k) of the National Labor Relations Act,
as amended, following the filing of charges in Cases 08–
CD–091637 and 08–CD–091643 on October 18, 2012 by
Donley’s, Inc. (Donley’s).1 Additional charges were
filed on October 19 in Cases 08–CD–091677 and 08–
CD–091770 by B&B Wrecking and Excavating, Inc.
(B&B Wrecking or B&B); in Cases 08–CD–091678 and
08–CD–091773 by Cleveland Cement Contractors, Inc.
(Cleveland Cement); in Cases 08–CD–091682 and 08–
CD–091683 by Hunt Construction Group (Hunt); in Cas-
es 08–CD–091684 and 08–CD–091687 by Precision
Environmental Co. (Precision); and in Cases 08–CD–
091686 and 08–CD–091689 by Construction Employers
Association (CEA).2 The Employers alleged that the
International Union of Operating Engineers, Local 18
(Operating Engineers) and Laborers’ International Union
of North America, Local 310 (Laborers) violated Section
8(b)(4)(D) of the Act by engaging in proscribed activity
with an object of forcing or requiring the respective Em-
ployers to assign certain work to employees represented
by Operating Engineers rather than to employees repre-
sented by Laborers. An order consolidating cases and
1 All dates are in 2012, unless otherwise indicated.
2 Donley’s, B&B Wrecking, Cleveland Cement, Hunt, and Precision
will be referred to as “the Employers.” The CEA will be referred to
separately.
notice of hearing subsequently issued and a hearing was
held on February 25–28, 2013, before Hearing Officer
Roberta A. Montgomery.3 Thereafter, CEA, on behalf of
the Employers, filed a posthearing brief, as did Operating
Engineers.4 Operating Engineers also filed a motion to
quash the notice of hearing, which was deferred by the
hearing officer to the Board for resolution.5
The National Labor Relations Board has delegated its
authority in this proceeding to a three-member panel.
The Board affirms the hearing officer’s rulings, find-
ing them free from prejudicial error. On the entire rec-
ord, we make the following findings.
I. JURISDICTION
The parties stipulated that in the 12-month period prior
to the hearing, Employers Donley’s, B&B Wrecking,
Cleveland Cement, Hunt, and Precision each purchased
3 In a recent case, Operating Engineers Local 18 (Donley’s Inc.),
360 NLRB 104 (2014) (Donley’s I), the Board found reasonable cause
to believe that Operating Engineers violated Sec. 8(b)(4)(D) with re-
spect to a dispute with Donley’s at a Goodyear construction project in
Akron, Ohio, concerning the same work in dispute, and at another
project in Cleveland regarding forklift work. The Employers and CEA
moved at the hearing to incorporate the record from Donley’s I. In light
of our disposition of all issues here based on the record in this case and
taking official notice of the prior decision in Donley’s I, we find no
need to pass on this motion.
4 Laborers presented oral argument at the conclusion of the hearing
in lieu of a brief.
5 Operating Engineers contends, among other arguments in its mo-
tion, that the notice of hearing should be quashed because it does not
factually track the underlying unfair labor practice allegations, as re-
quired under Nickles Bakery of Indiana, 296 NLRB 927 (1989), and its
progeny. Specifically, Operating Engineers asserts that unlike the
notice of hearing, which identifies the work in dispute and the locations
where the alleged Sec. 8(b)(4)(D) conduct occurred, the charges con-
tained only general “boilerplate” allegations and were “utterly lacking
in factual specificity.” Because the notice of hearing “exceeds the
scope of the charged allegations,” Operating Engineers contends that
the Regional Director acted without jurisdiction under Sec. 10(b) by
originating a complaint upon his own initiative and that under Nickles
Bakery the notice should be quashed.
Operating Engineers’ reliance on Nickles Bakery is misplaced. That
case held that the “boilerplate” statutory language of Sec. 8(a)(1) that is
preprinted on a Sec. 8(a) charge form cannot, on its own, support a
particularized 8(a)(1) complaint allegation because it would “contra-
vene[] 10(b)’s mandate that the Board ‘not originate complaints on its
own initiative.’” 296 NLRB at 928 (quoting G. W. Galloway Co. v.
NLRB, 856 F.2d 275, 280 (D.C. Cir. 1988) (emphasis added)). Howev-
er, a notice of hearing in a 10(k) proceeding to determine whether there
is reasonable cause to believe that Sec. 8(b)(4)(D) has been violated is
not, as Operating Engineers describes it, a “complaint,” and, according-
ly, the holding of Nickles Bakery has not been extended to 10(k) cases.
However, even if Nickles Bakery applied, a sufficiently close factual
nexus exists between the charges and the notice of hearing. See Bay
Counties Carpenters, 265 NLRB 646, 647–648 (1982) (rejecting argu-
ment that notice of hearing improperly exceeded the scope of the
charges by including jobsites not specified in charges). Accordingly,
we deny Operating Engineers’ motion to quash the notice of hearing on
this basis.
904
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
and received materials valued in excess of $50,000 di-
rectly from points outside the State of Ohio. The parties
further stipulated, and we find, that the Employers are
engaged in commerce within the meaning of Section 2(6)
and (7) of the Act and that Laborers and Operating Engi-
neers are labor organizations within the meaning of Sec-
tion 2(5) of the Act.
CEA is a multiemployer bargaining association that
represents construction industry employers in negotiating
and administering collective-bargaining agreements with
various labor organizations. Donley’s, B&B Wrecking,
Cleveland Cement, Hunt, and Precision have assigned
their bargaining rights to CEA and, through CEA, are
signatories to separate contracts negotiated by CEA with
Laborers and Operating Engineers. As the Employers
have delegated bargaining authority to CEA, and each
Employer satisfies the applicable jurisdictional standard,
we find that CEA is an employer within the meaning of
Section 2(2) of the Act.6
II. THE DISPUTE
A. Background and Facts of the Dispute
The Employers have employed employees represented
by both Laborers and Operating Engineers for many
years and have been signatories to a series of successive
collective-bargaining agreements negotiated by CEA
with both Unions. The most recent of these contracts are
effective from May 1, 2012, through April 30, 2015.
Both contracts cover construction work performed in
Cuyahoga County in northeastern Ohio, including the
city of Cleveland, where the jobsites at issue in this case
are located.
The Employers utilize various kinds of equipment on
their construction projects, including forklifts and small
front-end loaders known as skid steers. Representatives
of Employers B&B Wrecking, Cleveland Cement, and
Precision testified that their practice for over 20 years has
been to assign the operation of this equipment to em-
ployees represented by Laborers, and the same practice at
Donley’s has existed for 15 years.7 CEA Executive Vice
President Tim Linville testified that Operating Engineers
sought to change this practice in April 2012, during ne-
gotiations for a contract to succeed the CEA-Operating
Engineers contract that was due to expire on April 30.
6 Operating Engineers argues that because CEA does not directly
employ any employees at issue in this 10(k) proceeding, it is not a 2(2)
employer. The Board rejected this argument in Oregon Coast Opera-
tors Assn., 113 NLRB 1338, 1340 fn. 4 (1955), and we do so here. See
also Broward County Launderers & Cleaners Assn., Inc., 125 NLRB
256, 256 (1959).
7 Employer Hunt’s representative did not address the duration of
Hunt’s assignment practice in his testimony.
According to Linville, Operating Engineers’ chief nego-
tiator, Pat Sink, stated that Operating Engineers was pre-
pared to strike over the continued assignment of forklift
and skid steer work to employees it did not represent.
CEA bargaining committee member Victor DiGeronimo
testified that Sink made the same statement to him during
the 2012 contract negotiations.
Sink submitted a contract proposal during the negotia-
tions that would have required the Employers to pay
“liquidated damages” in the amount of four times the
hourly wage of employees represented by Operating En-
gineers, if forklift and skid steer work was assigned to
other employees. Linville testified that in presenting this
proposal, Sink explained that “for far too long” the Em-
ployers had wrongfully been assigning forklift and skid
steer work to employees other than those whom Operat-
ing Engineers represented, and his liquidated damages
proposal was “intended to stop that.”8
The successor 2012–2015 contract between CEA and
Operating Engineers required ratification by both parties.
After CEA ratified it in early May, Linville received a
letter from Sink stating that Operating Engineers could
not vote on ratification without first reviewing the 2012–
2015 successor contract recently negotiated between
CEA and Laborers. The letter further requested confir-
mation of whether that contract specifically “classifies
and assigns certain construction equipment to Laborers.”
Linville confirmed in a responsive letter and phone call
to Sink that, consistent with “current and past practice,”
the new CEA-Laborers contract classifies the operation
of forklifts and skid steers as the work of Laborers-
represented employees. Linville informed Sink in his
letter that he was aware that Operating Engineers had
“initiated several jurisdictional proceedings regarding
these issues this year.” Sink replied that the assignment
of this equipment to Laborers-represented employees
“might affect our willingness to ratify” the CEA-
Operating Engineers contract. Ultimately, Operating
Engineers ratified the contract.
Among the other jurisdictional proceedings initiated
by Operating Engineers that Linville referred to in his
letter to Sink was the dispute in Donley’s I involving
Donley’s construction project at a Goodyear facility in
Akron, Ohio. That project, located outside the geograph-
ic scope of the CEA-Operating Engineers agreement,
was covered by a contract between the Associated Gen-
eral Contractors (AGC) and Operating Engineers, to
which Donley’s was signatory. At a prejob conference
concerning the Goodyear project, Donley’s project super-
intendent Greg Przepiora told Operating Engineers’ rep-
8 Sink did not testify in this proceeding.
LABORER’S LOCAL 310 (DONLEY’S, INC.)
905
resentative David Russell that Laborers-represented em-
ployees would operate the forklifts and skid steers, and
Russell noted his disagreement with this assignment on a
prejob conference form.
Russell later appeared at the Goodyear jobsite in early
February and, according to Przepiora, told him that Op-
erating Engineers wanted the forklift and skid steer work
that it “gave away a long time ago” and that he would
shut down the jobsite if Donley’s did not acquiesce. Af-
ter Donley’s refused to reassign the work, Operating En-
gineers engaged in a 1-day strike on February 22 and
filed a grievance alleging that Donley’s violated the
AGC-Operating Engineers contract by failing to “employ
Operating Engineers on its forklifts and skid steers” at
the Goodyear project. Two meetings followed in an at-
tempt to resolve the grievance. Donley’s official Mike
Dilley testified that Sink stated at the first meeting in
early April that the February 22 strike was a “move[] that
the Union should have made a long time ago.” Dilley
further testified that Operating Engineers’ representative
Mark Tottman stated at the second meeting on April 20
that when the CEA-Operating Engineers contract expired
on April 30, Donley’s “would be sorry that [it] was not
putting Operators on the forklifts” and that it “would be
sorry that [it] would not have Operators come the end of
the month.”
After the ratification of successor 2012–2015 contracts
between CEA and Laborers and CEA and Operating En-
gineers, the Employers began work on various construc-
tion projects in the Cleveland area. They utilized fork-
lifts and/or skid steers at each project and assigned the
operation of this equipment to employees represented by
Laborers. Operating Engineers filed “pay-in-lieu” griev-
ances against each Employer alleging that the failure to
assign the work to employees it represented violated the
CEA-Operating Engineers contract. Each grievance
sought, as a penalty for the alleged contract breach, the
payment of wages and fringe benefits for each day
worked on forklift and/or skid steer equipment by em-
ployees not represented by Operating Engineers.
In addition to filing grievances, Operating Engineers’
representative Russell made oral claims for the forklift
and/or skid steer work in discussions with some Employ-
er officials. Brian Baumann, president of B&B Wreck-
ing, testified that after Operating Engineers filed a June 5
grievance over B&B’s assignment of forklift work to its
Laborers-represented
employees
at
the
Cleveland
Browns stadium project, Russell stated during a visit to
the jobsite that the operation of forklifts fell within Oper-
ating Engineers’ jurisdiction and that Baumann should
reassign the forklift work to the employees represented
by that Union. Jim Simonetti, field superintendent for
Cleveland Cement, and Tony DiGeronimo, president of
Precision, testified that they had similar discussions with
Russell. Simonetti testified that prior to the filing of
grievances about Cleveland Cement’s projects at the
Metro Health Medical Center and Tri-C Metro Campus,
Russell advised him that employees represented by Op-
erating Engineers should run the forklifts and skid steers
at both sites. Simonetti refused, as did DiGeronimo
when Russell made a demand for the assignment of fork-
lift and/or skid steer work during a prejob conference
prior to commencement of work at Precision’s Hannah
Annex jobsite. Simonetti testified that Russell stated
further that Operating Engineers’ claims for this work
“were going to continue . . . until they got operators to
run the equipment.”
In a letter dated October 11, the CEA’s Linville noti-
fied Laborers’ business manager Terence Joyce that
“Operating Engineers Local 18 has launched an area-
wide campaign to claim forklift and skid steer work from
the Laborers” by filing grievances against B&B Wreck-
ing, Cleveland Cement, Hunt, and Precision.9 Linville
advised Joyce that as a result of the grievances, it may
become necessary to reassign the forklifts and skid steers
work to employees represented by Operating Engineers.
Joyce responded by letter on October 16 that
members of Laborers’ Local 310 have traditionally and
consistently operated skid-steers and forklifts for the
signatory employers referenced in your letter. Skid-
steers and forklifts are tools of trade, operated by labor-
ers to perform laborers’ duties. You are advised that
Local 310 adamantly objects to any assignment of its
members’ work to Local 18. In the event any of your
member-contractors, including those referenced in your
letter, assign the operation of skid-steers or forklifts to
members of Local 18, Local 310 will picket and strike
any and all projects where such assignments take place.
B. Work in Dispute
We find, based on the record and as set forth in the or-
der consolidating cases and notice of hearing, that the
work in dispute is the operation of forklifts and skid
steers as part of construction projects at Case Western
Reserve University (Donley’s), Cleveland Browns Stadi-
um (B&B Wrecking), a Tri-C Metro Campus parking lot
(Cleveland Cement), Cleveland Hopkins Airport (Hunt
Construction), and the Hanna Annex Building (Preci-
sion), all located in Cleveland, Ohio.
9 Donley’s was not named because the first of several grievances
had not yet been filed against it.
906
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
C. Contentions of the Parties
CEA, the Employers, and Laborers contend that there
is reasonable cause to believe that Section 8(b)(4)(D) has
been violated based on threats made by Operating Engi-
neers to strike, and by Laborers to picket and strike, over
the assignment of forklift and skid steer work. They fur-
ther contend that there are competing claims for the dis-
puted work and that the work should be awarded to em-
ployees represented by Laborers based on employer pref-
erence and past practice, area and industry practice, and
economy and efficiency of operations. Finally, they con-
tend that a broad areawide award is warranted, coincid-
ing with the territorial jurisdiction of Operating Engi-
neers, because it is likely that disputes over the assign-
ment of forklift and skid steer work will arise on future
projects.
Operating Engineers contends that the notice of hear-
ing should be quashed because it has not claimed the
work in dispute. Rather, it contends that it has pursued
only contractual grievances against the Employers, seek-
ing economic damages for breaches of the work jurisdic-
tion provisions of the CEA-Operating Engineers con-
tract. As such, Operating Engineers argues that the dis-
pute here is one of contractual work preservation rather
than a dispute cognizable under Section 10(k). Further,
Operating Engineers argues that its threats to strike were
“purely representational” with no 10(k) jurisdictional
objective, and that Laborers’ threats to picket and strike
if the disputed work were not assigned to the employees
it represents were a “sham” orchestrated by CEA’s Lin-
ville to manufacture a 10(k) jurisdictional dispute. Al-
ternatively, if the notice of hearing is not quashed and the
Board determines that a jurisdictional dispute exists, Op-
erating Engineers argues that the disputed work should
be awarded to employees it represents based on the fac-
tors of collective-bargaining agreements, area and indus-
try practice, economy and efficiency of operations, and
relative skills and training.
D. Applicability of the Statute
The Board may proceed with determining a dispute
pursuant to Section 10(k) of the Act only if there is rea-
sonable cause to believe that Section 8(b)(4)(D) has been
violated. Operating Engineers Local 150 (R&D Thiel),
345 NLRB 1137, 1139 (2005). This standard is met if
there is reasonable cause to believe that there are compet-
ing claims for the disputed work between rival groups of
employees, and a party has used proscribed means to
enforce its claim to the work in dispute. Additionally,
there must be a finding that the parties have not agreed
on a method of voluntary adjustment of the dispute. On
this record, we find that this standard has been met.
1. Competing claims for work
We find reasonable cause to believe that both Unions
have claimed the work in dispute for the employees they
respectively represent. Laborers has claimed the work by
its October 16 letter from Local business manager Joyce
to CEA’s Linville, objecting to any assignment of the
forklift or skid steer work to Operating Engineers-
represented employees. Even absent this specific claim,
the performance of the disputed work by Laborers-
represented employees at all of the projects here consti-
tutes evidence of a claim for the work. Seafarers District
NMU (Luedtke Engineering Co.), 355 NLRB 301, 303
(2010).
Despite its argument to the contrary, Operating Engi-
neers has also claimed the disputed work. As recounted
above, Russell made explicit oral demands for forklift
and/or skid steer work in meetings with Donley’s Project
Superintendent Przepiora at the Goodyear project, with
B&B Wrecking President Baumann at the Cleveland
Browns Stadium project, with Precision President
DiGeronimo at the Hannah Annex project, and with
Cleveland Cement Field Superintendent Simonetti at its
project at the Tri-C Metro Campus. Operating Engi-
neers’ claim for the forklift and skid steer work is also
demonstrated by Chief Negotiator Sink’s “liquidated
damages” contract proposal during bargaining for a
2012–2015 successor contract with CEA. As Linville
testified, Sink explained that the proposal was designed
to stop employers from assigning forklift and skid steer
work to employees other than those represented by Oper-
ating Engineers. Finally, Operating Engineers has filed
pay-in-lieu grievances against each of the Employers
alleging contract violations with respect to their assign-
ment of forklift and/or skid steer work to employees rep-
resented by Laborers. The Board has long held that pay-
in-lieu grievances alleging contractual breaches in the
assignment of work constitute demands for the disputed
work. Laborers Local 265 (AMS Construction), 356
NLRB 306, 308 (2010), and cases cited therein; Laborers
(Esbach Bros.), 344 NLRB 201, 202 (2005) (same).
We find no merit in Operating Engineers’ contention
that the instant proceeding involves a contractual dispute
over the preservation of bargaining-unit work for em-
ployees it represents, rather than a jurisdictional work
dispute within the scope of Section 10(k). It is well es-
tablished that to prevail in its work preservation claim,
Operating Engineers must show that the employees it
represents have previously performed the work in dispute
and that it is not attempting to expand its work jurisdic-
tion. Chicago & Northeast Illinois District Council of
Carpenters (Prate Installations, Inc.), 341 NLRB 543,
544 (2004); Stage Employees IATSE Local 39 (Shepard
LABORER’S LOCAL 310 (DONLEY’S, INC.)
907
Exposition Services), 337 NLRB 721, 723 (2002). If the
evidence shows that the work in dispute has not previ-
ously been performed by employees represented by Op-
erating Engineers, its “objective is not work preservation,
but work acquisition,” which the Board must resolve in a
10(k) proceeding. Electrical Workers Local 48 (Kinder
Morgan Terminals), 357 NLRB 2217, 2219 (2011), and
cases cited.
The record shows here that the Laborers-represented
employees were performing the forklift and skid steer
work at all of the Employers’ construction projects.
Witnesses for Employers Donley’s, B&B, Cleveland
Cement, and Precision testified that this work has always
been assigned to employees represented by Laborers
during their 15 to 26 years of employment and not to
employees represented by Operating Engineers. Sink
and Russell essentially conceded this point. Sink la-
mented during bargaining negotiations in 2012 that “for
far too long” this work has been done by Laborers-
represented employees, and Russell acknowledged dur-
ing his meeting with Przepiora at Donley’s Goodyear
project that Operating Engineers “gave away” the forklift
and skid steer work “a long time ago.”
We find no merit in Operating Engineers’ attempt to
establish its work preservation claim by citing “over
3600 work orders [since 2009] from signatory contrac-
tors for the referral of an [Operating Engineer] member
capable of operating skid steers and forklifts.” There is
no indication whether any of these referrals were to the
Employers here or any other employer represented by
CEA. Further, as Operating Engineers’ Local president,
Dalton, acknowledged, the referral of employees “capa-
ble” of operating a forklift or skid steer is not proof that
the dispatched individuals performed work on that
equipment during their time on the project. Operating
Engineers also relies on Russell’s testimony that during
his visits to jobsites since 2009, he has “witnessed” four
Operating Engineers-represented employees operating a
forklift or a skid steer while employed by B&B Wreck-
ing, Cleveland Cement, or Precision. There is no evi-
dence, however, that the four were assigned by any of
the Employers to operate the equipment, and even as-
suming that they were, such “isolated assignments . . .
provides [Operating Engineers] no basis to raise a valid
work preservation claim regarding the disputed work.”
Stage Employees IATSE Local 39, supra at 723.
Because the record shows that operating forklifts and
skid steers is not work that has traditionally been per-
formed by employees represented by Operating Engi-
neers, we conclude that its claim for this work was not
one of work preservation, but rather work acquisition,
and the Board will resolve the dispute through this 10(k)
proceeding.
2. Use of proscribed means
We also find reasonable cause to believe that Operat-
ing Engineers and Laborers used or threatened to use
means proscribed by Section 8(b)(4)(D) to enforce their
competing claims for the work in dispute. Operating
Engineers Chief Negotiator Sink stated during negotia-
tions for a successor 2012–2015 CEA-Operating Engi-
neers contract that Operating Engineers was prepared to
strike if the Employers continued to assign forklift and
skid steer work to employees represented by Laborers.
Representative Tottman similarly stated, in a grievance
meeting with Donley’s representatives, that when the
contract expired in 2 weeks, Donley’s “would be sorry
. . . [for] not putting Operators on the forklifts” and that
it “would be sorry that [it] would not have Operators.”
These statements constitute threats to strike over the dis-
puted assignments of forklift and skid steer work, and
such threats are a proscribed means of enforcing claims
to disputed work. Operating Engineers Local 150 (Pat-
ten Industries), 348 NLRB 672, 674 (2006).10 Laborers
engaged in similar proscribed conduct by advising CEA
Executive Vice President Linville in its October 16 letter
that Laborers would “picket and strike any and all pro-
jects” if the forklift and skid steer work were assigned to
employees other than those represented by the Laborers.
We find no merit in the Operating Engineers’ conten-
tion that Laborers’ threat to picket and strike was a sham
and the product of collusion among CEA, the Employers,
and Laborers, who “all conspired in an effort to invoke
Section 10(k)” and avoid Operating Engineers’ contrac-
tual right under its agreement with CEA for Operating
Engineers-represented employees to perform the disput-
ed work. The Board has consistently rejected this argu-
ment “[i]n the absence of affirmative evidence that a
threat to take proscribed action was a sham or was the
product of collusion,” and Operating Engineers has pre-
sented no such evidence here. Operating Engineers Lo-
cal 150 (R&D Thiel), supra, 345 NLRB at 1140; Plumb-
ers Local 562 (Grossman Contracting), 329 NLRB 516,
520 (1999). It offered no direct evidence that Laborers’
threat to “picket and strike” over the assignment of the
disputed work was not genuine or that Laborers colluded
with CEA and the Employers. Further, even assuming
that there was evidence supporting this contention, Oper-
10 Even assuming, as Operating Engineers argues, that its threats to
strike also had a lawful representational objective of urging agreement
on a successor contract, we find reasonable cause to believe that Oper-
ating Engineers violated Sec. 8(b)(4)(D) because an object of its strike
threats is prohibited. See Carpenters (Prate Installations, Inc.), supra,
341 NLRB at 545.
908
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
ating Engineers’ threats to strike are sufficient alone to
establish the requisite element of proscribed means to
enforce a claim to the disputed work.
In sum, we find that the record evidence provides rea-
sonable cause to believe that Section 8(b)(4)(D) has been
violated. Operating Engineers has claimed the work in
dispute, which is being performed by Laborers-
represented employees, and both Operating Engineers
and Laborers have used proscribed means to enforce
their claims by threatening to strike and/or picket to re-
tain or obtain the disputed work. In addition, as the par-
ties stipulated, there is no method for voluntary adjust-
ment of the dispute to which all parties are bound. Thus,
we find that all three prerequisites for the Board’s deter-
mination of a jurisdictional dispute are established. Ac-
cordingly, we deny Operating Engineers’ motion to
quash the notice of hearing and find that the dispute is
properly before the Board for resolution.
E. Merits of the Dispute
Section 10(k) requires the Board to make an affirma-
tive award of disputed work after considering various
factors. NLRB v. Electrical Workers Local 1212 (Co-
lumbia Broadcasting), 364 U.S. 573, 577–579 (1961).
The Board’s determination in a jurisdictional dispute is
“an act of judgment based on common sense and experi-
ence,” reached by balancing the factors involved in a
particular case. Machinists Lodge 1743 (J. A. Jones
Construction), 135 NLRB 1402, 1410–1411 (1962).
The following factors are relevant in making the de-
termination of this dispute.
1. Certifications and collective-bargaining agreements
The work in dispute is not covered by any Board or-
ders or certifications.
Article 1, section 7 of the current collective-bargaining
agreement between CEA and Laborers specifies numer-
ous types of work within the jurisdiction of Laborers.
Each provision states:
The operation of forklifts, . . . [and] skid-steer loaders,
. . . when used in the performance of the aforemen-
tioned jurisdiction shall be the work of the laborer [or
laborers].
The current collective-bargaining agreement between
the CEA and Operating Engineers states:
In accordance with the terms of this Agreement, the
Employer shall employ Operating Engineers for the
erection, operation, assembly and disassembly, and
maintenance and repair of the following construction
equipment regardless of motive power: . . . Forklifts,
Skid steers . . . .
We find that the language in each contract covers the
work in dispute. Therefore, the factor of collective-
bargaining agreements does not favor an award to either
group of employees. Laborers Local 1184 (High Light
Electric), 355 NLRB 167, 169 (2010).
2. Employer preference and past practice
As noted above, the Employers’ representatives testi-
fied that they have assigned the disputed work to their
Laborers-represented employees for at least the past 15
years in the case of Donley’s, and for over 20 years in
the case of Precision, Cleveland Cement, and B&B
Wrecking. During these periods, the representatives tes-
tified that they never assigned the disputed work to em-
ployees represented by Operating Engineers. Represent-
atives of all five Employers testified that, consistent with
their past and current practice, they prefer to continue
assigning the disputed forklift and skid steer work to
employees represented by Laborers. We find, therefore,
that the factor of employer preference and past practice
weighs in favor of awarding the work to employees rep-
resented by Laborers.11
3. Area and industry practice
Ed Deaton, a field representative for the Laborers Dis-
trict Council of Ohio whose duties since 2004 included
attending prejob conferences at projects throughout the
State, testified that contractors assigned forklift and skid
steer work to Laborers-represented employees. Joyce
testified that as a field representative of Laborers from
1995 to October 2011 and as Business Manager since
then, he monitored construction projects in the three
counties encompassing Laborers’ jurisdiction to ensure
employer compliance with bargaining contracts. He tes-
tified that the employees represented by Laborers operat-
ed the forklifts and skid steers on these jobs.
Operating Engineers argues that area practice supports
its claim, as shown by the 3600 work orders from signa-
tory contractors for the referral of a Local 18 member
capable of operating skid steers and forklifts. However,
as discussed above in rejecting this argument as support
for its work preservation claim, there is no evidence that
11 We reject Operating Engineers’ contention that the Employers’
preference should be treated with skepticism because it is not “repre-
sentative of a free and unencumbered choice,” citing Longshoremen
ILWU Local 50 (Brady-Hamilton Stevedore Co.), 223 NLRB 1034,
1037 (1976), reconsideration granted and decision rescinded on other
grounds 244 NLRB 275 (1979). There, the Board accorded little
weight to the employer preference factor because that preference
changed after the charged union initiated a work action. Id. Here, in
contrast, the Employers have maintained a consistent preference for
Laborers-represented employees, even when faced with pay-in-lieu
grievances by Operating Engineers. Therefore, we accord this factor its
customary weight.
LABORER’S LOCAL 310 (DONLEY’S, INC.)
909
Operating Engineers-represented employees actually
performed the disputed work on the jobs to which they
were referred.
We find based on the foregoing evidence that the fac-
tor of area and industry practice favors an award of fork-
lift and skid steer work to employees represented by La-
borers.
4. Relative skills and training
Both Unions introduced evidence showing that they
provide training in the operation of forklifts and skid
steers at their training facilities and that the employees
they represent are certified to operate this equipment.
Several representatives of the Employers also testified
that they verify that their Laborers-represented employ-
ees have been trained to operate the forklifts and skid
steers on their projects. We conclude that the factor of
relative skills and training is neutral and does not favor
an award of the disputed work to either group of employ-
ees.
5. Economy and efficiency of operations
Representatives of the Employers testified that it is
more efficient and economical to assign the operation of
forklifts and skid steers to employees represented by La-
borers because these employees perform multiple tasks
in addition to the disputed work. The disputed work
constitutes only a portion of the tasks they perform on a
daily basis, with the majority of their time spent perform-
ing other duties that Operating Engineers-represented
employees do not perform. Consequently, the Employ-
ers’ representatives explained that they would incur addi-
tional costs if they hired employees represented by Oper-
ating Engineers to occasionally perform the work in dis-
pute while also retaining employees represented by La-
borers to perform other work within Laborers’ jurisdic-
tion. In these circumstances, the Board has found that
the factor of economy and efficiency of operations favors
awarding the disputed work to the more versatile em-
ployees––here, the employees represented by Laborers.
Luedtke Engineering, supra, 355 NLRB at 305; R&D
Thiel, supra, 345 NLRB at 1141; Esbach Brothers, supra,
344 NLRB at 204. In sum, the factor of economy and
efficiency of operations favors the award of the disputed
work to the Laborers-represented employees.12
12 Operating Engineers argues that assigning the work in dispute to
employees represented by Laborers would not be economical because
doing so would subject the Employers to damages resulting from their
breach of the pay-in-lieu provisions in the CEA-Operating Engineers
contract. We reject this argument because the maintenance of pay-in-
lieu grievances after the Board has awarded the work in dispute violates
Sec. 8(b)(4)(ii)(D). Iron Workers Local 433 (Otis Elevator), 309
NLRB 273, 274 (1992), enfd. 46 F.3d 1143 (9th Cir. 1995).
Conclusion
After considering all of the relevant factors, we con-
clude that the employees represented by Laborers are
entitled to perform the work in dispute. We reach this
conclusion based on the factors of employer preference
and past practice, area and industry practice, and econo-
my and efficiency of operations. In making this determi-
nation, we award the work to employees represented by
Laborers, not to that labor organization or to its mem-
bers.
Scope of Award
The CEA, Employers and Laborers seek a broad area-
wide award of the disputed work “covering the geo-
graphic jurisdiction of Operating Engineers Local 18,”
arguing that the dispute here is likely to recur and that
Operating Engineers has shown a proclivity to violate
Section 8(b)(4)(D).
In determining the appropriateness of such an award,
the Board requires evidence that (1) the disputed work
has been a continuous source of controversy in the rele-
vant geographic area and that similar disputes may recur;
and (2) there is a proclivity by the offending union to
engage in further proscribed conduct to obtain the dis-
puted work.13 We find that both requirements are satis-
fied here, and that a broad award is warranted.
The evidence demonstrates the disputed forklift and
skid steer work has been and will likely continue to be
controversial, as the Employers intend to continue as-
signing the disputed work to employees represented by
Laborers, and Operating Engineers has stated its intent to
demand that the work be assigned to employees it repre-
sents. Operating Engineers’ representative Russell in-
formed the president of Precision that his Union’s de-
mands for the forklift and skid steer work “were going to
continue . . . until they got operators to run the equip-
ment,” and Union President Dalton testified that his Un-
ion would continue to file pay-in-lieu grievances for the
disputed work on future projects. We conclude from
these clearly expressed intentions that the dispute here is
likely to recur on other jobsites within Operating Engi-
neers’ geographical jurisdiction.
We also find that the evidence similarly demonstrates
a proclivity by Operating Engineers to engage in further
conduct proscribed by Section 8(b)(4)(D) in order to ob-
tain the disputed work.
To establish this requirement, the Board has relied on
evidence of a previous 10(k) determination by the Board
that the charged union is not entitled to attempt to obtain
13 See, e.g., Electrical Workers Local 98 (Total Cabling Specialists),
337 NLRB 1275, 1277 (2002); Bricklayers (Sesco, Inc.), 303 NLRB
401, 403 (1991).
910
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
comparable work through proscribed means. Compare
Electrical Workers Local 3 (Slattery Slanska, Inc.), 342
NLRB 173, 174 (2004) (broad award denied in absence
of prior Board determination against offending union),
and Glaziers District Council 16 (Service West), 356
NLRB 760, 764 (2011) (Service West I) (same), with
Electrical Workers Local 98 (Total Cabling Specialists),
supra, 337 NLRB at 1277–1278 (broad award given
based on prior Board determination against offending
union), and Electrical Workers Local 103 (Comm-Tract
Corp), 307 NLRB 384, 387 (1992) (same).
Where the Board has issued a prior 10(k) determina-
tion, the Board has further required, in some cases, that
the conduct considered by the Board in the second case
must have occurred after the issuance of the determina-
tion in the first case in order to demonstrate proclivity.
See Glaziers District Council 16 (Service West), 357
NLRB 560, 562 (2011) (Service West II). In other cases,
however, the Board has found that the conduct in a par-
ticular case itself supports a finding of proclivity even
absent evidence of unlawful conduct subsequent to an
extant 10(k) award.14
Here, we find that an areawide order is warranted
based on the record as a whole, notwithstanding that the
Operating Engineers’ proscribed conduct occurred before
Donley’s I issued. The present case involves disputes
over work performed by five different employers at five
separate jobsites over an almost 1-year period. In addi-
tion, this widespread and persistent conduct was coupled
with Operating Engineers’ threats encompassing not only
these specific sites but directed at all jobs covered by the
multiemployer CEA contract where forklifts and skid
steers are used. This evidence establishes that Operating
Engineers has shown a proclivity to use proscribed
means in the future to obtain the same or similar work,
and that a broad award is therefore warranted. Sheet
Metal Workers, Local 19 (E. P. Donnelly), supra.
Because the two prerequisites for a broad order have
been satisfied, we find that a broad areawide award, co-
14 See, e.g., Sheet Metal Workers, Local 19 (E. P. Donnelly), 345
NLRB 960, 965 (2005) (granting broad order despite no prior award
based on picketing at 4 jobsites in approximately 4 months, with evi-
dence of additional pressure on other contractors); Electrical Workers
Local 103 (Lucent Technologies), 333 NLRB 828, 831–832 (2001)
(same based on incidents at three separate locations of three different
customers over a 1-month period).
extensive with the Employers’ operations where the two
unions’ jurisdictions overlap, is appropriate.15
DETERMINATION OF DISPUTE
The National Labor Relations Board makes the follow-
ing Determination of Dispute.
1. Employees of Donley’s Inc., B&B Wrecking and
Excavating, Inc., Cleveland Cement Contractors, Inc.,
Hunt Construction Group, and Precision Environmental
Co., who are represented by Laborers International Un-
ion of North America, Local 310 are entitled to perform
work utilizing forklifts and skid steers in the area where
their employers operate and the jurisdiction of Laborers
International Union of North America, Local 310 and
International Union of Operating Engineers, Local 18
overlap.
2. International Union of Operating Engineers, Local
18 is not entitled by means proscribed by Section
8(b)(4)(D) of the Act to force the Employers named
above to assign the disputed work to employees that it
represents.
3. Within 14 days from this date, International Union
of Operating Engineers, Local 18 shall notify the Re-
gional Director for Region 8 in writing whether it will
refrain from forcing the Employers named above, by
means proscribed by Section 8(b)(4)(D), to assign the
disputed work in a manner inconsistent with this deter-
mination.
15 Contrary to his colleagues, Chairman Pearce would apply Service
West II and deny an areawide award, because he finds that the proclivi-
ty requirements mandated by that case have not been met. In Service
West II, the Board held that there are two requirements for establishing
a union’s proclivity to engage in further conduct proscribed by Sec.
8(b)(4)(D): (1) a prior 10(k) award prohibiting the union from attempt-
ing to obtain comparable disputed work by proscribed means, and (2)
subsequent unlawful attempts by the union to obtain comparable work
after the 10(k) award issued.
Here, although the first proclivity requirement has been satisfied, the
second has not been met. The alleged proscribed conduct in this case
occurred after the conduct in Donley’s I but before the issuance of the
Board’s determination that the forklift and skid steer work at issue there
and in this case was properly assigned to employees represented by
Laborers. Thus, at the time it engaged in the conduct here, Operating
Engineers was not on notice that the employees it represented were not
entitled to the work in dispute. Absent that notice, Chairman Pearce
would limit the scope of the award in this case to the particular contro-
versies that gave rise to the dispute.