32 C.F.R. § 989.18

Scoping.

SupersededYear: 1997Length: 153 wordsOfficial source

Cite as 32 C.F.R. § 989.18 (1997 ed.)

After publication of the NOI for an EIS, the EPF must initiate the public scoping process (40 CFR 1501.7) to determine the scope of issues to be addressed and to help identify significant environmental issues to be analyzed in depth. Methods of scoping range from soliciting written comments to conducting public scoping meetings (see 40 CFR 1501.7 and 1506.6(e)). The purpose of this process is to de-emphasize insignificant issues and focus the scope of the environmental analysis on significant issues (40 CFR 1500.4(g)). The result of scoping is that the proponent and EPF determine the range of actions, alternatives, and impacts to be considered in the EIS (40 CFR 1508.25). The EPF must send meeting plans for scoping meetings to AF/CEV (or ANGRC/CEV) for SAF/MIQ concurrence no later than 30 days before the first scoping meeting. Scoping meeting plans are similar in content to public hearing plans (see attachment 3 of this part).
32 C.F.R. § 989.18: Scoping. | Justis AI