33 C.F.R. Appendix G to § 222.6 to Part 222
33 C.F.R. Appendix G to § 222.6 to Part 222
Cite as 33 C.F.R. Appendix G to § 222.6 to Part 222 (1998 ed.)
Appendix G to § 222.6 National Program for Inspection of Non-Federal Dams—Monthly Progress Report (RCS-DAEN-CWE-19) I. Instructions for Monthly Progress Report. The indicated information shall be provided in the format shown on page G-2. 1. Division Reporting: 2. Date: 3. Information Required for Each State Regarding Total Number of Inspections Performed (AE Inspections included) (Cumulative): 3.1. Number of Inspections Initiated by on-site inspection or the review of engineering data from project records. 1 1 Each of the initiated inspections reported should be planned for completion within a reasonable period of time (30 days.) 3.2. Number of Inspections Competed (The number of inspection reports which have been submitted to the District Engineer for review and approval). 3.3 Number of Dams Reported to the Governor as Unsafe. 2 2 An unsafe dam is defined as a dam with deficiencies of such a nature that if not corrected could result in the failure of the dam with subsequent loss of lives or substantial property damage. 3.4. Number of Approved Inspection Reports Submitted to the Governor. 4. Information Required for Each State Regarding Inspections Performed Under AE Contracts (Cumulative): 4.1. Number of Dams Contracted for Inspection by AE's with State or Corps. 4.2. Number of Inspections Initiated by AE's by on-site inspection or the review of engineering data from project records. 1 1 See footnote on previous page. 4.3. Number of Inspections Completed by AE's (The number of inspection reports which have been submitted to the District Engineer for review and approval). 4.4. Number of Approved Inspection Reports Prepared by AE's Submitted to the Governor. II. Formation for Monthly Progress Report. National Program for Inspection of Non-Federal Dams—Monthly Progress Report 1. Division Reporting: 2. Date: 3. Information Required for Each State Regarding Total Number of Inspections Performed (Cumulative): State | Inspection Initiated (3.1) | Inspection Completed (3.2) | Unsafe Dams Reported (3.3) | Approved Reports (3.4)
Total 4. Information Required for Each State Regarding Inspections Performed Under A/E Contracts (Cumulative): State | Dams Under A/E Contract (4.1) | A/E Inspections Initiated (4.2) | A/E Inspections Completed (4.3) | A/E Reports Approved (4.4)
Totals