Medicare General Information, Eligibility and Entitlement Manual (Pub. 100-01), Ch. 7 § 50
Contractor Implementation of Change Requests and Compliance with
50 - Contractor Implementation of Change Requests and Compliance with
Technical Direction Letters
(Rev. 11395, Issued:05-04-2022, Effective:05-31-22, Implementation:05-31-22)
POLICY
Contractors shall implement all issued Change Requests (CRs) and comply with all issued
Technical Direction Letters (TDLs). Medicare Administrative Contractors (MACs) shall prepare
and transmit the quarterly Contractor Implementation of Change Request (CRIR) and Technical
Direction Letter Compliance Reports (TCR) reports as directed below.
The CRIR shall contain all CRs to be implemented within that fiscal quarter. If CMS omitted a
CR that should have been included in the report, the contractor shall add the CR to the bottom of
the report in red font. MACs are not required to report on or add Shared System Only CRs (i.e.,
no MAC Responsibility checked).
The TCR shall contain all TDLs issued that fiscal quarter, with the exception of contractor-
specific TDLs. TDLs issued to specific contractor(s) shall be added by that contractor at the
bottom of the report in red font. If CMS omitted a TDL that should have been included in the
report, the contractor shall add the TDL to the bottom of the report in red font.
A CMS Central Office (CO) representative will notify the MACs via a TDL (within two weeks
of the end of each fiscal quarter) that the CRIR and TCR reports are available to download on
Electronic Change Information Management Portal (ECHIMP). MACs shall enter all applicable
information into the reports. MACs shall upload the completed reports into the CMS ART
system. MACs shall also then send the completed reports to the CMS CO mailbox at
CR_IMPL_REPORTS@cms.hhs.gov. NOTE: There are no spaces in this email address.
Underscore “_” separates the words CR_IMPL_REPORTS.
The CRIR and TCR reports are due no later than the 28th of the month in which the reports are
due, as indicated below. If the report due date of the 28th falls on a weekend or a holiday; each
MAC shall submit the report on the next business day following the due date.
• Quarter 1 includes October, November, and December. The report for Quarter 1 is
due no later than February 28th.
• Quarter 2 includes January, February, and March. The report for Quarter 2 is due
no later than May 28th.
• Quarter 3 includes April, May, and June. The report for Quarter 3 is due no later
than August 28th.
• Quarter 4 includes July, August, and September. The report for Quarter 4 is due
no later than November 28th.
Each MAC shall complete and submit one CRIR by jurisdiction, one TCR by jurisdiction, cover
Letter/Attestation Statements, and if necessary, a separate explanation document. MACs with
multiple jurisdictions may complete a separate sheet within a single Excel workbook for each
jurisdiction.
In addition, each contractor shall write and maintain written procedures on its change
management process (i.e., Standard Operating Procedures – SOP). Elements should include, but
are not limited to, written procedures for the timely processing of CMS instructions (issued CRs
and TDLs) from the CMS DRI MAILBOX and CMS TDL MAILBOX, written procedures of the
contractor’s CR and TDL distribution process (including, but not limited to, the dissemination of
provider education information), written procedures for CR implementation and TDL
compliance (including written documentation to verify implementation/compliance).
Contractors shall retain the written documentation to verify CR and TDL
implementation/compliance using CMS’s records retention guidelines.
Upon request from CMS, contractors shall supply the written procedures of their change
management process, as well as written documentation to verify CR and TDL
implementation/compliance to CMS.
Implementation Date
I. Definition
Refer to section 50.4.2 of this chapter for the definition of the implementation date.
II. Supporting Information
For any instruction affecting providers, regardless if there are Systems or Non-systems changes,
CMS gives at least 90 days’ advance notice to the providers. That is, CMS must issue the
instruction at least 90 days prior to the implementation date to give providers enough time to
implement the instruction. The vehicle used to alert providers 90 days prior to an instruction’s
implementation date is the CMS Quarterly Provider Update, which can be accessed at:
http://www.cms.hhs.gov/QuarterlyProviderUpdates/01_Overview.asp
There are four exceptions to the 90 days’ advance notice policy: (1) the instruction is contractor
specific and therefore does not affect providers; (2) the instruction is a correction/clarification
where the previously issued instruction contained typos or errors of fact or omissions; (3) the
instruction is a routine or recurring item (which qualifies it to be included on the Mid-Quarter
List in the Provider Update); and (4) the instruction is approved by the CMS Administrator to be
published immediately or by a certain date.
If a previously issued instruction is re-issued with revised MAC requirements and a revised
implementation date is not specified, MACs shall comply with the revised instruction as soon as
possible but no later than 10 business days from the CR’s date of issuance.
For a system change, the Initiator of the CR will specify an implementation date that corresponds
to one of the quarterly release dates. Usually, the quarterly release date will be the first Monday
of the quarter. Non-recurring system changes are usually issued five months in advance of the
implementation date. On occasion, an off-cycle release date can be approved by OSORA and/or
the Administrator. This exception tends to occur most frequently with the implementation of
National Coverage Determinations (NCDs) and corrections to finals.
For a Non-system change that has no impact on providers, the Initiator of the CR may specify the
implementation date as 30 days from issuance. For a Non-system change that has provider
impact, the Initiator of the CR may specify the implementation date as 90 days from issuance.
After the comment period ends and the Initiator of the CR has addressed all comments, he/she
prepares a final CR package for CMS clearance. The last part of the CMS clearance process
involves obtaining approval from the Medicare Change Control Board (MCCB). The MCCB, in
consultation with the Initiator of the CR, will determine the time period needed for implementing
each change request. After the clearance process is completed, the Office of Strategic
Operations and Regulatory Affairs/Issuances & Records Management Group (OSORA/IRMG)
will insert the actual implementation date before issuing the CR as a final instruction.
COMPLETING AND SUBMITTING THE QUARTERLY CR IMPLEMENTATION
REPORT (CRIR)
Medicare Administrative Contractors (MACs) shall complete the CR Implementation Report, as
follows, for each jurisdiction. MACs with multiple jurisdictions may complete a separate sheet
within a single Excel workbook for each jurisdiction.
If CMS omitted a CR that should have been included in the report, the contractor shall add the
CR to the bottom of the report in red font. MACs shall update the report in the same manner as a
CMS CO entered CR, unless specifically instructed below to exclude specific items.
Header Rows
The report contains three header rows.
1. Header Row 1, Contains the title, “CR Implementation Report (CRIR) – Quarter X
(MMM-MMM) YYYY,” where X is the number of the quarter, MMM-MMM are the
months included in that quarter, and YYYY is the Calendar Year. This data will be
completed by CMS CO.
2. Item 1: Header Row 2, MACs shall enter their Contractor Name and Jurisdiction identifier
in Item 1 of the report.
3. Item 2: Header Row 2, MACs shall enter the “Date Report Submitted” to CMS in Item 2 of
the report in MM/DD/YYYY. [This is the date the report is e-mailed to CMS CO.]
4. Item 3: Header Row 2, Report Due. This is the date the report is due to CMS CO. This
date will be completed by CMS CO.
5. Item 4: Header Row 3, CRIR Contractor Contact (First Name, Last Name, Phone). MACs
shall enter the first name, last name, and phone number of the individual CMS CO should
contact to ask questions regarding information in this report. Contact must be
knowledgeable on the contents of the report.
Details Rows
Below the header Rows, Detail Rows shall be completed as follows:
1. Item 5 (No.) - This field contains a consecutive number to track the number of CRs on the
report. CMS CO will complete this field for all CRs included on the report. If the
contractor adds additional CRs, they should continue numbering from the previous CMS
entered row in red font. For example, if CMS included 15 CRs on the report, the contractor
shall begin numbering in this field with 16 in red font.
2. Item 6 (CMS CR #) - CMS CO will complete this field with the CMS CR numbers
implemented during the quarter.
3. Item 7 (CMS Transmittal #) - CMS CO will not complete this field.
4. Item 8 (Subject) - CMS CO will complete this field with the subject for all CMS CRs
implemented during the quarter.
5. Item 9 (CMS Published Implementation Date MM/DD/YYYY) - CMS CO will complete
this field with the CMS Published Implementation date in MM/DD/YYYY format for all
CRs implemented during the quarter.
6. Item 10 (Applicable Workload? (“X” or blank)) - MACs shall complete this field with an
“X” for all CRs applicable to their workload or leave the field blank if the CR is not
applicable to their workload. The CR is considered applicable to the contractor if any of
the business requirements in the CR were required to be implemented by the contractor in
the reporting period. Note: Shared System Only CRs (with no MAC responsibility
checked) are considered not applicable.
7. Item 11 (Completed by Implementation Date? (“Y”, “N”, or blank)) - MACs shall
complete this field with a ‘Y” for all CRs implemented on or before the CMS Published
Implementation Date indicated in Item 9. MACs shall complete this field with an “N” for
all CRs that have not been implemented by the implementation date and MACs must select
a Reason for Delay from Item 12. This field shall remain blank if the CR is not applicable
to the contractor (i.e. Item 10 is blank).
8. Item 12 (Reasons for Delay (leave blank if implemented by due date)) - This field shall
remain blank if the CR has been implemented on or before the CMS Published
Implementation date (Item 11 is “Y”) or is not applicable to the contractor workload (i.e.
Item 10 is blank). MACs shall select one of the following Reasons for Delay from the
drop-down list for all applicable CRs not completed by the CMS Published Implementation
date indicated in Item 9 (i.e. Item 10 has an ‘x’ and Item 11 has a “N”):
01. Due date changed due to TDL
02. Due date changed due to CR
03. Retired: MLN delay is retired as a reason for delay
04. CMS delay of file transmission
05. System related delay
06. CR extension approved or pending
07. Deadline past quarter end date
08. Other
Reason 01 (Due date changed due to TDL) - Applies only in situations where CMS has issued a
TDL which directs contractors to hold claims and/or otherwise delay the work related to that
specific CR.
Reason 02 (Due date changed due to CR) – Applies only in the following situations:
a. Correction final changed the CMS Published Implementation date to be different
than the date indicated in Item 9;
b. CR was rescinded/replaced with a different CR number that changed the CMS
Published Implementation date to be different than the date indicated in Item 9;
c. Correction or Rescinded/Replaced CR changed the due date of specific Business
Requirements.
Reason 03 (CMS MLN Matters® Article Delay) – Retired
Reason 04 (CMS delay of file transmission) - Applies only in situations when the file needed to
complete work indicated in the CR was not available timely (i.e., payment files related to annual
recurring CRs such as the HCPCS, Pricer, and OPPS).
Reason 05 (System related delay) – Applies only in the following situations:
a. Shared System Maintainer (SSM) production problem prevents a MAC from
completing a specific task in the CR;
b. Non-MAC maintained system (e.g., PECOS, HIGLAS, CWF, etc.) production
problem prevents a MAC from completing a specific task in the CR.
Reason 06 (CR extension approved or pending) - Applies only in situations where CMS
Contracting Officer Representative (COR) has approved an extension of the implementation date
specifically referencing this CR.
Reason 07 (Deadline past quarter end date) - Applies only in the following situations:
a. CRs with multiple implementation dates;
b. CRs that contain instruction for work to be done after the implementation date
listed in the CR.
Reason 08 (Other) - Applies in all other situations where the implementation of the CR was
delayed, and Reasons for Delay 01 through 07 do not apply.
9. Item 13 (Additional Explanation) - MACs shall enter additional comments regarding the
implementation of this CR in this field if a Reason for Delay is selected. Do not update this
field for CRs implemented timely.
For the following Reasons for Delay, MACs shall include the following data:
Reason 01 (Due date changed due to TDL) - TDL reference number (TDL-######) of the
specific TDL which grants an extension and the date to which the extension was granted. Note
the actual implementation date of the CR requirements.
Reason 02 (Due date changed due to CR) - Issued date of the Correction final, CR number and
issued date of replacement CR (if applicable), and the revised implementation date. Note the
actual implementation date of the CR requirements.
Reason 03 (MLN delay) – Retired
Reason 04 (CMS delay of file transmission) - Name of the delayed file, date that the file was
expected, and the date the file was actually received. Note the actual implementation date of the
CR requirements.
Reason 05 (System related delay) – Name of the system, specific production problem
identification number, description of the issue, and resolution date (if applicable). Note the
actual implementation date of the CR requirements.
Reason 06 (CR extension approved or pending) - Name of COR, date approval received, and the
revised due date. Note the actual implementation date of the CR requirements.
Reason 07 (Deadline past quarter end date) - Note impacted business requirement numbers and
the delayed implementation date(s). MACs shall add this CR to the bottom of the CRIR report in
red font for the CRIR report of the quarter where MACs completed their work.
Reason 08 (Other) – Explanation of the delay for situations not applicable to Reasons for Delay
01 through 07. Use the space allowed in Item 13. If additional space is needed, MACs may
submit with the completed CR Implementation report on a separate explanation document.
Provide the following information in a clear and concise manner:
a. Cause of the delay;
b. If not the entire CR, reference the specific delayed Business Requirements;
c. Description of specific tasks that were delayed;
d. Indicate what is the impact to the government and resolution of the issue that
delayed the CR implementation;
e. Note the actual implementation date of the CR requirements.
10. CRIR Totals. This section summarizes the totals for the detail rows.
a. Item 14 (Total number of CRs in this report) - This field is calculated. The contractor
shall not update this field. NOTE: This formula sums both CRs added by CMS and
any additional rows of CRs added by the contractor on the spreadsheet.
b. Item 15 (Number of CRs applicable to the contractor) – This field is calculated. The
contractor shall not update this field. NOTE: This formula counts CRs that the
contractor has indicated are applicable by marking an “X” in Column F.
c. Item 16 (Number of applicable CRs completed by the Implementation Date) - This
field is calculated. The contractor shall not update this field. NOTE: This formula
counts CRs that the contractor has indicated were implemented timely by marking a
“Y” in Column G.
d. Item 17 (% of applicable CRs completed by Implementation Date) - This field is
calculated. The contractor shall not update this field. This field reflects the
percentage of applicable CRs completed by the Implementation date, regardless of
CMS or contractor-controlled reasons for delay. NOTE: This formula calculates a
percentage from Item 15 and Item 16.
e. Item 18 (% of applicable CRs completed timely) - This field is calculated. The
contractor shall not update this field. This field reflects the percentage of applicable
CRs implemented timely, regardless of contractor-controlled reasons for delay, as
indicated by a selection of Reason for Delay 8 (Other). NOTE: This formula
calculates a percentage from the total number of Reason for Delay 08 indicated in
Item 19 and the total number of CRs applicable to the contractor in Item 15.
11. Each MAC shall complete and submit one CRIR report by jurisdiction, a cover
Letter/Attestation Statement (located on tab 1 of the CRIR Report Template or the Sample
in Section 50.3), and if necessary, a separate explanation document. MACs with multiple
jurisdictions may complete a separate sheet within a single Excel workbook for each
jurisdiction. By the quarterly due date, each MAC shall submit the CRIR report, via e-mail
to the CMS CO mailbox. [The CMS CO mailbox is: CR_IMPL_REPORTS@cms.hhs.gov.
NOTE: There are no spaces in this Web address. Underscore “_” separates the words
CR_IMPL_REPORTS.] If the report due date of the 28th falls on a weekend or a holiday,
each contractor, including MACs, shall submit the report on the next business day
following the due date.
12. Each MAC shall upload the report to the CMS ART system.
COMPLETING AND SUBMITTING THE QUARTERLY TDL COMPLIANCE
REPORT
Medicare Administrative Contractors (MACs) shall complete the TDL Compliance Report
(TCR) for each jurisdiction as follows. MACs with multiple jurisdictions may complete a
separate sheet within a single Excel workbook for each jurisdiction (name each tab accordingly).
There are some TDLs not issued to all Contractors. If a MAC received a TDL in the reporting
period, the TDL should be included on the report. If CMS omitted a TDL that should have been
included in the report, the contractor shall add the TDL to the bottom of the report in red font.
MACs shall update the report in the same manner as a CMS CO entered TDL, with the exception
of Item 7 (CMS Component). For Contractor added rows, Item 7 may remain blank.
Header Rows
The report contains four header rows.
1. Header Row 1, Contains the title, “TDL Compliance Report (TCR) – Quarter X (MMM-
MMM) YYYY,” where X is the number of the quarter, MMM-MMM are the months
included in that quarter, and YYYY is the Calendar Year. This data will be completed by
CMS CO.
2. Item 1: Header Row 2, MACs shall enter their Contractor Name and Jurisdiction identifier
in Item 1 of the report.
3. Item 2: Header Row 2, MACs shall enter the “Date Report Submitted” to CMS in Item 2 of
the report in MM/DD/YYYY format. [This is the date the report is e-mailed to CMS CO.]
4. Item 3: Header Row 2, Report Due. This is the date the report is due to CMS CO. This
date will be completed by CMS CO.
5. Item 4: Header Row 3, TCR Contractor Contact (First Name, Last Name, Phone). MACs
shall enter the first and last name of the individual CMS CO should contact to ask
questions regarding information in this report. The contact must be knowledgeable on the
contents of the report.
Detail Rows
Below the Header Rows, Detail Rows shall be completed as follows:
1.Item 5: No. This field contains a consecutive number to track the number of TDLs on the
report. CMS CO will complete this field for all TDLs included on the report by CO. If
the contractor adds additional TDLs, they should continue numbering from the previous
CMS entered row in red font. For example, if CMS included 15 TDLs on the report, the
contractor shall begin numbering in this field with 16 in red font.
2.Item 6: TDL #. CMS CO will complete this field with the TDL number for each public
TDL issued during the quarter.
3.Item 7: CMS Component. CMS CO will complete this field with the CMS Component
responsible for issuing the TDL. [If MACs added the TDL to the report, they do not need
to complete item 7 for those TDLs.]
4.Item 8: Subject. CMS CO will complete this field with the subject for all TDLs issued
during the quarter.
5.Item 9: CMS Issued Date MM/DD/YYYY. CMS CO will complete this field with the
Issued date in MM/DD/YYYY format for all TDLs issued during the quarter.
6.Item 10: Applicable Workload? (“X” or blank). MACs shall complete this field with an
“X” for all TDLs applicable to their workload or leave blank if the TDL is not applicable
to their workload. The TDL is considered applicable to the contractor if any action in the
TDL were required to be completed by the contractor in the reporting period.
7.Item 11: Contractor Compliance? (“Y”, “N” or blank). MACs shall complete this field with
a “y” for all applicable TDLs that the contractor has received, reviewed and complied
with the instructions in the TDL. MACs shall complete this field with a “n” for all
applicable TDLs that the contractor has received and reviewed, but has not complied with
the instructions in the TDL. This field shall remain blank if the TDL is not applicable to
the contractor (i.e. Item 10 is blank).
8.Item 12: Reason for Delay (Leave blank if in compliance). This field shall remain blank if
the TDL has been complied with on or before the due date (i.e. Item 11 is a “y”) or is not
applicable to contractor workload (i.e. Item 11 is blank). If the contractor did not comply
with the instructions in the TDL (i.e. Item 11 is a “n”), the contractor shall select one of
the following reasons from the drop-down list in this field:
01. Due date changed due to TDL
02. Due date changed due to CR
03. System Changes Required to Comply
04. TDL extension approved or pending
05. Deadline past quarter end date
06. Other
01 (Due date changed due to TDL) – Applies only in situations where CMS has issued a
subsequent TDL which corrects and/or replaces previous direction provided under the original
TDL.
02 (Due date changed due to CR) - Applies only in situations where CMS has issued a CR that
supersedes direction provided previously in this specific TDL.
03 (System Changes Required to Comply) – Applies only in the following situations:
a. Shared System Maintainer (SSM) production problem prevents a MAC from
completing a specific task in the TDL;
b. Non-MAC maintained system (e.g., PECOS, HIGLAS, CWF, etc.) production
problem prevents a MAC from completing a specific task in the TDL;
c. MAC is unable to accomplish a specific task in the TDL without SSM system
changes.
04 (TDL extension approved or pending) – Applies only in situations where the CMS
Contracting Officer Representative (COR) has approved an extension of the due date specified in
the TDL.
05 (Deadline past quarter end date) – Applies only in the situations where some or all of the tasks
in the TDL are due to be completed beyond the reporting period of the TCR report.
06 (Other) – Applies in all other situations where compliance with the TDL was delayed, but
Reasons for Delay 01 through 05 does not apply.
9.Item 13: Additional Explanation. MACs shall enter additional comments regarding the
compliance of the TDL in this field if a Reason for Delay is selected in Item 12. Do not
update this field for TDLs complied with timely.
For the following Reasons for Delay (Item 12), MACs shall include the following data in Item
13:
01 (Due date changed due to TDL) – TDL reference number (TDL-######) of the specific TDL
which corrects and replaces the previous TDL. Note the actual date of compliance with the
TDL.
02 (Due date changed due to CR) – CR number and issued date of the CR which supersedes the
TDL. Note the implementation date of the CR.
03 (System Changes Required to Comply) – If a production problem prevents compliance,
provide: name of the system, specific production problem identification number, and resolution
date (if applicable). Note the actual date of compliance with the TDL. If shared system changes
are needed to comply, describe necessary change and any steps taken to notify CMS of the
discrepancy.
04 (TDL extension approved or pending) – Name of the COR, date approval received, and the
revised due date. Note the actual date of compliance with the TDL.
05 (Deadline past quarter end date) – Note specific tasks and the due dates beyond the TCR
reporting period. MACs shall add this TDL to the bottom of the TCR report in red font for the
TCR report of the quarter where MACs completed their work.
06 (Other) – Explanation of the delay for situations not applicable to Reasons for Delay 01
through 05. Use the space allowed in Item 13. If additional space is needed, MACs may submit
with the completed TCR report a separate explanation document. Provide the following
information in a clear and precise manner:
a. Cause of the delay;
b. If not the entire TDL, reference the specific delayed task;
c. Description of specific tasks that were delayed;
d. Indicate what is the impact to the government and resolution of the issue with the
TDL implementation;
e. Note the actual date of compliance with the TDL.
10. TCR Totals. This section summarizes the totals for the detail rows.
a. Item 14 (Total number of TDLs in this report) – This field is calculated. The
contractor shall not update this field. NOTE: this formula sums both TDLs added
by CMS and any additional rows of TDLs added by the contractor on the
spreadsheet.
b. Item 15 (Number of TDLs applicable to the contractor) – This field is calculated.
The contractor shall not update this field. NOTE: this formula counts TDLs that
the contractor has indicated are applicable by marking an “x” in Column F.
c. Item 16 (Number of applicable TDLs by compliance date) – This field is
calculated. The contractor shall not update this field. NOTE: This formula counts
TDLs that the contractor has indicated were completed timely by marking a “y” in
Column G.
d. Item 17 (% of applicable TDLs by compliance date) – This field is calculated.
The contractor shall not update this field. This field reflects the percentage of
applicable TDLs complied with by the due date, regardless of CMS or contractor-
controlled reasons for delay. NOTE: This formula calculates a percentage from
Item 15 and Item 16.
e. Item 18 (% of applicable TDLs completed timely) – This field is calculated. The
contractor shall not update this field. This field reflects the percentage of
applicable TDLs complied with timely, regardless of contractor-controlled
reasons for delay, as indicated by a selection of Reason for Delay 6 (Other).
NOTE: This formula calculates a percentage from the total number of Reason for
Delay 06 indicated in Item 19 and the total number of TDLs applicable to the
contractor in Item 15.
11. Each MAC shall complete and submit one TCR report by jurisdiction, a cover
Letter/Attestation Statement (located on tab 1 of the TCR Report Template or in Section
50.3), and if necessary, a separate explanation document. MACs with multiple
jurisdictions may complete a separate sheet within a single Excel workbook for each
jurisdiction. By the quarterly due date, each MAC shall submit the TCR report, via e-mail
to the CMS CO mailbox. [The CMS CO mailbox is: CR_IMPL_REPORTS@cms.hhs.gov.
NOTE: There are no spaces in this Web address. Underscore “_” separates the words
CR_IMPL_REPORTS.] If the report due date of the 28th falls on a weekend or a holiday,
each contractor, including MACs, shall submit the report on the next business day
following the due date.
12. Each MAC shall upload the report to the CMS ART system.