State Operations Manual (Pub. 100-07), Ch. 2 § 2704
SA Presurvey Preparation
2704 - SA Presurvey Preparation
(Rev. 1, 05-21-04)
The SA, in preparation for the survey/resurvey, reviews documents of record including
licensure records, fire inspection reports, previous survey reports including LSC and
complaints, media reports about the facility, and other publicly available information
about the facility (e.g., its own Web site). This information is helpful in determining
composition of the survey team and the time required for the survey or resurvey.
If an onsite survey is necessary, the SA schedules the survey in a manner that results in the
most efficient and effective use of survey staff and that provides the most comprehensive
look at the facility. The survey is to be completed promptly and is not to be interrupted by
other activities. Moreover, in the case of SNFs/NFs, at least ten percent of standard
surveys must begin on weekends or in the evening/early morning hours. Of these ten
percent, the standard survey must be conducted on consecutive days, with all surveyors
being onsite some or all of those consecutive days. (See §7207 and note.)
The SA reviews the applicable provider/supplier sections of this part to ascertain whether
other special preparation is needed prior to survey and the SA develops factors such as this
before the survey is conducted.