State Operations Manual (Pub. 100-07), Ch. 6 § 6136.2
Compliance Based on an Acceptable AoC/PoC
6136.2 - Compliance Based on an Acceptable AoC/PoC
(Rev. 230; Issued: 07-11-25; Effective: 07-11-25; Implementation: 07-11-25)
Compliance based on an acceptable AoC or PoC reflects the findings that all
applicable standards and conditions are met. The surveyor is certifying that the
laboratory is able to provide test results without hazard to the health and safety of
patients. Laboratories having deficiencies must correct them within an acceptable
time frame (no later than 12 months after the date survey is completed).
In reviewing the PoC, the SA evaluates whether or not the corrective action will result
in compliance within the time frame indicated and whether that time frame is
acceptable. If after two submissions, the laboratory does not submit an acceptable PoC
or if it fails to correct its deficiencies, the SA notifies CMS.