Medicare Program Integrity Manual (Pub. 100-08), Ch. 12 § 12.4.3
Providing Feedback Information to the CERT Review
12.4.3 – Providing Feedback Information to the CERT Review
Contractor
(Rev. 13678; Issued: 03-12-26; Effective: 04-13-26; Implementation: 04-13-26)
A. Requests for Feedback Information
• Feedback is the mechanism by which the CERT review contractor notifies MACs
of CERT review decisions. It also serves as the mechanism by which the MAC
provides the CERT program with corrected pricing, which allows the program to
determine the difference between what was allowed on the original claim and the
amount that should have been allowed based on the CERT decision. Daily, the
CERT review contractor posts a description of errors it has found for each claim
on the C3HUB.
• The MAC shall correctly enter the “Recalculated Allowed Amount” in MAC
feedback for all claims where the CERT review contractor disagreed with the
MAC decision in adjudicating the claim.
• The “Recalculated Allowed Amount” is not the paid amount. The recalculated
allowed amount is the amount paid to the provider (or beneficiary) plus any
deductible applied to this claim plus the copayment amount.
o When co-insurance or a deductible was applied to a claim/line resulting in
no payment to the provider, the MAC should enter the “Recalculated
Allowed Amount” equal to the allowed amount before the deductible
and/or co-insurance was applied. An entry of zero in the recalculated
allowed amount results in payment error equal to the deductible or co-
insurance applied.
• Each MAC shall submit feedback information for all lines within 30 days of the
date posted to C3HUB unless the MAC is actively working with the provider to
obtain additional documentation for CERT review. Each MAC shall complete all
the lines in the feedback process prior to the cut-off date for the report period. If
the feedback is not submitted by the end of the cut-off date for a report period, the
lines will be counted as full payment errors. Deadlines for completing feedback
are listed on the C3HUB under calendar of events which can be accessed from the
main MAC Central page.
• A MAC may contact the CERT review contractor MAC feedback coordinator, via
the collaboration feature on the C3HUB, to request clarification about the results
of a CERT review.
B. Repricing
The MAC shall calculate the corrected allowed amount for each claim on the feedback
report. The MAC shall take special care to report accurate information in the recalculated
final allowed amount field. The recalculated final allowed amount is the amount that
would be allowed for the line if the claim were paid at the level indicated after the CERT
review. It includes the paid amount, coinsurance, deductibles, and offsets. When
appropriate, the MAC shall report recalculated final allowed amounts as the output from
a payment calculator such as the PRICER prospective payment system (PPS). The
PRICER PPS automatically adds the outlier payments into this output. Therefore, the
outlier payment amount in value code 17 should not be added or subtracted from the
recalculated final allowed amount.
C. Claims that are canceled/replaced on or after the date of the transaction file
The CERT review contractor shall review the most current version of the claim that
finalized before the date of the transaction file. Any cancelations, adjustments, or other
actions that occur on or after the date of the transaction file are not applicable to the
CERT program reporting.
If the claim is canceled/replaced on or after the transaction file date:
• Feedback shall reflect the CERT decision.
• Appeal information shall not be entered in the C3HUB.
For the payment adjustment information in the C3HUB, the MAC may enter that the
claim was canceled/replaced on or after the transaction file date and no payment or
collection occurred. The MAC shall not use a CERT review decision from a claim that is
canceled/replaced on or after the date of the transaction file on an adjustment claim.