82 FR 8659
Construction of American Pipelines
[Federal Register Volume 82, Number 18 (Monday, January 30, 2017)]
[Presidential Documents]
[Page 8659]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-02031]
Presidential Documents
Federal Register / Vol. 82 , No. 18 / Monday, January 30, 2017 /
Presidential Documents
[[Page 8659]]
Memorandum of January 24, 2017
Construction of American Pipelines
Memorandum for the Secretary of Commerce
The Secretary of Commerce, in consultation with all
relevant executive departments and agencies, shall
develop a plan under which all new pipelines, as well
as retrofitted, repaired, or expanded pipelines, inside
the borders of the United States, including portions of
pipelines, use materials and equipment produced in the
United States, to the maximum extent possible and to
the extent permitted by law. The Secretary shall submit
the plan to the President within 180 days of the date
of this memorandum.
``Produced in the United States'' shall mean:
(i) With regard to iron or steel products, that all manufacturing processes
for such iron or steel products, from the initial melting stage through the
application of coatings, occurred in the United States.
(ii) Steel or iron material or products manufactured abroad from semi-
finished steel or iron from the United States are not ``produced in the
United States'' for purposes of this memorandum.
(iii) Steel or iron material or products manufactured in the United States
from semi-finished steel or iron of foreign origin are not ``produced in
the United States'' for purposes of this memorandum.
The Secretary of Commerce is hereby authorized and
directed to publish this memorandum in the Federal
Register.
(Presidential Sig.)
THE WHITE HOUSE,
Washington, January 24, 2017
[FR Doc. 2017-02031
Filed 1-27-17; 8:45 am]
Billing code 3510-07-P