Federal (United States) · Regulations
Subpart 3275 — Conducting Utilization Operations
12 sections
12 sections
- 43 C.F.R. § 3275.10How do I change my operations if I have an approved facility construction or commercial use permit?
- 43 C.F.R. § 3275.11What are a facility operator's obligations?
- 43 C.F.R. § 3275.12What environmental and safety requirements apply to facility operations?
- 43 C.F.R. § 3275.13How must the facility operator measure the geothermal resources?
- 43 C.F.R. § 3275.14What aspects of my geothermal operations must I measure?
- 43 C.F.R. § 3275.15How accurately must I measure my production and utilization?
- 43 C.F.R. § 3275.16What standards apply to installing and maintaining meters?
- 43 C.F.R. § 3275.17What must I do if I find an error in a meter?
- 43 C.F.R. § 3275.18May BLM require me to test for byproducts associated with geothermal resource production?
- 43 C.F.R. § 3275.19How do I apply to commingle production?
- 43 C.F.R. § 3275.20What will BLM do if I waste geothermal resources?
- 43 C.F.R. § 3275.21May BLM order me to drill and produce wells on my lease?