Federal (United States) · Regulations
Subpart OOOOb — Standards of Performance for Crude Oil and Natural Gas Facilities for Which Construction, Modification or Reconstruction Commenced After December 6, 2022
28 sections
28 sections
- 40 C.F.R. § 60.5360bWhat is the purpose of this subpart?
- 40 C.F.R. § 60.5365bAm I subject to this subpart?
- 40 C.F.R. § 60.5370bWhen must I comply with this subpart?
- 40 C.F.R. § 60.5371bWhat GHG and VOC standards apply to super-emitter events?
- 40 C.F.R. § 60.5375bWhat GHG and VOC standards apply to well completions at well affected facilities?
- 40 C.F.R. § 60.5377bWhat GHG and VOC standards apply to associated gas wells at well affected facilities?
- 40 C.F.R. § 60.5380bWhat GHG and VOC standards apply to centrifugal compressor affected facilities?
- 40 C.F.R. § 60.5390bWhat GHG and VOC standards apply to process controller affected facilities?
- 40 C.F.R. § 60.5398bWhat alternative GHG and VOC standards apply to fugitive emissions components affected facilities and what inspection and monitoring requirements apply to covers and closed vent systems when using an alternative technology?
- 40 C.F.R. § 60.5399bWhat are the alternative means of emission limitations for GHG and VOC emissions from well completions, liquids unloading operations, centrifugal compressors, reciprocating compressors, fugitive emissions components, and process unit equipment affected facilities; and what are the alternative fugitive emissions standards based on State, local, and Tribal programs?
- 40 C.F.R. § 60.5405bWhat standards apply to sweetening unit affected facilities?
- 40 C.F.R. § 60.5408bWhat is an optional procedure for measuring hydrogen sulfide in acid gas—Tutwiler Procedure?
- 40 C.F.R. § 60.5411bWhat additional requirements must I meet to determine initial compliance for my covers and closed vent systems?
- 40 C.F.R. § 60.5412bWhat additional requirements must I meet for determining initial compliance of my control devices?
- 40 C.F.R. § 60.5413bWhat are the performance testing procedures for control devices?
- 40 C.F.R. § 60.5415bHow do I demonstrate continuous compliance with the standards for each of my affected facilities?
- 40 C.F.R. § 60.5416bWhat are the initial and continuous cover and closed vent system inspection and monitoring requirements?
- 40 C.F.R. § 60.5417bWhat are the continuous monitoring requirements for my control devices?
- 40 C.F.R. § 60.5420bWhat are my notification, reporting, and recordkeeping requirements?
- 40 C.F.R. § 60.5422bWhat are my additional reporting requirements for process unit equipment affected facilities?
- 40 C.F.R. § 60.5423bWhat are my additional recordkeeping and reporting requirements for sweetening unit affected facilities?
- 40 C.F.R. § 60.5425bWhat parts of the General Provisions apply to me?
- 40 C.F.R. § 60.5432bHow do I determine whether a well is a low pressure well using the low pressure well equation?
- 40 C.F.R. Table 1 to Subpart OOOOb of Part 60Table 1 to Subpart OOOO b of Part 60—Alternative Technology Periodic Screening Frequency at Well Sites, Centralized Production Facilities, and Compressor Stations Subject to AVO Inspections With Quarterly OGI or EPA Method 21 Monitoring
- 40 C.F.R. Table 2 to Subpart OOOOb of Part 60Table 2 to Subpart OOOO b of Part 60—Alternative Technology Periodic Screening Frequency at Well Sites and Centralized Production Facilities Subject to AVO Inspections and/or Semiannual OGI or EPA Method 21 Monitoring
- 40 C.F.R. Table 3 to Subpart OOOOb of Part 60Table 3 to Subpart OOOO b of Part 60—Required Minimum Initial SO 2 Emission Reduction Efficiency (Z i )
- 40 C.F.R. Table 4 to Subpart OOOOb of Part 60Table 4 to Subpart OOOO b of Part 60—Required Minimum SO 2 Emission Reduction Efficiency (Z c )
- 40 C.F.R. Table 5 to Subpart OOOOb of Part 60Table 5 to Subpart OOOO b of Part 60—Applicability of General Provisions to Subpart OOOO b