Federal (United States) · Regulations
Subpart D — Feasibility Studies
6 sections
6 sections
- 43 C.F.R. § 404.47How will a feasibility study be conducted under this program?
- 43 C.F.R. § 404.48What process will Reclamation follow to determine if a feasibility study is ready for review?
- 43 C.F.R. § 404.49What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction?
- 43 C.F.R. § 404.50What information will be included in the feasibility report prepared by Reclamation.
- 43 C.F.R. § 404.51Are proposed projects under the Rural Water Supply Program reviewed by the Administration?
- 43 C.F.R. § 404.52Who will the feasibility report be provided to?