Subpart 3261 — Drilling Operations: Getting a Permit
13 sections
13 sections
- 43 C.F.R. § 3261.10How do I get approval to begin well pad construction?
- 43 C.F.R. § 3261.11How do I apply for approval of drilling operations and well pad construction?
- 43 C.F.R. § 3261.12What is an operations plan?
- 43 C.F.R. § 3261.13What is a drilling program and how do I apply for drilling program approval?
- 43 C.F.R. § 3261.14When must I give BLM my operations plan?
- 43 C.F.R. § 3261.15Must I give BLM my drilling permit application, drilling program, and operations plan at the same time?
- 43 C.F.R. § 3261.16Can my operations plan, drilling permit, and drilling program apply to more than one well?
- 43 C.F.R. § 3261.17How do I amend my operations plan or drilling permit?
- 43 C.F.R. § 3261.18Do I need to file a bond with BLM before I build a well pad or drill a well?
- 43 C.F.R. § 3261.19When will BLM release my bond?
- 43 C.F.R. § 3261.20How will BLM review applications submitted under this subpart and notify me of its decision?
- 43 C.F.R. § 3261.21How do I get approval to change an approved drilling operation?
- 43 C.F.R. § 3261.22How do I get approval for subsequent well operations?