Federal (United States) · Regulations
Subpart 162.060—Ballast Water Management Systems
20 sections
20 sections
- 46 C.F.R. § 162.060-1Purpose and scope.
- 46 C.F.R. § 162.060-3Definitions.
- 46 C.F.R. § 162.060-5Incorporation by reference.
- 46 C.F.R. § 162.060-10Approval procedures.
- 46 C.F.R. § 162.060-12Use and acceptance of existing test data.
- 46 C.F.R. § 162.060-14Information requirements for the ballast water management system (BWMS) application.
- 46 C.F.R. § 162.060-16Changes to an approved ballast water management system (BWMS).
- 46 C.F.R. § 162.060-18Suspension, withdrawal, or termination of approval.
- 46 C.F.R. § 162.060-20Design and construction requirements.
- 46 C.F.R. § 162.060-22Marking requirements.
- 46 C.F.R. § 162.060-24Test Plan requirements.
- 46 C.F.R. § 162.060-26Land-based testing requirements.
- 46 C.F.R. § 162.060-28Shipboard testing requirements.
- 46 C.F.R. § 162.060-30Testing requirements for ballast water management system (BWMS) components.
- 46 C.F.R. § 162.060-32Testing and evaluation requirements for active substances, preparations, and relevant chemicals.
- 46 C.F.R. § 162.060-34Test Report requirements.
- 46 C.F.R. § 162.060-36Quality Assurance Project Plan (QAPP) requirements.
- 46 C.F.R. § 162.060-38Operation, Maintenance, and Safety Manual (OMSM).
- 46 C.F.R. § 162.060-40Requirements for Independent Laboratories (ILs).
- 46 C.F.R. § 162.060-42Responsibilities for Independent Laboratories (ILs).