Federal (United States) · Regulations
Subpart D — Construction
25 sections
25 sections
- 49 C.F.R. § 195.200Scope.
- 49 C.F.R. § 195.202Compliance with specifications or standards.
- 49 C.F.R. § 195.204Inspection—general.
- 49 C.F.R. § 195.205Repair, alteration and reconstruction of aboveground breakout tanks that have been in service.
- 49 C.F.R. § 195.206Material inspection.
- 49 C.F.R. § 195.207Transportation of pipe.
- 49 C.F.R. § 195.208Welding of supports and braces.
- 49 C.F.R. § 195.210Pipeline location.
- 49 C.F.R. § 195.212Bending of pipe.
- 49 C.F.R. § 195.216Welding: Miter joints.
- 49 C.F.R. § 195.222Welders and welding operators: Qualification of welders and welding operators.
- 49 C.F.R. § 195.224Welding: Weather.
- 49 C.F.R. § 195.226Welding: Arc burns.
- 49 C.F.R. § 195.228Welds and welding inspection: Standards of acceptability.
- 49 C.F.R. § 195.230Welds: Repair or removal of defects.
- 49 C.F.R. § 195.234Welds: Nondestructive testing.
- 49 C.F.R. § 195.246Installation of pipe in a ditch.
- 49 C.F.R. § 195.248Cover over buried pipeline.
- 49 C.F.R. § 195.250Clearance between pipe and underground structures.
- 49 C.F.R. § 195.256Crossing of railroads and highways.
- 49 C.F.R. § 195.258Valves: General.
- 49 C.F.R. § 195.260Valves: Location.
- 49 C.F.R. § 195.262Pumping equipment.
- 49 C.F.R. § 195.264Impoundment, protection against entry, normal/emergency venting or pressure/vacuum relief for aboveground breakout tanks.
- 49 C.F.R. § 195.266Construction records.