40 C.F.R. § 192.03

Monitoring.

Last amended: 2016Year: 2026Length: 93 wordsOfficial source

Cite as 40 C.F.R. § 192.03 (2026)

A groundwater monitoring plan shall be implemented, to be carried out over a period of time commencing upon completion of remedial actions taken to comply with the standards in § 192.02, and of a duration which is adequate to demonstrate that future performance of the system of disposal can reasonably be expected to be in accordance with the design requirements of § 192.02(c). This plan and the length of the monitoring period shall be modified to incorporate any corrective actions required under § 192.04 or § 192.12(c). [60 FR 2866, Jan. 11, 1995]
Cross-references to the CFR
192.02192.04192.12