40 C.F.R. § 262.260

Purpose and implementation of contingency plan.

Last amended: 2017Year: 2026Length: 85 wordsSubsections: 1Official source

Cite as 40 C.F.R. § 262.260 (2026)

(a) A large quantity generator must have a contingency plan for the facility. The contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water. (b) The provisions of the plan must be carried out immediately whenever there is a fire, explosion, or release of hazardous waste or hazardous waste constituents which could threaten human health or the environment.