40 C.F.R. § 265.1058

Standards: Pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service, and flanges and other connectors.

Last amended: 2016Year: 2026Length: 192 wordsSubsections: 1Official source

Cite as 40 C.F.R. § 265.1058 (2026)

(a) Pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service, and flanges and other connectors shall be monitored within 5 days by the method specified in § 265.1063(b) if evidence of a potential leak is found by visual, audible, olfactory, or any other detection method. (b) If an instrument reading of 10,000 ppm or greater is measured, a leak is detected. (c)(1) When a leak is detected, it shall be repaired as soon as practicable, but not later than 15 calendar days after it is detected, except as provided in § 265.1059. (2) The first attempt at repair shall be made no later than 5 calendar days after each leak is detected. (d) First attempts at repair include, but are not limited to, the best practices described under § 265.1057(e). (e) Any connector that is inaccessible or is ceramic or ceramic-lined (e.g., porcelain, glass, or glass-lined) is exempt from the monitoring requirements of paragraph (a) of this section and from the recordkeeping requirements of § 265.1064 of this subpart. [55 FR 25512, June 21, 1990, as amended at 61 FR 59971, Nov. 25, 1996]
Cross-references to the CFR
265.1057265.1059.265.1063265.1064
40 C.F.R. § 265.1058: Standards: Pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service, and flanges and other connectors. | Justis AI