40 C.F.R. § 270.71

Operation during interim status.

Last amended: 2016Year: 2026Length: 75 wordsSubsections: 1Official source

Cite as 40 C.F.R. § 270.71 (2026)

(a) During the interim status period the facility shall not: (1) Treat, store, or dispose of hazardous waste not specified in part A of the permit application; (2) Employ processes not specified in part A of the permit application; or (3) Exceed the design capacities specified in part A of the permit application. (b) Interim status standards. During interim status, owners or operators shall comply with the interim status standards at 40 CFR part 265.
40 C.F.R. § 270.71: Operation during interim status. | Justis AI