40 C.F.R. Table B-4 to Subpart B of Part 53

Line Voltage and Room Temperature Test Conditions

Last amended: 2016Year: 2026Length: 126 wordsOfficial source

Cite as 40 C.F.R. Table B-4 to Subpart B of Part 53 (2026)

Test day Line voltage, 1 rms Room temperature, 2 °C Comments 0 115 25 Initial set-up and adjustments. 1 125 20 2 105 20 3 125 30 Adjustments and/or periodic maintenance permitted at end of tests. 4 105 30 5 125 20 6 105 20 Adjustments and/or periodic maintenance permitted at end of tests. 7 125 30 Examine test results to ascertain if further testing is required. 8 105 30 9 125 20 Adjustments and/or periodic maintenance permitted at end of tests. 10 105 20 11 125 30 12 105 30 Adjustments and/or periodic maintenance permitted at end of tests. 13 125 20 14 105 20 15 125 30 1 Voltage specified shall be controlled to ±1 volt. 2 Temperatures shall be controlled to ±1 °C.
40 C.F.R. Table B-4 to Subpart B of Part 53: Line Voltage and Room Temperature Test Conditions | Justis AI