This section applies to smelters which are required to submit a SIP Compliance Schedule as discussed below. (a) Each SIP Compliance Schedule required by § 57.201(d) (2) and (3) must contain the following elements: (1) Description of the overall design of the SO 2 control system(s) to be installed; (2) Descriptions of specific process hardware to be used in achieving compliance with the SIP emission limitation including gas capacity values; (3) The date by which contracts will be let or purchase orders issued to accomplish any necessary performance improvements; (4) The date for initiating on-site construction or installation of necessary equipment; (5) The date by which on-site construction or installation of equipment is to be completed; (6) The date for achievement of final compliance with SIP emission limitations; and (7) Any other measures necessary to assure compliance with all SIP requirements as expeditiously as practicable. (b) Operations of SCS. Smelters to which § 57.705 is applicable must comply with all elements of § 57.703.
Cross-references to the CFR
57.20157.703.57.705
40 C.F.R. § 57.705: Contents of SIP Compliance Schedule required by § 57.201(d) (2) and (3). | Justis AI