40 C.F.R. § 60.2600

How do I comply with the increment of progress for submittal of a control plan?

Last amended: 2016Year: 2026Length: 115 wordsOfficial source

Cite as 40 C.F.R. § 60.2600 (2026)

For your control plan increment of progress, you must satisfy the two requirements specified in paragraphs (a) and (b) of this section: (a) Submit the final control plan that includes the five items described in paragraphs (a)(1) through (5) of this section: (1) A description of the devices for air pollution control and process changes that you will use to comply with the emission limitations and other requirements of this subpart; (2) The type(s) of waste to be burned; (3) The maximum design waste burning capacity; (4) The anticipated maximum charge rate; and (5) If applicable, the petition for site-specific operating limits under § 60.2680. (b) Maintain an onsite copy of the final control plan.
Cross-references to the CFR
60.2680.