40 C.F.R. § 60.32d
Compliance times.
Cite as 40 C.F.R. § 60.32d (2026)
Sulfuric acid production units. Planning, awarding of contracts, and installation of equipment capable of attaining the level of the emission guideline established under § 60.31d can be accomplished within 17 months after the effective date of a State emission standard for sulfuric acid mist.
- Cross-references to the CFR
- 60.31d