40 C.F.R. § 60.4765
When does this subpart become effective?
Cite as 40 C.F.R. § 60.4765 (2026)
This subpart takes effect on September 21, 2011. Some of the requirements in this subpart apply to planning a SSI unit and must be completed even before construction is initiated on a SSI unit ( i.e., the preconstruction requirements in §§ 60.4800 and 60.4805). Other requirements such as the emission limits, emission standards, and operating limits apply after the SSI unit begins operation.
- Cross-references to the CFR
- 60.4800