40 C.F.R. § 60.4790

How are these new source performance standards structured?

Last amended: 2016Year: 2026Length: 59 wordsOfficial source

Cite as 40 C.F.R. § 60.4790 (2026)

These new source performance standards contain the nine major components listed in paragraphs (a) through (i) of this section. (a) Preconstruction siting analysis. (b) Operator training and qualification. (c) Emission limits, emission standards, and operating limits. (d) Initial compliance requirements. (e) Continuous compliance requirements. (f) Performance testing, monitoring, and calibration requirements. (g) Recordkeeping and reporting. (h) Definitions. (i) Tables.
40 C.F.R. § 60.4790: How are these new source performance standards structured? | Justis AI